화성시 공원녹지사업소 공고 제2026-202호
시설공사 수의견적 제출 공고
1. 공사개요
공 사 명
2026년 노작공원 무장애길 정비사업
공사현장
동탄구 석우동 64번지 일원
공사기간
착공일로부터 2개월
공사내용
데크로드 철거 및 신설
공사예정금액
(추정금액)
119,330,000
원
입찰서 접수 개시일시
2026.10.15.(목) 15:00
기초금액
119,330,000
원
입찰서 접수 마감일시
2026.10.21.(수) 15:00
추정가격
108,481,818
원
개
찰
일
시
2026.10.21.(수) 16:00
부가가치세
10,848,182
원
개
찰
장
소
화성시 공원녹지사업소
입찰집행관 PC
관급자재비
(도급자설치)
-
원
관급자재비
(관급자설치)
925,100,000
원
※유찰 시 재입찰 시각은 나라장터를 확인하시기 바랍니다. (유찰 시 재입찰에 관한 내용은 응찰업체에 별도로 통보하지 않으며 재입찰 내용을 숙지하지 못하여 발생하는 책임은 입찰자에 있습니다.)
※전산장애 발생 시 개찰시각이 다소 늦어지거나 연기될 수 있습니다.
2. 입찰 및 개찰방식
가. 본 입찰은 전자입찰집행대상 공사입니다.
나. 본 입찰은 총액입찰, 지역제한(화성시), 제한적최저가 대상 공사입니다.
3. 입찰 참가 자격
가. 「지방자치단체를 당사자로 하는 계약에 관한 법률 시행령」제13조 및 동법 시행규칙 제14조의 자격을 구비하고 입찰 공고일 전일 현재 그 주된 영업소의 소재지가 화성시 지역인 업체로서 「건설산업기본법」에 의해 조경식재ㆍ시설물공사업【주력분야: 조경시설물설치공사】[업종코드: 4993]을 충족하는 업체이어야 하며 입찰일(낙찰자는 계약체결일)까지 당해 자격이 계속 유지되어야 합니다.
※ 공사예정금액 4.3억원 미만 전문공사 -「건설산업기본법」제16조제1항제4호에 따라 종합건설사업자 참여제한
나. 조달청에 입찰참가자격등록을 한 자이어야 합니다. 입찰참가자격을 등록하지 않은 자는 국가종합 전자조달시스템 입찰참가등록규정(조달청고시)에 따라 개찰일 전일까지 국가종합전자조달 홈페이지 또는 각 지방조달청에 입찰참가자격 등록을 하여야 합니다.
다. 나라장터 시스템 전자입찰 이용자 등록을 한 자이어야 합니다. 전자입찰 이용자등록을 하지 않은 자는 지정 공인인증기관의 인증서를 교부 받은 후 조달업체 이용약관에 동의한 다음 나라장터 시스템에 이용자등록을 하여야 합니다.
라. 2014.01.01.부터 IP당 투찰 가능 횟수가 1회로 제한됩니다.
마. 한 업체의 소속 대표자 중 1인이 다른 업체의 대표자를 겸임할 경우 해당 업체들이 하나의 입찰에 동시 참여하면 동일인이 2통의 입찰서를 제출한 것으로 간주되어 모두 무효 입찰로 처리됩니다. 이에 따라 대표자가 2인 이상인 업체의 경우 입찰참가자격 등록 시 대표자 전원을 등록하여야 하고, 현재 1인만 등록된 경우에는 변경등록을 하여야 하며, 변경등록을 하지 아니하고 입찰에 참가한 자는 『지방자치단체를 당사자로 하는 계약에 관한 법률 시행규칙』 제42조제5호에 따라 입찰무효 사유에 해당합니다.
5. 현장(과업) 설명일시 및 장소
가. 지방자치단체를 당사자로 하는 계약에 관한 법률 시행령 제15조 제3항의 규정에 의하여 생략하며 설계서, 시방서, 내역서 등의 열람으로 갈음합니다.
나. 열람장소: 화성시 공원녹지사업소 동부공원관리과 ☎031-5189-6962
6. 입찰보증금 납부 및 국고 귀속
가. 입찰보증금은 「지방자치단체를 당사자로 하는 계약에 관한 법률 시행령」 제37조 제3항 제7호의 규정에 의거 면제하되, 입찰금액의 1000분의 25이상에 해당하는 입찰보증금의 납부확약 내용이 명시된 나라장터 전자입찰서의 납부이행 각서로 대신 합니다.
나. 낙찰자는 낙찰 통지를 받은 후 10일 이내에 계약을 체결하여야 하며, 이 기한 내 계약을 체결하지 않을 시 「지방자치단체를 당사자로 하는 계약에 관한 법률 시행령」 제37조제4항 규정에 의거 입찰보증금을 우리 시에 납부하여야 합니다.
7. 입찰의 무효
- 「지방자치단체를 당사자로 하는 계약에 관한 법률 시행령」 제39조 제4항, 동법시행규칙 제42조, 지방자치단체 공사입찰유의서 제14조에 해당하는 입찰과 국가종합전자 조달시스템(G2B) 전자입찰 특별유의서에 반하는 입찰은 무효로 합니다.
8. 복수예비가격 작성 및 예정가격 결정
가. 복수예비가격은 기초금액의 ±3% 범위내에서 15개의 복수예비가격을 국가종합전자조달시스템을 이용하여 작성합니다.
나. 예정가격은 입찰에 참여하는 각 업체가 추첨(2개씩 선택)한 번호 중에서 가장 많이 선택된 4개의 예비가격을 산술 평균한 금액으로 결정합니다.
9. 낙찰자 결정방법
가. 「지방자치단체를 당사자로 하는 계약에 관한 법률 시행령」 제40조 규정 및 지방자치단체 입찰 시 낙찰자결정기준[행정안전부예규]을 적용하여 예정가격 이하로서 예정가격에서 A값을 감액한 금액 대비 견적가격에서 A값을 감액한 금액이 낙찰하한율(89.745%)이상 최저가격 입찰자 순으로 「지방자치단체 입찰 및 계약집행기준」(행정안전부 예규)의 수의계약 운영요령 <별표1>의 배제사유에 해당하지 아니한 자 낙찰자로 결정 합니다.
<입찰가격 평점산식의 A값>은 7,051,271원이며 본 공사의 A값 항목(나라장터)을 확인하여 투찰금액을 신중히 검토 후 입찰에 참가 하시기 바랍니다.
나. 동일가격으로 입찰한 최저가 입찰자가 2인 이상인 경우에는 전자조달시스템을 통해 자동으로 추첨하는 방식을 통하여 낙찰자를 결정합니다.
10. 청렴이행서약서 제출
계약상대자로 선정된 업체는 계약체결 시에 반드시 대표가 서명한 청렴이행서약서를 제출하여야 합니다.
11. 안전 및 보건 확보 의무
본 입찰에 참가하고자 하는 자는 「중대재해 처벌 등에 관한 법률」 제4조 및 제9조에 따라 종사자의 안전·보건 상 유해 또는 위험을 방지하고 그 이용자 또는 그 밖의 사람의 생명, 신체의 안전을 위하여 해당 사업의 특성 및 규모 등을 고려하여 다음과 같이 조치사항을 이행하여야 합니다.
≪<hp:fwSpace/>계약업체의 안전 및 보건 확보 의무사항(법 제4조, 제9조)≫
① 재해예방에 필요한 인력・예산・점검 등 안전보건관리체계의 구축 및 그 이행
② 재해 발생 시 재발방지 대책의 수립 및 그 이행
③ 중앙행정기관・지자체가 관계 법령에 따라 개선, 시정 등을 명한 사항 이행
④ 안전・보건 관계 법령에 따른 의무이행에 필요한 관리상의 조치
12. 공사근로자 노무비 구분관리 및 지급확인 안내
가. 「지방자치단체 입찰 및 계약집행기준【행정안전부 예규】」제9장 제9절 ‘공사노무비의 구분관리 및 지급확인’ 규정에 의거 원도급자(하수급자 포함)는 매월 모든 근로자의 노무비 청구서(청구내역서, 전월 노무비 지급내역서 첨부)를 감독부서 경유, 회계팀으로 제출하여야 합니다.
※ 직접노무비에 한하여 기성 범위 내에서 청구 가능
나. 착공계 제출 시 「노무비 지급용 전용통장 사본」 및 「노무비 산정서」를 감독부서를 경유하여 회계팀으로 제출하여야 합니다. (「노무비 구분관리 및 지급확인제」합의서 제출)
다. 원도급자(하도급자 포함)는 노무비 전용통장으로 수령한 노무비를 5일(공휴일, 토요일 제외)이내에 건설근로자 개인별 계좌로 지급하고 공사감독관에게 결과를 제출하여야 합니다.
13. 사후정산
가. 국민건강보험료, 국민연금보험료, 노인장기요양보험료, 퇴직공제부금비(이하 “국민건강보험료” 등 이라 함.)
1) 「지방자치단체를 당사자로 하는 계약에 관한 법률 시행령」제89조 및 행정안전부예규 「지방자치단체입찰 및 계약집행기준」제1장 제8절에 의거 기성 및 준공 대가 지급 시 사후정산합니다.
2) 입찰제출 참가자는 입찰금액 산정 시 기초금액과 함께 발표된 국민건강보험료 등을 조정하지 않고 그대로 반영 하여야 합니다.
국민건강보험료
국민연금보험료
노인장기요양보험료
퇴직공제부금비
1,883,583
원
2,488,740
원
247,502
원
1,205,074
원
※ 국민건강보험료 등은 사업장별로 납부하고 납입 확인서 등을 공사대금 준공(청구)시 필히 발주처에 제출하여야 합니다.
나. 산업안전보건관리비 및 품질관리비 입찰제출 참가자는「산업안전보건법」제72조에 의하여 입찰금액을 산정할 때 예비가격 기초금액과 함께 발표된 산업안전보건관리비 금액을 조정하지 않고 그대로 반영하여야 합니다.
산업안전보건관리비
1,226,372
원
입찰제출 참가자는「건설기술진흥법」제56조에 의하여 입찰금액을 산정할 때 예비가격 기초금액과 함께 발표된 품질관리비 금액을 조정하지 않고 그대로 반영하여야 하며 「건설기술진흥법 시행규칙」 별표 6 제3호 다목에 따라 정산하여야 합니다. 품질관리 실적은 영수증 등의 실비 확인을 통해 정산됩니다.
품질시험비
-
원
다. 「건설기술진흥법」제66조제3항에 의하여 환경관리비를 국토교통부령으로 정하는 바에 따라 공사금액에 계상하여야 하며, 발주자는 같은 법 시행규칙 제61조제2항에 의하여 사용실적에 따라 사후 정산하여야 합니다.
라. 「건설산업기본법 시행령」제34조에 의하여 하도급대금 지급보증서 발급에 소요되는 금액을 국토교통부장관이 정하여 고시하는 기준에 따라 산출내역서에 명시하여야 하며, 발주자는 같은법 시행령 제34조의4에 따라 사후 정산할 수 있습니다.
마. 「건설산업기본법 시행령」제68조에 의하여 건설기계대여대금 지급보증서 발급에 소요되는 금액을 국토교통부장관이 정하여 고시하는 기준에 따라 산출내역서에 명시하여야 하며, 발주자는 같은법 시행령 제64조의3에 따라 사후 정산할 수 있습니다.
14. 건설기계임대차 계약 관련사항
가. 「건설산업기본법」제68조의3(건설기계 대여대금 지급보증)에 의하여 수급인 또는 하수급인은 자신이 시공하는 1개의 공사현장에서 대여 받을 건설기계의 현장별 보증서를 착공일 이전에 우리 시에 제출하는 것을 원칙으로 합니다.
나. 건설업자 및 건설기계대여업자는 건설기계 대여계약을 체결한 경우 필히 계약서를 작성하여 계약체결일로부터 15일 이내 현장별 보증서를 발급한 보증기관에 그 건설기계 대여계약서를 제출하여야 하며, 건설기계 대여대금 지급보증서의 발급 사실 및 보증 내용 등을 「건설산업기본법 시행규칙」 별지 제26호의3서식에 따라 공사 현장에 게시해야 합니다.
다. 다만, 아래와 같은 경우 현장별 보증 대신 대여계약별로 보증을 할 수 있습니다.
구 분
내 용
원도급
도급금액이 1억 원 미만이고 공사기간이 5개월 이내(금액과 기간 조건 모두 충족)
하도급
하도급금액이 5천만 원 미만이고 공사기간이 3개월 이내(상동)
공 통
산출내역서 상 건설기계 대여대금의 합계금액이 400만 원 미만
15. 하도급지킴이(정부계약 하도급관리시스템) 이용에 관한 사항
가. 본 공사는 「하도급지킴이」를 이용하는 사업입니다.
나. 낙찰을 받은 자는 「하도급지킴이」를 이용하여 하도급계약을 체결합니다. 다만, 하도급자(장비ㆍ자재업체 포함)와 수기로 하도급계약을 체결하는 경우에도 하도급지킴이에 등록하여야 합니다.
다. 또한, 하도급 대금, 노무비, 장비ㆍ자재대금을 「하도급지킴이」를 이용하여 전자적으로 지급하여야 합니다. 노무비는 '인출 제한' 기능을 사용하며 그 외 하도급대금 등의 지급에 있어 “인출 제한” 기능사용에 대하여 우리 시와 상호 협의하여 결정합니다. 아울러, 우리 시의 하도급대금, 노무비, 장비ㆍ자재대금의 직접지급 또는 적정지급 여부 확인에 적극 응하여야 합니다.
16. 기 타
가. 본 입찰에 참가하고자 하는 자는 반드시 국가종합조달시스템입찰특별유의서, 공사입찰특별유의서, 공사계약일반조건, 공사계약특수조건, 지방자치단체 적격심사세부기준, 지방자치단체공사적격심사 세부기준, 붙임의 공사시방서 등 기타 입찰 및 기타 사항에 필요한 모든 사항을 열람하여 숙지하고 입찰에 응하여야 하며, 숙지하지 못하여 발생되는 책임은 입찰참가자에게 있습니다.
나. 계약상대자는 대가 수령시 15일 이내에 하수급인과 계약상대자와 직접 계약을 체결한 자재·장비업자(하도급사 자재·장비업자 포함)가 시공·제작·대여 분에 대해 현금으로 지급하고, 5일이내 지급내역(수령자, 수령액, 수령이 등 증빙서류)을 발주기관과 공사감독관에게 통보해야 합니다.
다. 화성시에서는 지역경제 및 지역건설산업 활성화 촉진과 육성을 위해 ‘화성시 지역건설산업 활성화 지원 조례’를 시행하고 있으며, 관련 조례에 따라 인력채용 시 화성시민과 숙련노동자 양성기관(건설기능학교 등)을 통한 노동자를 우선적으로 고용하여 주시기 바라며, 공사현장에서 사용되는 각종 자재·건설장비는 불가피한 경우를 제외하고 가급적 화성시 지역 내 생산자재(건설장비)를 사용하시기 바랍니다. 그리고 하도급 계약 체결시 원도급사가 다른 지역 건설산업체일 경우, 관내 건설산업체와의 하도급 비율이 50% 이상이 될 수 있도록 노력하여 주시기 바랍니다.
라. 본 공사는 불법체류 외국인 고용을 금지하며 공사감독관의 요구 시 고용허가서(E-9) 또는 특례고용 외국인근로자(H-2) 근로개시 신고서를 제출하여야 합니다.
마. 낙찰자는 본 공사 추진 시 「건설공사 사업관리방식 검토기준 및 업무수행지침」 제10조에 의거 「산업안전보건법」 및 「건설기술진흥법」 등 관련 법령 및 공사계약문서에 정하는 바에 따라 이행하여야 합니다. 또한 현장안전에 대한 전적인 책임을 가지고 신의와 성실의 원칙에 입각하여 시공하고 안전관리 관련 공사 감독자의 지시에 따라야 하며, 동 내용을 확약하는 문서를 계약체결 시 제출하여야 합니다.
바. 계약대상자는 대금 청구 시에는 공급가액(부가세 제외)의 1.5%에 해당 하는 경기도<hp:fwSpace/>지역개발공채 매입필증을 제출하여야 합니다.
사. 「건설근로자의 고용개선 등에 관한 법률」 제13조 제4항에 따른 일정규모 이상의 사업장에 해당할 경우, 사업주는 근로일수 신고를 위한 전자카드를 피공제자에게 발급하여야 합니다.
아. 낙찰자(계약상대자)는 「공직자의 이해충돌 방지법」 제12조 및 「화성시 공직자의 이해충돌 방지제도 운영지침」 제10조에 따라, “수의계약 체결 제한 대상” 확인을 위한 “확인서” 원본을 계약체결 시 제출해야하며, 수의계약 체결 제한 대상으로 확인될 경우에는 계약을 해제·해지할 수 있습니다.
▸ 화성시 홈페이지[www.hscity.go.kr, 바로가기 서비스 > 화성시 자치법규 원문열람시스템 > 화성시 공직자의 이해충돌 방지제도 운영지침(별지 제10호 서식)] 참고바랍니다.
17. 기타 보충정보 제공처
가. 입찰에 관한 사항: 화성시 공원녹지사업소 공원조성과 ☎031-5189-6231
나. 공사 및 설계내용: 화성시 공원녹지사업소 동부공원관리과 ☎031-5189-6962
다. 전자입찰이용에 관한 사항: 조달청 조달전자 콜센터 ☎1588-0800
라. 입찰결과 안내: 국가종합전자조달시스템(http://www.g2b.go.kr)으로 확인
위와 같이 안내 공고합니다. 2026.10.15. 화 성 시 공원녹지사업소 (분 임)재 무 관
===== 화성시 공원녹지사업소 공고 제2026 202호[2026년 노작공원 무장애길 정비사업].pdf =====
화성시 공원녹지사업소 공고 제2026-202호
시설공사 수의견적 제출 공고
1. 공사개요
공 사 명
2026년 노작공원 무장애길 정비사업 공사현장 동탄구 석우동 64번지 일원 공사기간 착공일로부터 2개월 공사내용 데크로드 철거 및 신설
공사예정금액
(추정금액)
119,330,000 원 입찰서 접수 개시일시
2026.10.15.(목) 15:00 기초금액
119,330,000 원 입찰서 접수 마감일시
2026.10.21.(수) 15:00 추정가격 108,481,818 원 개 찰 일 시 2026.10.21.(수) 16:00 부가가치세 10,848,182 원 개 찰 장 소
화성시 공원녹지사업소
입 찰 집 행 관 PC
관급자재비
(도급자설치)
- 원
관급자재비
(관급자설치)
925,100,000 원
※유찰 시 재입찰 시각은 나라장터를 확인하시기 바랍니다. (유찰 시 재입찰에 관한 내용은 응찰업체에 별도로 통
보하지 않으며 재입찰 내용을 숙지하지 못하여 발생하는 책임은 입찰자에 있습니다.)
※전산장애 발생 시 개찰시각이 다소 늦어지거나 연기될 수 있습니다.
2. 입찰 및 개찰방식
가. 본 입찰은 전자입찰집행대상 공사입니다.
나. 본 입찰은 총액입찰, 지역제한(화성시), 제한적최저가 대상 공사입니다.
3. 입찰 참가 자격
가. 「지방자치단체를 당사자로 하는 계약에 관한 법률 시행령」제13조 및 동법 시행규칙 제14조의 자격을
구비하고 입찰 공고일 전일 현재 그 주된 영업소의 소재지가 화성시 지역인 업체로서 「건설산업기본법」에
의해 조경식재ㆍ시설물공사업【주력분야: 조경시설물설치공사】[업종코드: 4993]을 충족하는 업체이어
야 하며 입찰일(낙찰자는 계약체결일)까지 당해 자격이 계속 유지되어야 합니다.
※ 공사예정금액 4.3억원 미만 전문공사 -「건설산업기본법」제16조제1항제4호에 따라 종합건설사업자 참여제한
나. 조달청에 입찰참가자격등록을 한 자이어야 합니다. 입찰참가자격을 등록하지 않은 자는 국가종합
전자조달시스템 입찰참가등록규정(조달청고시)에 따라 개찰일 전일까지 국가종합전자조달 홈페이지
또는 각 지방조달청에 입찰참가자격 등록을 하여야 합니다.
다. 나라장터 시스템 전자입찰 이용자 등록을 한 자이어야 합니다. 전자입찰 이용자등록을 하지 않은 자는
지정 공인인증기관의 인증서를 교부 받은 후 조달업체 이용약관에 동의한 다음 나라장터 시스템에
이용자등록을 하여야 합니다.
라. 2014.01.01.부터 IP당 투찰 가능 횟수가 1회로 제한됩니다.
마. 한 업체의 소속 대표자 중 1인이 다른 업체의 대표자를 겸임할 경우 해당 업체들이 하나의 입찰에
동시 참여하면 동일인이 2통의 입찰서를 제출한 것으로 간주되어 모두 무효 입찰로 처리됩니다. 이에
따라 대표자가 2인 이상인 업체의 경우 입찰참가자격 등록 시 대표자 전원을 등록하여야 하고, 현재
1인만 등록된 경우에는 변경등록을 하여야 하며, 변경등록을 하지 아니하고 입찰에 참가한 자는
『지방자치단체를 당사자로 하는 계약에 관한 법률 시행규칙』 제42조제5호에 따라 입찰무효 사유에
해당합니다.
5. 현장(과업) 설명일시 및 장소
가. 지방자치단체를 당사자로 하는 계약에 관한 법률 시행령 제15조 제3항의 규정에 의하여 생략하며
설계서, 시방서, 내역서 등의 열람으로 갈음합니다.
나. 열람장소: 화성시 공원녹지사업소 동부공원관리과 ☎031-5189-6962
6. 입찰보증금 납부 및 국고 귀속
가. 입찰보증금은 「지방자치단체를 당사자로 하는 계약에 관한 법률 시행령」 제37조 제3항 제7호의 규정에
의거 면제하되, 입찰금액의 1000분의 25이상에 해당하는 입찰보증금의 납부확약 내용이 명시된 나라장터
전자입찰서의 납부이행 각서로 대신 합니다.
나. 낙찰자는 낙찰 통지를 받은 후 10일 이내에 계약을 체결하여야 하며, 이 기한 내 계약을 체결하지
않을 시 「지방자치단체를 당사자로 하는 계약에 관한 법률 시행령」 제37조제4항 규정에 의거 입찰
보증금을 우리 시에 납부하여야 합니다.
7. 입찰의 무효
- 「지방자치단체를 당사자로 하는 계약에 관한 법률 시행령」 제39조 제4항, 동법시행규칙 제42조, 지방
자치단체 공사입찰유의서 제14조에 해당하는 입찰과 국가종합전자 조달시스템(G2B) 전자입찰 특별
유의서에 반하는 입찰은 무효로 합니다.
8. 복수예비가격 작성 및 예정가격 결정
가. 복수예비가격은 기초금액의 ±3% 범위내에서 15개의 복수예비가격을 국가종합전자조달시스템을 이용하여
작성합니다.
나. 예정가격은 입찰에 참여하는 각 업체가 추첨(2개씩 선택)한 번호 중에서 가장 많이 선택된 4개의
예비가격을 산술 평균한 금액으로 결정합니다.
9. 낙찰자 결정방법
가. 「지방자치단체를 당사자로 하는 계약에 관한 법률 시행령」 제40조 규정 및 지방자치단체 입찰 시
낙찰자결정기준[행정안전부예규]을 적용하여 예정가격 이하로서 예정가격에서 A값을 감액한 금액
대비 견적가격에서 A값을 감액한 금액이 낙찰하한율(89.745%)이상 최저가격 입찰자 순으로 「지방
자치단체 입찰 및 계약집행기준」(행정안전부 예규)의 수의계약 운영요령 <별표1>의 배제사유에 해
당하지 아니한 자 낙찰자로 결정 합니다.
<입찰가격 평점산식의 A값>은 7,051,271원이며 본 공사의 A값 항목(나라장터)을 확인하여 투찰금액을
신중히 검토 후 입찰에 참가 하시기 바랍니다.
나. 동일가격으로 입찰한 최저가 입찰자가 2인 이상인 경우에는 전자조달시스템을 통해 자동으로 추첨
하는 방식을 통하여 낙찰자를 결정합니다.
10. 청렴이행서약서 제출
계약상대자로 선정된 업체는 계약체결 시에 반드시 대표가 서명한 청렴이행서약서를 제출하여야 합니다.
11. 안전 및 보건 확보 의무
본 입찰에 참가하고자 하는 자는 「중대재해 처벌 등에 관한 법률」 제4조 및 제9조에 따라 종사자의 안전·
보건 상 유해 또는 위험을 방지하고 그 이용자 또는 그 밖의 사람의 생명, 신체의 안전을 위하여 해당
사업의 특성 및 규모 등을 고려하여 다음과 같이 조치사항을 이행하여야 합니다.
≪계약업체의 안전 및 보건 확보 의무사항(법 제4조, 제9조)≫
① 재해예방에 필요한 인력・예산・점검 등 안전보건관리체계의 구축 및 그 이행
② 재해 발생 시 재발방지 대책의 수립 및 그 이행
③ 중앙행정기관・지자체가 관계 법령에 따라 개선, 시정 등을 명한 사항 이행
④ 안전・보건 관계 법령에 따른 의무이행에 필요한 관리상의 조치
12. 공사근로자 노무비 구분관리 및 지급확인 안내
가. 「지방자치단체 입찰 및 계약집행기준【행정안전부 예규】」제9장 제9절 ‘공사노무비의 구분관리 및 지급
확인’ 규정에 의거 원도급자(하수급자 포함)는 매월 모든 근로자의 노무비 청구서(청구내역서, 전월
노무비 지급내역서 첨부)를 감독부서 경유, 회계팀으로 제출하여야 합니다.
※ 직접노무비에 한하여 기성 범위 내에서 청구 가능
나. 착공계 제출 시 「노무비 지급용 전용통장 사본」 및 「노무비 산정서」를 감독부서를 경유하여 회계팀으로
제출하여야 합니다. (「노무비 구분관리 및 지급확인제」합의서 제출)
다. 원도급자(하도급자 포함)는 노무비 전용통장으로 수령한 노무비를 5일(공휴일, 토요일 제외)이내에
건설근로자 개인별 계좌로 지급하고 공사감독관에게 결과를 제출하여야 합니다.
13. 사후정산
가. 국민건강보험료, 국민연금보험료, 노인장기요양보험료, 퇴직공제부금비(이하 “국민건강보험료” 등 이라 함.)
1) 「지방자치단체를 당사자로 하는 계약에 관한 법률 시행령」제89조 및 행정안전부예규 「지방자치단체
입찰 및 계약집행기준」제1장 제8절에 의거 기성 및 준공 대가 지급 시 사후정산합니다.
2) 입찰제출 참가자는 입찰금액 산정 시 기초금액과 함께 발표된 국민건강보험료 등을 조정하지 않고
그대로 반영 하여야 합니다.
국민건강보험료
1,883,583 원
국민연금보험료
2,488,740 원
노인장기요양보험료
247,502 원
퇴직공제부금비
1,205,074 원
※ 국민건강보험료 등은 사업장별로 납부하고 납입 확인서 등을 공사대금 준공(청구)시 필히 발주처에 제출하여야 합니다.
나. 산업안전보건관리비 및 품질관리비 입찰제출 참가자는「산업안전보건법」제72조에 의하여 입찰금액을
산정할 때 예비가격 기초금액과 함께 발표된 산업안전보건관리비 금액을 조정하지 않고 그대로 반영
하여야 합니다.
산업안전보건관리비 1,226,372 원
입찰제출 참가자는「건설기술진흥법」제56조에 의하여 입찰금액을 산정할 때 예비가격 기초금액과 함께
발표된 품질관리비 금액을 조정하지 않고 그대로 반영하여야 하며 「건설기술진흥법 시행규칙」 별표 6
제3호 다목에 따라 정산하여야 합니다. 품질관리 실적은 영수증 등의 실비 확인을 통해 정산됩니다.
품질시험비 - 원
다. 「건설기술진흥법」제66조제3항에 의하여 환경관리비를 국토교통부령으로 정하는 바에 따라 공사금액에
계상하여야 하며, 발주자는 같은 법 시행규칙 제61조제2항에 의하여 사용실적에 따라 사후 정산하여야
합니다.
라. 「건설산업기본법 시행령」제34조에 의하여 하도급대금 지급보증서 발급에 소요되는 금액을 국토교통부
장관이 정하여 고시하는 기준에 따라 산출내역서에 명시하여야 하며, 발주자는 같은법 시행령 제34조의4에
따라 사후 정산할 수 있습니다.
마. 「건설산업기본법 시행령」제68조에 의하여 건설기계대여대금 지급보증서 발급에 소요되는 금액을
국토교통부장관이 정하여 고시하는 기준에 따라 산출내역서에 명시하여야 하며, 발주자는 같은법
시행령 제64조의3에 따라 사후 정산할 수 있습니다.
14. 건설기계임대차 계약 관련사항
가. 「건설산업기본법」제68조의3(건설기계 대여대금 지급보증)에 의하여 수급인 또는 하수급인은 자신이
시공하는 1개의 공사현장에서 대여 받을 건설기계의 현장별 보증서를 착공일 이전에 우리 시에 제출하는
것을 원칙으로 합니다.
나. 건설업자 및 건설기계대여업자는 건설기계 대여계약을 체결한 경우 필히 계약서를 작성하여 계약
체결일로부터 15일 이내 현장별 보증서를 발급한 보증기관에 그 건설기계 대여계약서를 제출하여야
하며, 건설기계 대여대금 지급보증서의 발급 사실 및 보증 내용 등을 「건설산업기본법 시행규칙」
별지 제26호의3서식에 따라 공사 현장에 게시해야 합니다.
다. 다만, 아래와 같은 경우 현장별 보증 대신 대여계약별로 보증을 할 수 있습니다.
구 분
원도급
내 용
도급금액이 1억 원 미만이고 공사기간이 5개월 이내(금액과 기간 조건 모두 충족)
하도급
하도급금액이 5천만 원 미만이고 공사기간이 3개월 이내(상동)
공 통
산출내역서 상 건설기계 대여대금의 합계금액이 400만 원 미만
15. 하도급지킴이(정부계약 하도급관리시스템) 이용에 관한 사항
가. 본 공사는 「하도급지킴이」를 이용하는 사업입니다.
나. 낙찰을 받은 자는 「하도급지킴이」를 이용하여 하도급계약을 체결합니다. 다만, 하도급자(장비ㆍ자재
업체 포함)와 수기로 하도급계약을 체결하는 경우에도 하도급지킴이에 등록하여야 합니다.
다. 또한, 하도급 대금, 노무비, 장비ㆍ자재대금을 「하도급지킴이」를 이용하여 전자적으로 지급하여야 합니다.
노무비는 '인출 제한' 기능을 사용하며 그 외 하도급대금 등의 지급에 있어 “인출 제한” 기능사용에
대하여 우리 시와 상호 협의하여 결정합니다. 아울러, 우리 시의 하도급대금, 노무비, 장비ㆍ자재대금의
직접지급 또는 적정지급 여부 확인에 적극 응하여야 합니다.
16. 기 타
가. 본 입찰에 참가하고자 하는 자는 반드시 국가종합조달시스템입찰특별유의서, 공사입찰특별유의서,
공사계약일반조건, 공사계약특수조건, 지방자치단체 적격심사세부기준, 지방자치단체공사적격심사
세부기준, 붙임의 공사시방서 등 기타 입찰 및 기타 사항에 필요한 모든 사항을 열람하여 숙지하고
입찰에 응하여야 하며, 숙지하지 못하여 발생되는 책임은 입찰참가자에게 있습니다.
나. 계약상대자는 대가 수령시 15일 이내에 하수급인과 계약상대자와 직접 계약을 체결한 자재·장비업자
(하도급사 자재·장비업자 포함)가 시공·제작·대여 분에 대해 현금으로 지급하고, 5일이내 지급내역(수령자,
수령액, 수령이 등 증빙서류)을 발주기관과 공사감독관에게 통보해야 합니다.
다. 화성시에서는 지역경제 및 지역건설산업 활성화 촉진과 육성을 위해 ‘화성시 지역건설산업 활성화
지원 조례’를 시행하고 있으며, 관련 조례에 따라 인력채용 시 화성시민과 숙련노동자 양성기관(건설기
능학교 등)을 통한 노동자를 우선적으로 고용하여 주시기 바라며, 공사현장에서 사용되는 각종 자재·건
설장비는 불가피한 경우를 제외하고 가급적 화성시 지역 내 생산자재(건설장비)를 사용하시기 바랍니
다. 그리고 하도급 계약 체결시 원도급사가 다른 지역 건설산업체일 경우, 관내 건설산업체와의 하
도급 비율이 50% 이상이 될 수 있도록 노력하여 주시기 바랍니다.
라. 본 공사는 불법체류 외국인 고용을 금지하며 공사감독관의 요구 시 고용허가서(E-9) 또는 특례고용
외국인근로자(H-2) 근로개시 신고서를 제출하여야 합니다.
마. 낙찰자는 본 공사 추진 시 「건설공사 사업관리방식 검토기준 및 업무수행지침」 제10조에 의거 「산업안전
보건법」 및 「건설기술진흥법」 등 관련 법령 및 공사계약문서에 정하는 바에 따라 이행하여야 합니다.
또한 현장안전에 대한 전적인 책임을 가지고 신의와 성실의 원칙에 입각하여 시공하고 안전관리 관련
공사 감독자의 지시에 따라야 하며, 동 내용을 확약하는 문서를 계약체결 시 제출하여야 합니다.
바. 계약대상자는 대금 청구 시에는 공급가액(부가세 제외)의 1.5%에 해당 하는 경기도 지역개발공채 매입
필증을 제출하여야 합니다.
사. 「건설근로자의 고용개선 등에 관한 법률」 제13조 제4항에 따른 일정규모 이상의 사업장에 해당할 경우,
사업주는 근로일수 신고를 위한 전자카드를 피공제자에게 발급하여야 합니다.
아. 낙찰자(계약상대자)는 「공직자의 이해충돌 방지법」 제12조 및 「화성시 공직자의 이해충돌 방지제도
운영지침」 제10조에 따라, “수의계약 체결 제한 대상” 확인을 위한 “확인서” 원본을 계약체결 시 제출
해야하며, 수의계약 체결 제한 대상으로 확인될 경우에는 계약을 해제·해지할 수 있습니다.
▸ 화성시 홈페이지[www.hscity.go.kr, 바로가기 서비스 > 화성시 자치법규 원문열람시스템 > 화성시 공직자의
이해충돌 방지제도 운영지침(별지 제10호 서식)] 참고바랍니다.
17. 기타 보충정보 제공처
가. 입찰에 관한 사항: 화성시 공원녹지사업소 공원조성과 ☎031-5189-6231
나. 공사 및 설계내용: 화성시 공원녹지사업소 동부공원관리과 ☎031-5189-6962
다. 전자입찰이용에 관한 사항: 조달청 조달전자 콜센터 ☎1588-0800
라. 입찰결과 안내: 국가종합전자조달시스템(http://www.g2b.go.kr)으로 확인
위와 같이 안내 공고합니다.
2026.10.15.
화 성 시 공원녹지사업소 (분 임)재 무 관
===== 노작공원(데크공사) 시방서.pdf =====
동부권 공공정원화 기본 및 실시설계
시
방
- 노작공원 -
2026.09 서 제 1장 총 칙 (일 반 시 방 ) 목 차
제1장 총 칙
KCS 10 10 05 공사일반 ········································································································· 02
KCS 10 10 10 공무행정요건 ································································································· 08
KCS 10 10 15 품질관리 ········································································································· 16
KCS 10 10 20 자재관리 ········································································································· 20
KCS 10 10 25 안전 및 보건 관리 ······················································································· 24
KCS 10 10 30 환경관리 ········································································································· 27
KCS 10 10 35 시공 및 준공요건 ························································································· 32
KCS 10 10 05 공사일반
목
차
1. 일반사항 ························································································································································· 2
1.1 적용범위 ················································································································································· 2
1.2 참고기준 ················································································································································· 2
1.2.1 관련법규 ······································································································································ 2
1.2.2 관련기준 ······································································································································ 2
1.3 용어의 정의 ··········································································································································· 2
1.4 해석 ························································································································································· 2
1.5 적용순서 ················································································································································· 3
1.6 법령 및 규칙의 준수 ··························································································································· 3
1.7 수급인의 기본 의무 ····························································································································· 3
1.8 현장 확인 및 설계도서 검토 ············································································································· 3
1.9 책임한계 ··············································································································································· 4
1.10 착수 전 합동조사 ······························································································································· 4
1.11 시공 전 협의 ······································································································································· 4
1.11.1 공사 합동회의 ·························································································································· 4
1.11.2 공사추진 합동회의 ·················································································································· 5
1.12 공사수행 ··············································································································································· 5
1.12.1 공사수행 일반 ·························································································································· 5
1.12.2 공사감독자의 업무 ·················································································································· 5
1.12.3 응급조치 ···································································································································· 5
1.12.4 지중 발굴물 ······························································································································ 5
1.13 야간공사 ··············································································································································· 5
1.14 동절기 공사 ········································································································································· 5
1.15 하도급 관리 ······································································································································· 6
1.16 공사협의 및 조정 ······························································································································· 6
1.16.1 협의 및 조정 ···························································································································· 6
1.16.2 발주자의 조속 완공 또는 연기 요구에 대한 조치 ·························································· 6
1.16.3 협의 및 조정에 따른 설계변경 ···························································································· 7
1.16.4 협의 및 조정에 대한 수급인의 책임 ·················································································· 7
1.16.5 종합 공정관리에 협조 ············································································································ 7
2. 자재 ································································································································································· 7
3. 시공 ································································································································································· 7
공사일반
1. 일반사항
1.1 적용범위
(1) 이 기준은 법령 및 규정의 준수, 수급인의 기본 의무, 현장 확인 및 설계도서 검토,
책임한계, 착수 전 합동조사, 시공 전 협의, 공사수행, 야간공사, 동절기 공사, 하도급
관리, 공사협의 및 조정 등에 대해서 적용한다.
1.2 참고 기준
1.2.1 관련법규
건설기술진흥법령
건설산업기본법령
공사계약일반조건
야간 건설공사 안전보건작업 지침 (한국산업안전보건공단)
1.2.2 관련기준
내용 없음.
1.3 용어의 정의
∙ 발주자: 건설산업기본법 제2조제10호의 발주자를 말한다.
∙ 공사감독자: 공사계약일반조건 제2조제3호의 공사감독관을 말한다.
∙ 수급인: 공사계약 일반조건 제2조제2호의 계약상대자를 말한다.
∙ 하수급인: 건설산업기본법 제2조제14호의 하수급인을 말한다.
∙ 현장대리인: 공사계약일반조건 제14조에 따라 공사현장대리인으로서, 현장에서 전반적인
공사 업무와 관리를 책임 있게 시행할 수 있는 권한을 가진 건설 기술자를 말한다.
∙ 설계서: 공사계약일반조건 제2조제4호의 설계서를 말한다.
∙ 검사: 공사계약문서에 기재된 시공 단계 또는 납품된 공사재료 등의 품질 확보를 위해
기성부분 또는 완성품의 품질, 규격, 수량 등을 확인하는 것을 말한다.
∙ 승인: 수급인이 제출, 신고 등의 방법으로 요청한 사항에 대해 공사감독자가 권한범위
내에서 서면으로 동의하는 것을 말한다.
∙ 지시: 공사감독자가 권한 범위 내에서 필요한 사항을 수급인에게 실시하도록 지시하는
것을 말한다.
∙ 확인: 계약문서대로 공사를 실시하고 있는지, 또는 지시, 조정, 승인, 검사 이후에 원래
의도와 규정대로 시행되었는지를 공사감독자가 확인하는 것을 말한다.
1.4 해석
(1) 표준시방서(또는 공사시방서)에서 사용된 용어의 해석은 아래 순서에 따른다.
(2) 계약문서 (표준시방서(또는 공사시방서) 포함)
(3) 건설기술진흥법과 동 시행령, 동 시행규칙
2 공사일반
(4) 기타 건설관련 법규
(5) 공사 종류별 용어사전
(6) 국어사전
1.5 적용순서
(1) 공사시방서에서 KCS 10 10 05, KCS 10 10 10, KCS 10 10 15, KCS 10 10 20, KCS
10 10 25, KCS 10 10 30, KCS 10 10 35와 이 기준들 외의 시방기준 내용간에 상호
모순이 있을 경우에는 이 기준들 외의 시방기준에 명시된 내용을 우선 적용한다.
1.6 법령 및 규칙의 준수
(1) 수급인은 공사와 관련된 모든 법률, 시행령, 시행규칙, 훈령 및 예규, 조례 및 규칙 등
(이하 건설관련법령)을 준수하여야 한다.
(2) 수급인은 표준시방서(또는 공사시방서)의 내용이 건설관련법령과 상호 모순될 경우(건
설공사 중에 건설관련법령이 변경되고 변경된 규정에 따라야 할 경우를 포함한다.)에
는 건설관련법령을 우선하여 준수하여야 한다.
(3) 수급인은 자신이나 고용인이 건설관련법령과 계약문서에 규정된 내용을 준수하여 시
공하도록 해야 하며 이의 위반으로 민원이 발생하지 않도록 해야 한다.
1.7 수급인의 기본 의무
(1) 수급인은 계약에 따라 공사를 성실하게 이행해야 하며, 하자가 발생할 경우 건설관련
법령 및 계약문서에 따라 성실하게 보수하여야 한다.
(2) 수급인은 특별한 사유가 없는 한 공사감독자의 업무수행에 적극적인 자세로 협조하여
야 한다.
1.8 현장 확인 및 설계도서 검토
(1) 수급인은 공사 착수 전에 건설기술진흥법 제48조제2항에 따라 설계도서를 면밀히 검
토하고, 설계도서의 오류, 누락 등으로 공사가 잘못되거나 공기가 지연되는 일이 없도
록 조치하여야 한다.
(2) 설계도서를 검토하고 아래와 같은 경우가 있으면 수급인의 현장대리인은 검토의견서를 첨
부하여 발주자에 통지하고 발주자의 해석 또는 지시를 받은 후 공사를 시행하여야 한다.
① 설계도서의 내용이 현장 조건과 일치하는지 여부
② 설계도서대로 시공할 수 있는지 여부
③ 그 밖에 시공과 관련된 사항
④ 하자발생이 우려되는 경우
⑤ 설계변경 사유 및 계약기간연장 사유가 있는 경우
⑥ 품질향상이나 공사비 절감을 기할 수 있는 경우
(3) 수급인이 발주자에게 통지하지 않았거나 발주자의 해석 또는 지시를 받기 전에 임의
3 공사일반
로 수행한 공사는 기성량으로 인정하지 않는다. 또한 수급인이 임의로 시행한 공사에
대해 공사감독자의 원상복구나 시정 지시가 있는 경우 수급인은 수급인 부담으로 즉
시 이행하여야 한다.
1.9 책임한계
(1) 수급인은 계약문서를 준수하여 공사를 이행해야 하며, 발주자의 시정요구 또는 이행
촉구지시가 있을 때에는 이에 따라야 한다. 또한, 수급인은 인허가 변경, 민원 및 협
의결과 등으로 인해 설계서를 변경할 필요가 있어 발주자가 설계변경을 요청할 경우
에는 이에 성실히 응하여야 한다.
(2) 수급인은 건설공사와 관련하여 정부, 발주자, 외부기관 등에서 시행하는 각종 평가,
감사, 점검의 수감과 이에 따른 시정 지시를 성실히 이행해야 한다.
(3) 수급인은 현장대리인 등 수급인이 해당 공사를 위하여 임명, 지정, 고용한 자 및 수급
인과 납품계약 또는 하도급 계약 체결한 자의 공사 관련 행위 및 결과에 대한 일체의
책임을 져야 한다.
(4) 수급인은 공사 현장의 이용 및 작업 효율 증대, 품질 향상, 안전사고와 환경공해 예
방, 보건위생 등을 위하여 현장과 주변을 청결하게 유지하여야 한다.
(5) 수급인이 발주자와 공사감독자에게 하는 보고, 통지, 요청, 문제 또는 이의 제기 등은
서면으로 해야 효력이 있다.
(6) 인⋅허가 사항은 발주자가 수행함 을 원칙으로 하며, 수급인은 원활한 업무수행을 위
하여 인⋅허가 업무에 최대한의 협조와 지원을 하여야 한다.
1.10 착수 전 합동조사
(1) 수급인은 구조물, 부대시설 등 해당 공종의 공사착수 전에 관계기관(행정 및 유관 기
관), 지역 주민대표, 공사감독자와 합동으로 설계도서상 내용과 현장의 적합 여부를
조사하여야 한다.
(2) 수급인은 조사결과에 따라 변경될 사항에 대하여 사유, 변경방안, 변경내용 등을 작성
하여 발주자 또는 공사감독자에게 보고하여야 한다. 발주자 또는 공사감독자는 조사
결과에 따라 구조물 및 부대시설의 위치, 규격 등을 종합적으로 검토하여 변경과 추
가 설치의 필요성이 인정될 경우 설계변경에 반영할 수 있도록 조치하여야 한다.
1.11 시공 전 협의
1.11.1 공사 합동회의
공사감독자는 공사 착수일로부터 1개월 이내에 최초 공사관련자 합동회의를 개최해야 하
며, 이 회의에서 각각의 책임한계를 검토하고, 필요한 회의별로 장소, 일시, 참석범위, 월
개최 횟수 등을 정한다.
4 공사일반
1.11.2 공사추진 합동회의
공사감독자는 각 공사의 특수사항 및 사전 협의사항 등 업무를 조정하기 위하여 공사추
진 합동회의를 개최하여야 한다.
1.12 공사수행
1.12.1 공사수행 일반
(1) 수급인은 계약문서에 명시되지 않은 사항이라도 구조상 또는 외관상 당연히 시공을
요하는 부분은 발주자 및 공사감독자와 협의하여 이행하여야 한다.
(2) 발주자는 관련 법령, 계약문서에 의하여 자재 등의 품질 및 시공이 적정하지 못하다
고 인정되는 경우에는 재시공 등의 지시를 할 수 있으며, 수급인은 이에 따라야 한다.
1.12.2 공사감독자의 업무
공사계약일반조건 제16조(공사감독관)에 따른다.
1.12.3 응급조치
공사계약일반조건 제24조(응급조치)에 따른다.
1.12.4 지중 발굴물
공사계약일반조건 제38조(발굴물의 처리)에 따른다.
1.13 야간공사
(1) 야간공사는 안전사고, 품질확보 불리 등의 문제로 시행하지 않음이 원칙이나 민원발
생, 교통대책 등으로 불가피하게 시행할 경우에는 다음 사항에 유의하여 품질확보, 부
실공사 방지, 안전관리에 만전을 기해야 한다. 또한 발주자의 지시가 있는 경우 발주
자와 협의하여 추가비용을 청구할 수 있다.
(2) 건설기술진흥법 시행령 제98조제1항에 규정된 안전관리계획 수립대상인 건설공사에
서 야간공사를 시행하여야 할 경우 야간공사가 고려된 안전관리계획을 수립해야 한
다.
(3) 공사장 조명, 작업자 복장, 안전표시 방법 및 기준, 야간공사 안전시설 기준, 야간공사
작업자 건강관리 및 야간공사 안전조치 등의 세부사항은 안전보건공단 안전보건기술
지침인 야간 건설공사 안전보건작업지침(C-52-2012)에 따른다.
1.14 동절기 공사
(1) 동절기 공사 중단 기간에는 물을 사용하는 공사와 기온저하로 인하여 시공품질 확보
가 어려운 공사는 중단해야 한다. 다만, 다음의 경우에는 그러하지 아니한다.
(2) 수급인이 부득이한 사유가 있어 공사를 계속하여야 할 경우에는 동절기 공사로 인하
여 시공품질의 저하 및 안전사고 등을 충분히 예방할 수 있도록 동절기공사 시행방안
5 공사일반
을 수립하여 발주자의 승인을 받은 후에 공사를 계속하여야 한다. 이 때 수급인은 추
가되는 비용을 발주자에게 청구할 수 없으며, 이 기간 동안의 공사시행이 원인이 되
어 발생하는 공사물의 잘못, 재시공 및 하자보수에 대한 책임을 져야 한다.
(3) 발주자로부터 공사를 계속하라는 지시가 있는 경우에 수급인은 지체 없이 동절기 공
사 시행방안을 수립하여 발주자의 승인을 받은 후에 공사를 계속하여야 한다. 수급인
은 이 기간 동안의 공사 시행이 원인이 되어
공사 결과물에 문제가 발생하거나, 재
시공의 필요 또는 하자 등이 발생할 경우에는 이에 대한 보수의 책임을 져야 한다.
또한 동절기 공사의 추가비용은 발주자와 협의하여 청구할 수 있다.
1.15 하도급 관리
(1) 수급인은 계약된 공사의 일부를 제3자에게 하도급 하고자 할 때에는 발주자의 서면승
인을 받아야 한다. 다만, 전문공사를 해당 전문공사업자에게 하도급하는 경우에는 건
설산업기본법 제29조제4항에 의하여 발주자에게 통지해야 한다.
(2) (1)의 규정에 의하여 하도급한 경우에도 계약상의 수급인 책임과 의무가 면제되지 않
으며, 수급인은 하수급인, 하수급인의 대리인, 하수급인이 채용한 근로자의 행위에 대
하여 모든 책임을 져야 한다.
(3) 수급인이 공사 일부를 하도급 하는 경우에는 공사 시행에 적합한 기술과 능력을 가진
자를 하수급인으로 선정하여야 한다.
(4) 수급인은 하도급을 시행하기 전에 건설산업기본법 제31조의2에 따라 하도급계획서를
발주자에 제출하여야 한다.
1.16 공사협의 및 조정
1.16.1 협의 및 조정
수급인은 해당 공사와 관련된 다른 공사 수급인들과 마찰을 방지하고 전체 공사가 계획
대로 완성될 수 있게 협력하고 최선의 방안을 도출한 후에 공사를 시행해야 한다. 이를
위해 관련 공사와의 접속부위 적합성, 공사 시공한계, 시공순서, 공사 착수시기, 공사 진
행속도, 공사 준비, 공사물 보호, 가시설물 등의 적합성에 대해 모든 공사 관련자들과 면
밀히 협의하고 조정하여 공사전체의 진행에 지장이 없도록 해야 한다.
1.16.2 발주자의 조속 완공 또는 연기 요구에 대한 조치
발주자는 공사의 안전, 일반인 보호, 2인 이상의 수급인이 관련된 공사의 원활한 수행을
위하여 당해 건설공사 일부분의 조속한 완공 또는 연기를 요구할 수 있으며, 수급인은 특
별한 사유가 없는 한 이에 따라야 한다. 발주자는 이에 소요되는 추가비용을 수급인에게
지급할 수 있다.
6 공사일반
1.16.3 협의 및 조정에 따른 설계변경
(1) 수급인은 해당 공사와 연관된 다른 공사와의 상호 마찰방지를 위한 협의⋅조정 결과
가 아래와 같은 경우 발주자에 설계변경을 요청할 수 있다.
① 지하구조물 공사의 우선순위 상 불가피한 선⋅후 시공에 따른 기초저면의 안전성
저하를 방지하기 위해 설계변경이 불가피한 경우
② 광통신관로, 공동구, 전화 및 전선관로, 배수관, 급수관 등 지하매설물의 교차, 존
재 유무 등에 의해 매설심도가 변경되어 설계변경이 불가피한 경우
1.16.4 협의 및 조정에 대한 수급인의 책임
수급인은 공사 상호간의 협의 및 조정을 소홀히 하여 발생한 재시공 또는 수정⋅보완 공
사에 대해 책임을 져야 한다.
1.16.5 종합 공정관리에 협조
수급인은 착공부터 준공까지 토목, 건축, 기계, 전기, 통신, 조경, 급배수, 도시가스, 전기
통신관로 공사 등은 물론 타 행정기관 등과의 협조, 관련 공사 전체의 원활한 추진을 위
해 공사감독자가 요구하는 종합 공정관리 계획 및 운영에 적극 협조해야 한다.
2. 자재
내용 없음.
3. 시공
내용 없음.
7
KCS 10 10 10 공무행정요건
목
차
1. 일반사항 ························································································································································· 9
1.1 적용범위 ··················································································································································· 9
1.2 참고기준 ··················································································································································· 9
1.3 용어의 정의 ············································································································································· 9
1.4 서류의 비치 및 제출 ····························································································································· 9
1.5 제출절차 등 ············································································································································· 9
1.6 착공신고서 제출 ··································································································································· 10
1.7 공사공정예정표 ····································································································································· 10
1.8 시공계획서 ············································································································································· 11
1.9 시공상세도면 ········································································································································· 12
1.10 자재 공급원 승인 요청서 ················································································································· 12
1.11 제품자료 ··············································································································································· 13
1.12 견본 ······················································································································································· 14
1.13 시공사진 ··············································································································································· 14
1.14 기성검사원 ··········································································································································· 15
1.15 설계변경 ··············································································································································· 15
2. 자재 ······························································································································································· 15
3. 시공 ······························································································································································· 15
공무행정요건
1. 일반사항
1.1 적용범위
(1) 이 기준은 자료제출 또는 승인을 얻기 위하여 수급인이 발주자(또는 공사감독자)에게
제출할 제출물의 작성과 발송에 대한 일반요건과 절차 등에 대하여 적용한다.
1.2 참고 기준
1.2.1 관련법규
건설기술 진흥법
공사계약일반조건
건설공사 시공상세도 작성지침(국토해양부)
1.2.2 관련기준
KCS 10 10 35 시공 및 준공요건
1.3 용어의 정의
내용 없음.
1.4 서류의 비치 및 제출
(1) 수급인은 공사 진행을 위하여 공무행정에 관한 서류를 사실과 그 증빙자료에 부합되
게 작성하여야 한다.
(2) 수급인은 공무행정서류 중 상시 비치를 요하는 서류는 건설공사 중에 발주자가 수시
로 열람할 수 있도록 현장사무소 또는 현장시험실에 항상 비치해야 한다.
(3) 수급인은 공무행정서류 중 제출해야 하는 서류는 지정된 시기에 지정된 부수를 발주
자에게 제출해야 한다.
(4) 전자문서시스템이 도입된 경우에는 서류의 비치 또는 제출과 관련한 사항을 전자문서
로 대체할 수 있다.
1.5 제출절차 등
1.5.1 작성 및 확인
(1) 수급인이 제출하는 각 제출물은 설계서의 내용과 현장 조건 검토 결과를 반영하여 작
성하여야 하며, 타수급인, 자재납품업자(지급자재 납품자 포함), 작업자, 관련기관과 협
의하여 조정한 내용을 포함하여 작성하여야 한다.
(2) 수급인은 각 제출물에 대하여 계약문서와의 일치 여부를 확인한 후 제출물에 서명 또
는 날인하여 공사감독자에게 제출하여야 한다.
(3) 수급인은 표준시방서(또는 공사시방서)에 명시된 제출물의 작성 및 제출에 소요되는
비용(작성을 위한 자료의 수집 및 정리, 전문가에 대한 자문 등에 소요되는 비용 포
함)은 발주자에게 추가로 청구할 수 없다.
9 공무행정요건
1.5.2 내용 변경
(1) 수급인은 모든 제출물에 대하여 주요한 내용의 변경을 수반하는 사유가 발생했을 경
우에는 지체 없이 관련 제출물을 재작성하여 제출하여야 한다.
1.5.3 미제출 시의 제한
(1) 표준시방서(또는 공사시방서)에서 정한 제출물을 공사감독자에게 제출하지 않을 경우
공사감독자의 승인 또는 확인을 받을 수 없으며, 해당 공사를 진행할 수 없다.
1.5.4 공사 관련자에 대한 전파교육
(1) 수급인은 공사감독자가 확인한 제출물에 대하여 필요한 사항은 작업자 등 공사 관련
자를 대상으로 하여 전파교육을 실시하여 공사 시행상의 오류를 방지하여야 한다.
1.6 착공신고서 제출
(1) 수급인은 공사에 관한 계약을 체결하였을 때에는 계약문서에서 정하는 바에 따라 공
사를 착공하여야 한다.
(2) 수급인은 공사 착공 시 다음 각 호의 서류가 포함된 착공신고서를 발주자에게 제출하
여야 한다.
① 건설기술진흥법령 등 관련법령에 의한 현장기술자 지정신고서
② 공사공정예정표
③ 안전⋅환경 및 품질관리계획서
④ 공정별 인력 및 장비투입계획서
⑤ 착공 전 현장사진
⑥ 기타 발주자가 지정한 사항
1.7 공사공정예정표
1.7.1 서식
(1) 공사의 안전관리, 품질관리 등 특별히 중요하다고 판단되는 공사활동에 대해서는 막
대도표로 일정을 나타내야 하고, 매주 첫 작업일에 확인하여야 한다.
(2) 수급인은 PERT/CPM(Program Evaluation & Review Technique / Critical Path
Method) 등에 의한 공정계획서를 제출하여야 한다.
(3) 수급인이 공정예정표 작성에 이용하는 공정관리 소프트웨어는 이 기준이 요구하는 사
항들을 충족시킬 수 있는 것이어야 한다.
1.7.2 내용
(1) 수급인은 공사공정예정표에 다음 사항을 명시하거나 첨부하여야 한다.
① 공종별 및 공종 내 주요 공정단계별 착수시점, 완료시점
② 공종별 및 공종 내 주요 공정단계별 선․후․동시 시행 등의 연관관계
③ 주공정선(Critical Path) 또는 주 공정 공사의 목록
10 공무행정요건
④ 주요 제출물의 제출 일정계획 : 공종별 공사 시공계획서, 시공상세도 및 견본
(2) 수급인은 표준시방서(또는 공사시방서)의 각 시방 기준에 따라 각 항목을 확인하여야
한다.
(3) 수급인은 작업의 각 단계에 세부일정이 필요한 경우에는 관련 부분 일정표를 제시하
여야 한다.
(4) 수급인은 전체 일정에서 주공정과 나머지 일정을 구분하여 제시하여야 한다.
(5) 수급인은 공사 공정예정표의 매달 마지막 날에 각 공정의 누적 공정률과 완료된 작업
의 전체 공정률을 나타내어야 한다.
1.7.3 일정수정
(1) 수급인은 제출날짜에 대한 각 활동의 진행과 각 활동의 예정된 완료 일자를 나타내어
야 한다.
(2) 수급인은 공사범위의 주요변화 그리고 다른 변동사항으로 인하여 변경된 활동들을 확
인하여야 한다.
(3) 수급인은 공사시행 중 당초에 수립한 공사예정공정표 혹은 시공계획과 공사추진실적
을 비교하여 지연된 공종이 있을 경우에는 공정만회대책을 수립하여야 하며, 공사감
독자가 요구할 경우, 수립된 공정만회대책을 공사감독자에게 제출하고, 승인을 받은
후 이에 따라 시행하여야 한다.
1.7.4 자료제출
(1) 수급인은 공정계획을 변경하는 때에도 수정공정예정표를 제출하여야 한다.
1.7.5 배부
(1) 수급인은 공정예정표의 복사본을 공사현장 사무소, 하수급인, 납품자 그리고 기타 관
계자에게 배부하여야 하며, 공정계획이 변경되었을 경우에는 수정공정예정표의 복사
본을 동일하게 배부하여야 한다.
1.8 시공계획서
(1) 수급인은 표준시방서(또는 공사시방서) 각 시방 기준의 공사에 대한 시공계획서를 공
사감독자의 확인을 받은 후 공사에 착수하여야 한다.
(2) 시공계획서에 기재할 주요한 항목은 다음과 같다.
① 공사개요
② 공사공정예정표
③ 현장조직표
④ 주요장비 동원계획
⑤ 주요자재 반입계획
⑥ 인력동원계획
11 공무행정요건
⑦ 긴급시의 체제
⑧ 품질관리계획 또는 품질시험계획
⑨ 안전관리계획
⑩ 환경관리계획
⑪ 교통관리계획
⑫ 가설계획(가설구조물, 가설설비, 현장사무소, 재료적치장 등 가설시설물)
⑬ 수목 가이식장 계획
⑭ 공사 관련 관계기관과의 협의계획서 및 민원처리계획서
⑮ 기타 발주자가 지정한 사항
1.9 시공상세도면
1.9.1 제출 및 승인
(1) 수급인(하수급인, 자재나 제품의 제작자 및 공급자를 포함한다.)은 설계서 및 현장조건
과의 적합성 여부를 확인하여 공사 수행상의 잘못 또는 부분공사의 누락을 예방하고,
타 공사 수급인, 지급자재 공급자, 관련기관 및 주변에 거주하는 주민과의 마찰로 인
한 공사의 지연을 예방하기 위하여 시공상세도면을 작성하여야 한다.
(2) 수급인은 작성한 시공상세도면에 대하여 공사감독자의 승인을 받은 후에 당해 공사를
착수하여야 한다.
(3) 수급인은 공사감독자의 확인을 받은 시공상세도면을 공사에 사용하여야 한다.
1.9.2 작성방법
(1) 수급인은 설계서(공사시방서, 설계도면, 현장설명서 및 물량내역서)의 요구사항을 종합
하여 시공상세도면을 작성하여야 하며, 시공상세도면에는 부위별 재료명과 시공 또는
설치 방법 및 마감상태를 명확히 표기하여야 하고, 정확한 치수 및 축척을 명시하여
야 한다.
1.9.3 제출 대상
(1) 수급인이 시공상세도면을 제출하여야 하는 대상 및 그것에 포함되어야 할 내용은 표
준시방서(또는 공사시방서)의 각 시방 기준에 따른다.
1.10 자재 공급원 승인 요청서
1.10.1 승인요청
(1) 수급인은 공사용 자재(재료, 부재, 제품 및 설비 기기를 포함한다.)의 사용 또는 설치
전에 설계서의 요구조건 및 품질기준과의 적합성을 확인하고, 자재 선정을 위한 검토
나 자재의 품질확인를 위하여 자재 공급원 승인요청 서류를 제출하여 공사감독자의
승인을 받은 후 사용 또는 설치하여야 한다.
12 공무행정요건
1.10.2 대상자재
(1) 대상자재의 종류는 해당 공사에 사용할 주요 자재 및 재료로서 표준시방서(또는 공사
시방서) 각 해당 시방 기준에 따른다. 표준시방서(또는 공사시방서)의 해당 시방 기준
에서 자재 공급원 승인 요청서를 제출하도록 명시되어 있지 아니한 자재에 대해서는
공사감독자의 지시에 따른다.
1.10.3 작성방법
(1) 수급인은 자재 공급원 승인요청 서류를 발주자의 품질문서에 따라 준비하여야 한다.
(2) 포함내용
① 자재 공급원 일람표
② 제품자료(1.11(제품자료) 참조)
③ 견본(1.12(견본) 참조)
(3) 수급인은 설계서 및 현장여건이 제품설치 등에 적합하지 않을 경우에는 자재의 설치
등을 위하여 필요한 설계도서 및 현장 여건의 조정 요구사항을 제출하여야 한다.
1.10.4 제출시기 및 부수
(1) 자재의 사용 또는 설치 15일 전까지 2부를 제출한다. 다만, 해당 공사의 착공 전에 품
질시험․검사가 필요하다고 표준시방서(또는 공사시방서)의 해당 시방 기준에 명시되어
있는 경우에는 그 시험․검사에 소요되는 기간을 추가로 감안하여 제출하여야 한다.
1.11 제품자료
1.11.1 개요
(1) 1.10.3(2)에 의한 제품자료에 대한 요구사항은 다음과 같다.
1.11.2 대상자재
(1) 표준시방서(또는 공사시방서)의 각 시방 기준에 따른다.
1.11.3 작성방법
(1) 자재 개요(모델명, 제작자명, 연락처)
(2) 당해 자재가 설계서에 명시한 기준 등에 적합한 품질임을 나타내는 다음과 같은 증빙
서류 중 하나
① 건축, 토목, 기계설비, 조경 공사의 경우에는 건설기술 진흥법 제60조에 의한 국립
ㆍ공립 시험기관 또는 건설기술용역업자가, 그리고 전기설비, 통신설비 공사의 경
우에는 공인시험기관이 발급한 시험성적서. 다만, 발급한 날로부터 3개월이 경과되
지 않았고, 발주자 등 공공기관 사업장에서 공사감독자의 서명ㆍ날인을 받아 시험
의뢰하여 발급 받은 시험성적서에 한한다.
② 한국산업표준 인증제품 또는 이에 준하는 제품임을 나타내는 서류
13 공무행정요건
③ 관계법령에 의하여 품질검사를 받았거나 해당 국제표준에 의한 인증제품임을 나타
내는 서류
④ 상기 ① 내지 ③에 해당되지 않는 자재는 자재ㆍ제품 제작자가 작성한 품질관련
기술자료
(3) 자재 제작자의 시공 또는 설치시방서
(4) 설계서 및 현장여건이 제품설치 등에 적합함을 나타내는 서류. 적합하지 않을 경우는
자재의 설치 등을 위하여 필요한 설계서 및 현장여건의 조정 요구사항
(5) 기타 표준시방서(또는 공사시방서)의 각 시방 기준에 명시되어 있는 사항
(6) 증빙서류가 사본일 경우는 현장대리인의 원본 대조필 서명․날인이 있어야 한다.
1.12 견본
1.12.1 개요
(1) 1.10.3(2)에 의한 견본에 대한 요구사항은 다음과 같다.
1.12.2 대상자재
(1) 표준시방서(또는 공사시방서)의 각 시방 기준에 따른다.
1.12.3 작성방법
(1) 수급인은 공사용 자재에 대하여 설계서에 명시한 기준에 적합한 자재의 견본을 제출
하여야 한다.
(2) 수급인은 선정된 자재의 견본이 반입되는 자재의 검수기준으로 활용할 수 있도록 공
사감독자 사무실 또는 수급인 사무실에 준공 시까지 비치하여야 한다. 다만, 비치가
불필요하다고 인정되는 견본에 대해서는 공사감독자와 협의하여 비치기간을 단축하거
나 비치를 생략할 수 있다.
(3) 제출대상 자재의 종류는 표준시방서(또는 공사시방서)의 각 시방 기준에 따른다.
(4) 포함 사항
① 자재의 견본
② 표준시방서(또는 공사시방서)의 각 시방 기준 코드번호 및 품질기준
③ 납품소요기간
④ 기타 표준시방서(또는 공사시방서)의 각 시방 기준에 명시되어 있는 사항
1.13 시공사진
(1) 수급인은 공사 진행 중 현장과 시공에 대한 사진을 공사감독자가 수락하는 상태로 촬
영하여 제출하여야 한다.
(2) 수급인은 공사 시공 중 되메우기, 마감재 사용 등으로 육안검사가 불가능하게 되는
부분 또는 준공 후 해체되는 가설물 등에 대하여는 수시로 부분 또는 전경이 분명하
게 나타나도록 천연색으로 사진을 촬영하여야 한다.
14 공무행정요건
(3) 수급인은 다음의 공사에 대해서는 공사의 착수 전, 진행 중 및 완성 후에 사진을 촬
영하여야 한다.
① 현장정리
② 땅파기 또는 땅깎기
③ 기초공사
④ 구조물의 구체
⑤ 최종 준공
⑥ 공사계약문서에 명시된 사항으로 시공 후의 검사가 불가능하거나 곤란한 부분
(4) 기존 공사조건에 대한 증거자료로 공사의 내부 및 외부에서 사진촬영을 하여야 한다.
(5) 현상하는 사진의 색채, 현상지, 표면, 농도, 치수 등은 감리자의 승인을 받아야 하며,
현상된 사진은 사진철로 비치하여야 한다.
(6) 각 현상된 사진에는 공사명 및 번호, 촬영위치 및 일자, 촬영자의 성명 등을 명기하여
야 한다.
(7) 촬영된 필름 및 사진파일은 공사기록문서와 함께 발주자와 공사감독자에게 전달하여
야 하며, 시간적인 순서에 따라 목록을 작성해서 첨부하여야 한다.
(8) 준공일까지 지정된 시각에 4방향에서 고공촬영을 하여야 한다.
(9) 촬영방향에 대하여 공사감독자와 협의하여야 한다.
(10) 수급인은 발송서한과 함께 촬영 후 특별하게 정하지 않는 한 3일 이내 또는 기성금
신청 시 현상된 사진을 제출하여야 한다.
(11) 수급인은 준공이 되면 사진철을 KCS 10 10 35에 의거하여 발주자에 제출하여야 한다.
1.14 기성검사원
(1) 공사계약일반조건 제27조(검사)에 따른다.
1.15 설계변경
(1) 공사계약일반조건 제19조(설계변경 등) ~ 제23조(기타 계약내용의 변경으로 인한 계
약금액의 조정)에 따른다.
2. 자재
내용 없음
3. 시공
내용 없음
15
KCS 10 10 15 품질관리
목
차
1. 일반사항 ······················································································································································· 17
1.1 적용범위 ··············································································································································· 17
1.2 참고기준 ··············································································································································· 17
1.2.1 관련법규 ···································································································································· 17
1.2.2 관련기준 ···································································································································· 17
1.3 용어의 정의 ········································································································································· 17
1.4 품질관리계획 및 품질시험계획 ······································································································· 17
1.5 품질시험⋅검사 ··································································································································· 17
1.6 현장시험실 ··········································································································································· 19
1.7 품질시험⋅검사 의뢰 ························································································································· 19
2. 자재 ······························································································································································· 19
3. 시공 ······························································································································································· 19
품질관리
1. 일반사항
1.1 적용범위
(1) 이 기준은 공사의 품질을 확보하기 위한 품질관리에 관한 일반적인 사항에 대하여 적
용한다. 표준시방서(또는 공사시방서)의 다른 시방 기준의 관련 항목에 품질관리에 관
한 규정이 있을 경우에는 그에 따른다.
1.2 참고 기준
1.2.1 관련법규
건설기술 진흥법령
주택법
1.2.2 관련기준
내용 없음.
1.3 용어의 정의
내용 없음.
1.4 품질관리계획 및 품질시험계획
(1) 수급인은 관련 법규에 따라서 품질관리계획 또는 품질시험계획을 수립하고 그에 따라
품질관리를 실시하여야 한다.
(2) 수급인은 품질관리계획 또는 품질시험계획을 수립하여 공사감독자의 확인을 받아 건
설공사를 착공하기 전에 발주자의 승인을 받아야, 계획의 변경 시에도 또한 같다.
(3) 수급인은 관련 법규에 따라 품질관리계획 또는 품질시험계획을 작성 비치하여야 한다.
(4) 수급인은 품질관리계획 또는 품질시험계획에 따라 건설공사의 품질관리를 이행하여야
하며, 발주자 또는 공사감독자는 관련 법규에 따라 시공 및 사용재료에 대한 품질관
리업무의 적정성을 확인할 수 있고, 이 경우 수급인은 품질관리 적정성 확인에 입회
하여야 한다.
(5) 발주자 또는 공사감독자는 품질관리 적정성 확인 결과 시정이 필요하다고 인정하는
경우에는 수급인에게 이의 시정을 요구할 수 있으며, 시정을 요구받은 수급인은 지체
없이 이를 시정한 후 그 결과를 발주자 또는 공사감독자에게 통보하여야 한다.
(6) 수급인은 관련 법규에 따른 품질관리비를 당해 목적에만 사용하여야 하며, 발주자 또
는 공사감독자는 이의 사용에 관하여 지도⋅감독할 수 있다.
(7) 수급인은 공사감독자가 확인한 시험성적서 등의 품질관리활동 실적에 따라 관련 법규
에 따른 품질관리비를 정산해야 한다.
1.5 품질시험⋅검사
(1) 수급인은 공사용 자재 및 재료의 규격 및 품질 등이 설계도서에 명시한 기준에 적합
17 품질관리
한 지를 확인하기 위하여 관련 법규에 따라 품질시험 및 검사를 실시하여야 한다.
(2) 수급인은 구조물의 안전에 중요한 영향을 미치는 시험종목의 품질시험⋅검사를 실시
할 때에는 발주자와 공사감독자에게 입회를 요청하여 발주자 또는 공사감독자 입회하
에 품질시험 검사를 시행하여야 한다.
(3) 수급인이 아래의 각 항 중 하나에 해당하는 자재를 구매하여 공사에 사용할 수 있음
에도 불구하고 그러하지 아니한 자재를 사용하기 위하여 실시하는 품질시험 및 검사
에 소요되는 비용의 지급 또는 공사기한의 연장을 발주자에게 추가로 청구할 수 없다.
① ‘건축, 토목, 기계설비, 조경 공사의 경우에는 건설기술 진흥법
제60조에 의한 국
립·공립 시험기관 또는 건설기술용역업자, 그리고 전기설비, 통신설비 공사의 경우
에는 공인시험기관’(이하 “품질검사 전문기관”이라 한다)이 발급한 시험성적서를
제출하여 품질을 인정받을 수 있는 자재. 다만, 발급한 날로부터 3개월이 경과되
지 않았고, 공공기관의 사업장에서 발주자와 공사감독자의 서명·날인을 받아 시험
의뢰하여 발급받은 시험성적서에 한한다.
② 품질검사 전문기관이 발급한 시험성적서를 제출하여 품질을 인정받을 수 있는 자재.
다만, 발급한 날로부터 3개월이 경과되지 않았고, 공공기관의 사업장에서 발주자와
공사감독자의 서명 날인을 받아 시험의뢰하여 발급받은 시험성적서에 한한다.
③ 한국산업표준 인증제품
④ 주택법 등 관계 법령에 따라 품질검사를 받았거나 품질인증을 받은 자재
(4) 수급인이 설계변경 등에 따라 1.3(3)에 명시되지 않은 자재를 사용할 경우에는 별도의
시험을 추가로 시행하여 당해 공사 설계서에 규정된 품질성능을 확인하여야 한다. 수
급인의 책임있는 사유로 인하여 설계변경하는 경우, 수급인은 이에 따른 품질시험⋅
검사비용을 부담해야 한다.
(5) 품질시험 중 건설공사현장에서 실시함이 적절한 시험은 현장에서 시험을 실시하여야
한다.
(6) 현장시험실에서 시행할 수 없는 자재 품질시험은 품질검사 전문기관에 의뢰하여 시행
해야 한다.
(7) 현장시험실 또는 품질검사 전문기관에 의뢰하여 시험하는 것이 부적합한 자재는 제조
공장에서 품질시험⋅검사를 시행할 수 있다. 이때에는 발주자 또는 공사감독자를 입
회시켜 직접 확인하도록 하여야 한다.
(8) 수급인은 품질시험⋅검사대장 및 품목별시험⋅검사작업일지에 품질시험⋅검사의 결과
를 기재하여 발주자 또는 공사감독자의 확인을 받고 비치하여야 한다.
(9) 수급인은 품질시험 또는 검사를 완료한 때에 품질시험⋅검사성과 총괄표를 작성하고,
당해 공사에 대한 기성 검사원, 준공검사원 제출 시 또는 예비준공검사 신청 시 발주
자 또는 공사감독자에게 이를 제출하여야 한다.
(10) 품질시험⋅검사대장, 품목별 시험작업일지 및 품질시험⋅검사총괄표의 서식, 제출시
기 등은 건설기술진흥법령 등에서 규정한 바에 따른다.
(11) 수급인은 품질시험 및 검사결과가 설계서의 기준에 부적합한 경우(이하 표준시방서(또
18 품질관리
는 공사시방서)에서 불합격이라 한다.)에는 시험작업일지에 그 내용을 기재한 후 즉시
발주자 또는 공사감독자에 보고하고, 불합격된 자재를 지체없이 장외로 반출하여야 한
다.
(12) 수급인은 불합격되어 장외 반출된 자재에 대하여는 불합격자재조치표를 작성하여 비
치하여야 한다.
(13) 수급인은 공사현장에 반입된 검수자재 또는 시험합격재료를 공사감독자의 승인없이
공사현장 밖으로 반출해서는 안 된다.
(14) 수급인이 사용할 자재가 품질시험 및 검사에 불합격된 경우에는 시험결과의 확인 등
을 이유로 동일자재에 대하여 반복하여 시험을 요구할 수 없다.
(15) 품질시험 및 검사에 불합격된 경우 수급인은 동일자재가 아닌 자재를 선정하여 품질
시험을 다시 시행하여야 하며, 이에 따른 추가비용은 수급인이 부담하여야 한다.
1.6 현장시험실
(1) 1.5의 품질 시험⋅검사를 실시하기 위하여 수급인은 관련 법규에 따라 자격요건을 갖
춘 시험⋅검사요원을 현장에 적정 배치하고, 시험실의 규모를 정하여야 하며, 시험⋅
검사 장비를 설치하여야 한다. 다만, 현장여건을 고려하여 품질시험⋅검사를 실시하지
아니하는 경우에는 발주자의 별도지시에 따른다.
(2) 수급인은 현장시험실에 품질시험⋅검사 관련서류를 비치하고 상시 기록⋅유지하여야
한다.
1.7 품질시험⋅검사 의뢰
(1) 수급인은 관련 법규에 규정된 바에 따라 품질시험 및 검사를 실시하고, 관리하여야
한다.
(2) 수급인은 품질검사 전문기관으로 하여금 건설공사의 품질관리를 위한 시험⋅검사(이
하 품질검사라 한다.) 등을 대행하게 할 수 있다.
(3) 수급인은 품질검사 전문기관에 시험⋅검사를 의뢰하고자 할 때에 미리 발주자 또는
공사감독자에게 통보하여 확인을 받아야 하며, 품질시험 및 검사를 의뢰하기 위하여
시료를 채취한 때에는 공사감독자의 봉인을 받아야 한다.
(4) 수급인이 품질검사 전문기관에 시험을 의뢰할 경우에 공사감독자는 입회하여 확인할
수 있다.
2. 자재
내용 없음.
3. 시공
내용 없음.
19
KCS 10 10 20 자재관리
목
차
1. 일반사항 ······················································································································································· 21
1.1 적용범위 ··············································································································································· 21
1.2 참고기준 ··············································································································································· 21
1.2.1 관련법규 ···································································································································· 21
1.2.2 관련기준 ···································································································································· 21
1.3 용어의 정의 ········································································································································· 21
1.4 적용기준 ··············································································································································· 21
1.5 재료의 검사 ········································································································································· 22
1.6 재료의 반입 ········································································································································· 22
1.7 사급자재 ············································································································································· 22
1.8 지급자재관리 ······································································································································· 22
1.9 자재의 운반, 보관, 취급 ··················································································································· 23
2. 자재 ······························································································································································· 23
3. 시공 ······························································································································································· 23
자재관리
1. 일반사항
1.1 적용범위
(1) 이 기준은 공사에 사용되는 자재의 적용기준, 견본품, 재료의 검사, 재료의 반입, 사급
자재, 지급자재관리, 자재의 운반, 보관, 취급에 관한 일반적인 사항에 대하여 적용한
다.
1.2 참고 기준
1.2.1 관련법규
건설기술 진흥법
산업표준화법
전기용품안전기준 (국가기술표준원고시)
1.2.2 관련기준
내용 없음.
1.3 용어의 정의
내용 없음.
1.4 적용기준
(1) 수급인은 공사에 사용하는 자재(재료, 제품 및 설비기기를 포함한다. 이하 이 기준에
서 같다.)중에서 이 기준과 설계서에 품질기준이 명시되어 있는 품목은 그 품질기준
에 적합한 신품(가설시설물용 자재를 제외한다.)을 사용하여야 한다. 다만, 해당 설계
서에 품질기준이 명시되어 있지 않은 품목에 대하여는 다음 각 항의 순서에 따라 적
합한 자재를 우선 사용하여야 한다.
① 산업표준화법에 의한 한국산업표준 인증제품(이하 ‘KS 인증제품’이라 한다.)
② 건축, 토목, 기계설비, 조경 공사의 경우에는 건설기술 진흥법 제60조에 의한 국립
⋅공립 시험기관 또는 건설기술용역업자가, 그리고 전기설비, 통신설비 공사의 경
우에는 공인시험기관이 산업표준화법에 의한 한국산업표준에 따라 품질시험을 실
시하여 KS 인증제품과 동등한 성능이 있다고 확인된 것
③ ① 및 ②에 적합한 자재 중 환경부하가 적은 환경표지(마크), GR마크, 저탄소 인증
자재 등 정부가 정한 기준에 의하여 인증받은 친환경 자재 및 제품을 우선적으로
사용하여야 한다.
(2) 전기설비, 통신설비에 사용하는 자재로서 (1)에 적합한 자재가 없을 경우에는 전기용
품안전기준에 의한 형식 승인 품을 사용하여야 한다.
(3) (1)의 ① 및 ②에 적합한 자재가 없을 경우에는 공사감독자의 승인을 받아 품질 및
성능이 우수한 제품을 사용하여야 한다.
(4) 수급인은 공장생산부재의 경우 공장생산에 앞서 제작도, 제작요령서, 제품검사요령서,
21 자재관리
생산공정표 등을 공장생산자에게 작성하도록 하여 공사감독자에게 제출하고 필요에
따라 승인을 받아야 한다.
(5) 공장생산부재에는 공사명, 생산자명, 제조연월일, 제품부호, 제조번호 등이 표시되어야
한다.
(6) 품질시험을 시행한 결과 불합격률이 높다고 인정되는 생산업체의 자재에 대하여 발주
자 또는 공사감독자는 수급인에 사용제한을 지시할 수 있으며, 수급인은 이에 따라야
한다.
(7) 수급인은 공사에 사용할 예정인 자재(지급자재를 제외한다.)에 대하여 공사감독자에게
품질, 색상, 무늬, 질감 등 계약문서와의 적합성을 확인받은 것 중에서 임의대로 선정,
사용할 수 있다.
(8) 수급인은 계약에서 따로 정하지 않는 한 하자발생 시의 교체 및 유지관리의 용이성을
감안하여 단일 제조업체에서 생산된 단일규격의 자재를 사용하여야 한다.
1.5 재료의 검사
(1) 수급인은 공사감독자의 검사를 거쳐 합격된 재료를 사용해야 한다. 다만, 한국산업표
준에 적합한 제품, 기타 관련 법규에 의하여 품질검사를 받았거나 품질을 인정받은
재료에 대해서는 검사를 생략할 수 있다.
1.6 재료의 반입
(1) 수급인은 재료를 반입할 때마다 그 재료가 설계서상의 조건에 적합함을 확인하고, 증
명자료를 첨부하여 공사감독자에게 문서로 보고해야 한다.
(2) 수급인은 부적격품을 신속히 공사현장 외로 반출해야 한다.
(3) 수급인은 공장생산부재에 대해 생산공장 출하 시 검사필 표시, 제품부호, 제조번호,
수량 및 제품의 파손 유무 등을 확인해야 한다.
1.7 사급자재
(1) 수급인은 공사에 사용할 예정인 자재로서 1.4(1)에 적합한 자재는 당해 공사의 진행에
지장이 없도록 공사공정예정표에 따라 적기에 현장에 반입하여야 한다.
1.8 지급자재관리
(1) 지급자재의 종류, 수량, 인도 장소, 기타 조건은 계약에 따른다.
(2) 수급인은 공사감독자의 입회하에 지급자재를 검수하고, 수급인의 책임하에 적절히 보
관하여야 한다.
(3) 수급인은 정해진 목적 이외에는 지급자재를 사용하지 말아야 한다.
(4) 수급인은 지급자재의 사용개소, 사용수량의 잔량을 공사감독자에게 보고해야 한다.
(5) 수급인은 대여받은 기계기구류의 사용 및 보관에 주의해야 하고 철저히 정비하여야
하며, 대여기계에 대해서는 사용일지와 정비일지를 비치하고, 공사감독자의 요구가 있
으면 제출하여야 한다.
22 자재관리
1.9 자재의 운반, 보관, 취급
(1) 수급인은 반입자재에 대해 그 품질과 공사의 적합성이 보장되도록 보관하여야 한다.
수급인은 자재를 보관하거나 반출할 때는 자재를 손상하지 않도록 하여야 하며, 이물
질이 혼입되거나 자재가 섞이지 않는 방법과 장비를 사용하여야 한다.
(2) 수급인은 보관 전에 자재승인을 받았을지라도 공사 투입 전에 다시 검사할 수 있는
위치에 자재를 보관하여야 한다.
(3) 수급인은 준공과 관계없이 자재의 변질, 손상, 오염, 뒤틀림, 변색 등 품질에 영향을
주는 일체의 변화가 생기지 않도록 보관, 운반, 취급하여야 한다.
(4) 수급인은 화기위험이 있는 자재를 다른 자재와 분리하여 보관하고 화재예방대책을 수
립하여 취급하여야 한다.
(5) 수급인은 관련법규나 계약에서 정한 빈도에 따라 건설공사 도중
행하여야 하는 자재가 있다면, 품질시험 검사가 종료될
품질시험 검사를 시 때까지, 시험에 합격되어 사
용 중인 자재와 섞이지 않도록 분리하여 보관하여야 한다.
(6) 수급인은 지급자재의 인수, 출고 및 재고상태를 지급자재관리부에 기록하고 상시 비
치, 보관, 관리해야 한다.
2. 자재
내용 없음.
3. 시공
내용 없음.
23
KCS 10 10 25 안전 및 보건 관리
목
차
1. 일반사항 ······················································································································································· 25
1.1 적용범위 ··············································································································································· 25
1.2 참고기준 ··············································································································································· 25
1.2.1 관련법규 ···································································································································· 25
1.2.2 관련기준 ···································································································································· 25
1.3 용어의 정의 ········································································································································· 25
1.4 건설안전보건관련법령 숙지 ············································································································· 25
1.5 안전관리계획 ······································································································································· 25
1.6 안전관리체계 ······································································································································· 26
1.7 안전점검 ··············································································································································· 26
1.8 안전교육 ··············································································································································· 26
1.9 사고처리 ··············································································································································· 26
2. 자재 ······························································································································································· 26
3. 시공 ······························································································································································· 26
안전 및 보건 관리
1. 일반사항
1.1 적용범위
(1) 본 기준은 공사의 현장안전관리가 효과적으로 실시되도록 하는 데 필요한 안전 및 보
건관리의 일반적인 사항에 대해서 적용한다.
1.2 참고 기준
1.2.1 관련법규
건설기술진흥법
산업안전보건 관련법
소방기본법
시설물의 안전관리에 관한 특별법
1.2.2 관련기준
내용 없음.
1.3 용어의 정의
내용 없음.
1.4 건설안전보건관련법령 숙지
(1) 수급인은 공사를 시행하기 전에 부처별 산업안전보건 관련법령, 건설기술진흥법, 시설
물의 안전관리에 관한 특별법, 소방기본법, 규정, 지침 등(이하 건설안전보건 관련법령
이라 한다.)을 숙지하여야 한다.
1.5 안전관리계획
(1) 수급인은 건설기술진흥법 제62조에 따라 안전관리계획을 수립하여 공사감독자의 확
인을 받아야 하며, 건설공사를 착공하기 전에 발주자에게 제출하여 승인을 받아야 한
다. 안전관리계획의 내용을 변경하는 경우에도 또한 같다.
(2) 발주청 또는 공사감독자는 수급인이 작성한 안전관리계획을 보완하도록 지시할 수 있
으며 특별한 이유가 없는 한 수급인은 이에 따라야 한다. 비록 발주청 또는 공사감독
자가 보완 지시를 하였을 경우에라도 안전관리에 대한 최종 책임은 수급인에게 있다.
(3) 발주자 또는 공사감독자는 대상공사가 아닐 경우라도 공사 시행 상 필요하다고 인정
되는 공사에 대해서는 계획의 수립을 지시할 수 있다.
(4) 수급인은 산업안전보건법 제48조에 따라 유해․위험 방지 계획서를 작성하여 고용노동
부장관에게 제출하여야 한다.
(5) 안전관리계획서와 유해‧위험방지계획서를 통합하여 작성할 수 있다.
25 안전 및 보건 관리
1.6 안전관리체계
(1) 수급인은 산업안전보건법 제13조 ~ 제19조에 따라 사업장에 안전보건관리책임자, 관
리감독자, 안전관리자, 보건관리자, 안전보건관리담당자, 안전보건총괄책임자, 산업안
전보건위원회 등을 두고 규정된 업무를 수행하게 하여야 한다.
1.7 안전점검
(1) 수급인은 1.3의 안전관리계획과 건설기술 진흥법 시행령 제100조에 따라 건설공사의
안전점검을 실시하여야 한다.
(2) 급인은 건설기술진흥법 제62조에 따라 안전관리계획을 수립해야 하는 공사를 준공한
경우에는 안전점검의 결과와 조치내용을 기록․유지한 후,
건설기술 진흥법 제62조제
4항에 따라 안전점검에 관한 종합보고서를 작성하여 발주자(발주자가 발주청이 아닌
경우에는 인․허가기관의 장을 말한다.)에게 제출하여야 한다.
(3) 수급인은 산업안전보건법 제29조에 따라 안전·보건점검 등 안전․보건조치를 하여야 한다.
1.8 안전교육
(1) 수급인은 해당 사업장의 근로자에 대하여 산업안전보건법 제31조에 따라 안전・보건
교육계획을 수립하여 실시하고, 그 결과를 교육일지에 작성, 보존하여야 한다.
(2) 수급인은 건설 일용근로자를 채용할 때에는 그 근로자에 대하여 산업안전보건법 제
31조의2에 따라 기초안전·보건교육을 이수하도록 하여야 한다.
1.9 사고처리
(1) 수급인은 산업재해가 발생하였을 때에는 산업안전보건법 제10조에 따라 재해발생원
인 등을 기록·보존하고, 그 발생 개요·원인 및 보고 시기, 재발방지 계획 등을 고용노
동부장관에게 보고하여야 한다.
2. 자재
내용 없음.
3. 시공
내용 없음.
26
KCS 10 10 30 환경관리
목
차
1. 일반사항 ······················································································································································· 28
1.1 적용범위 ··············································································································································· 28
1.2 참고 기준 ············································································································································· 28
1.2.1 관련 법규 ·································································································································· 28
1.2.2 관련기준 ···································································································································· 28
1.3 용어의 정의 ········································································································································· 28
1.4 대기질 ··················································································································································· 28
1.5 수질 ······················································································································································· 28
1.6 소음⋅진동 ··········································································································································· 29
1.7 폐기물 ··················································································································································· 29
1.8 토양보전 ··············································································································································· 30
1.9 생태계 보전 ········································································································································· 30
1.10 기타 환경관리 ··································································································································· 30
1.11 환경영향평가 협의내용 이행 ········································································································· 31
1.11.1 환경영향평가 협의내용의 이행 ························································································ 31
1.11.2 환경관리행정 ························································································································ 31
2. 자재 ······························································································································································· 31
3. 시공 ······························································································································································· 31
환경관리
1. 일반사항
1.1 적용범위
(1) 이 기준은 건설공사 과정에서 발생되는 자연환경 및 생활환경 보전과 환경오염방지
등에 관한 일반사항에 대해서 적용한다.
1.2 참고 기준
1.2.1 관련 법규
대기환경보전법
해양환경관리법
환경정책기본법
폐기물관리법
소음⋅진동관리법
수질 및 수생태계 보전에 관한 법률
토양환경보전법
화학물질관리법
환경분쟁 조정법
환경영향평가법
지하수법
건설폐기물의 재활용촉진에 관한 법률
1.2.2 관련기준
KCS 10 10 05 공사일반
1.3 용어의 정의
내용 없음.
1.4 대기질
(1) 수급인은 국민의 건강을 보호하고 공사장 주변의 쾌적한 대기환경을 조성하기 위해
환경정책기본법의 관련규정에 의한 환경기준을 유지하도록 하여야 한다.
(2) 수급인은 건설공사 수행 시 일정한 배출구 없이 대기 중에 비산먼지를 발생시키는 공
사를 수행하는 경우에는 그 발생을 억제하기 위한 시설을 설치하거나 필요한 조치를
하여야 한다.
(3) 수급인은 건설공사 수행 시 발생되는 폐기물을 소각하고자 할 때에는 폐기물관리법에
서 정하는 적합한 소각시설에서 소각하여야 하며, 노천소각을 하여서는 안 된다.
1.5 수질
(1) 수급인은 공사장 주변의 하천, 호소, 해역 등 공공수역 및 공공하수도에 수질오염물질
28 환경관리
배출로 인한 오염을 방지하기 위하여 수질 및 수생태계보전에 관한 법률에서 정하는
배출허용기준을 준수하여 환경정책기본법에 의한 수질환경기준을 유지하도록 하여야
한다. 또한 환경영향평가 대상사업으로 환경부와 별도로 협의된 배출허용기준이 있는
경우 이를 준수하여야 한다.
(2) 수급인은 공사현장에서 수질오염물질이 발생하지 않도록 필요한 조치를 하여야 하며,
불가피하게 수질오염물질이 발생하는 경우 공사현장의 지역적 특성과 공종별 특성에
맞는 적절한 수질오염방지시설을 설치⋅운영하여야 한다.
(3) 수급인은 공사현장에 폐수배출시설을 설치하고자 할 때에는 수질 및 수생태계 보전에
관한 법률에 따라 설치하고 운영하여야 한다.
(4) 수급인은 건설공사 수행 시 토사 등 환경오염을 유발하는 물질이 유출되어 상수원 또
는 하천⋅호소⋅해역 등을 오염시키지 않고, 하수도 운영에 지장이 없도록 토사유출
저감시설 등 수질오염 방지시설을 설치⋅운영하여야 한다.
(5) 수급인은 건설공사 수행 시 공사장 주변 하수도 시설의 균열⋅이탈⋅매몰 또는 파손
등으로 인한 하수의 유출로 토양, 지하수 또는 하천, 호소, 해역 등 공공수역의 오염
을 방지하기 위하여 하수도 보호시설을 설치⋅운영하여야 한다.
1.6 소음⋅진동
(1) 수급인은 건설공사를 시행함에 있어 소음⋅진동관리법에서 정하는 생활소음⋅진동관
리기준을 준수하여 현장에 투입되는 공사장비에 의한 소음⋅진동의 영향을 최소화하
여야 한다.
(2) 수급인이 건설현장 내에 소음⋅진동 배출시설을 설치하고자 할 때에는 소음⋅진동관
리법에 따라 설치하고 운영하여야 한다.
(3) 수급인은 공사구간이 건설소음⋅진동규제지역으로 지정된 지역 안에서 공사를 시행하
고자 할 때에는 소음⋅진동관리법에 따라 공사를 시행하여야 한다.
(4) 수급인은 공사차량운행으로 인한 소음의 영향을 저감하기 위해서 차량의 운행속도를
제한하거나 소음방지시설을 설치하여 주변 생활환경지역의 영향을 최소화하여야 한다.
(5) 수급인은 건설활동을 위하여 발파작업이 필요할 경우에는 굴착에 앞서 시험발파를 실
시하여 인근에 피해를 방지하기 위한 발파공법, 천공장, 천공배치, 화약의 종류, 지발당
허용장약량 등의 발파작업계획과 적정한 소음⋅진동저감대책을 수립⋅시행하여야 한다.
1.7 폐기물
(1) 수급인은 공사현장에서 배출되는 폐기물을 폐기물관리법의 관계규정에 적합하게 분리
수거, 수집⋅운반⋅보관 및 처리하여야 한다.
(2) 수급인은 공사현장에서 배출되는 폐기물을 처리하기 위하여 소각시설, 파쇄시설 등을
설치할 경우 폐기물관리법에 의해 적정한 시설을 설치⋅운영하여야 한다.
(3) 수급인은 공사현장에서 배출되는 폐기물 중 재활용이 가능한 폐기물이 폐기물관리법,
건설폐기물의 재활용 촉진에 관한 법률 등에 의해 처리되도록 발주자 및 공사감독자
29 환경관리
와 협의하고 처리하여야 한다.
(4) 수급인은 공사현장에서 발생하는 건설폐재를 폐기물관리법, 건설폐기물의 재활용 촉
진에 관한 법률 및 건설폐재 배출사업자의 재활용지침 등 관계규정에 따라 적정하게
처리하여야 한다.
1.8 토양보전
(1) 수급인은 건설공사 수행 시 공사장에서 발생하는 토양오염 유발시설에 대해 토양환경
보전법에 따라 조치를 하여야 한다.
(2) 수급인은 토공작업 시 필요시 표토 등 비옥도가 높은 토양을 일정장소에 수집, 보관,
관리하여 조경공사 시 식재토양으로 재활용하여야 한다.
(3) 수급인은 비탈면에 대한 녹화 및 피복처리는 가능한 한 조속히 실시하고, 녹화 시에
는 가급적 해당지역에 서식하는 토착종을 우선적으로 사용하여야 한다.
(4) 수급인은 우기에 비탈면 토사가 유출되지 않도록 보호조치를 취하여야 하며, 토사의
채취, 운반은 가능한 우기를 피하여야 한다.
1.9 생태계 보전
(1) 수급인은 건설공사를 수행함에 있어서 자연생태계를 고려한 환경친화적 건설공사가
될 수 있도록 노력하여야 한다.
(2) 수급인은 건설공사 시행에 따른 식생의 훼손을 최소화하기 위하여 공사용 가도로, 가
시설물 설치 시에 주변환경 여건을 고려하여 시공하여야 하며 이식이 가능한 수목은
이식지역을 선정하여 최대한 활용하도록 한다.
(3) 건설지역에 따라 동⋅식물의 서식지, 이동로의 단절 등이 최소화되도록 공사를 시행
하여야 한다.
(4) 설계에 보전하도록 지정된 교목, 관목, 덩굴식물, 잔디나 다른 경관 구조물은 발주자
또는 공사감독자의 승인을 받은 임시 울타리 등으로 둘러 구분하여야 한다. 수급인은
승인받은 작업 지역 경계 바깥의 시공 중에 손상되거나 파괴된 경관구조물을 복구해
야 한다.
(5) 건설활동은 지표수 및 지하수의 오염을 피하기 위해 감독, 관리, 통제 하에 이루어져야
한다. 독성 또는 유해 화학물질은 토양 또는 식물에 살포해서는 안 된다.
1.10 기타 환경관리
(1) 수급인은 비탈면 발생지역의 안전을 도모하고 산사태를 방지하여야 하며 연약지반 등
에서 발생하는 지반침하 및 배출수에 의한 피해가 발생하지 않도록 하여야 한다.
(2) 수급인은 공사 시 자연경관의 훼손을 저감하기 위하여 과도한 지형의 변형, 수목벌채를
금하여 시공하여야 한다.
(3) 수급인은 공사장 주변의 주거지역 등 공사 중 각종 환경오염의 피해대상지역 상태를
사전에 파악하고, 생활환경보전에 만전을 기하여야 한다.
30 환경관리
(4) 수급인은 공사장 주변에 공사 시 발생할 수 있는 문화재의 훼손을 사전에 방지하기
위해 관련법령에 의해 조치를 취하여야 한다.
(5) 수급인은 환경정책기본법에 의한 사전환경성 검토, 환경영향평가법에 의한 협의 결과
를 이행하여야 한다.
1.11 환경영향평가 협의내용 이행
1.11.1 환경영향평가 협의내용의 이행
(1) 수급인은 건설공사 시 협의내용 관리책임자를 지정하여 환경영향평가의 협의내용 이
행계획을 수립하여 이를 성실히 수행하여야 한다.
(2) 협의내용관리 책임자는 협의내용을 성실히 이행하기 위하여 협의내용을 기재한 관리
대장을 비치하고 협의내용의 이행 여부 및 환경영향조사 결과를 통하여 현장을 수시
로 점검하고 이행되지 아니한 사항이 있을 경우에는 이를 공사감독자와 협의하여 이
행토록 조치하여야 한다.
(3) (2)의 협의내용 이행으로 인해 추가비용이나 추가기간이 소요될 경우 계약문서에 따라
처리되어야 하며, 합의가 되지 않을 경우 KCS 10 10 05(1.15)에 따라 처리한다.
(4) 수급인은 환경피해 발생 시 환경피해보고서를 작성하여 발주자 또는 공사감독자에게
제출하여야 한다.
(5) 수급인은 발주자 또는 환경관련기관의 환경관련 점검 시 지적사항에 대하여는 조속히
시정조치하고, 시정 전⋅시정 후 상태확인이 가능한 자료사진을 발주자 또는 공사감
독자에게 제출하여야 한다.
1.11.2 환경관리행정
(1) 수급인은 협의내용 관리책임자를 두고 다음의 업무를 수행하여야 한다.
(2) 공사장 내의 환경관리에 관한 업무계획 수립
(3) 환경영향 저감시설의 설치 및 운영 여부 감독
(4) 환경관련 점검, 교육, 행사계획의 수립 및 실시
(5) 환경관련법에 명시된 제반 신고사항 및 변경신고의 준수
(6) 건설폐재 재활용 계획 수립 및 실적관리
(7) 환경관련법에 의거 비치해야 하는 문서의 작성 및 관리
2. 자재
내용 없음.
3. 시공
내용 없음.
31
KCS 10 10 35 시공 및 준공요건
목
차
1. 일반사항 ······················································································································································· 33
1.1 적용범위 ··············································································································································· 33
1.2 참고기준 ··············································································································································· 33
1.2.1 관련법규 ···································································································································· 33
1.2.2 관련기준 ···································································································································· 33
1.3 용어의 정의 ········································································································································· 33
1.4 공사현장관리 ······································································································································· 33
1.5 주변 구조물 보호 ······························································································································· 33
1.6 공사용 도로 및 임시 배수로 ··········································································································· 34
1.7 공사현장의 출입관리 등 ··················································································································· 34
1.8 시공관리조직 ······································································································································· 34
1.9 공사기록 ··············································································································································· 34
1.10 최종 현장청소 및 출입통제 ··········································································································· 34
1.11 준공서류 ············································································································································· 35
1.12 예비준공검사 ····································································································································· 35
1.13 준공검사 내용 ··································································································································· 36
1.14 시운전 ················································································································································· 36
1.15 시설물 인계⋅인수 ··························································································································· 36
1.16 보수예비품 ········································································································································· 36
1.17 운전 및 유지관리 시범교육 ··········································································································· 37
2. 재료 ······························································································································································· 37
3. 시공 ······························································································································································· 37
시공 및 준공요건
1. 일반사항
1.1 적용범위
(1) 이 기준은 공사현장관리, 주변구조물 보호, 공사용 도로 및 임시 배수로, 공사현장의
출입관리, 시공관리조직, 공사기록, 최종현장청소 및 출입통제, 준공서류, 예비준공검
사, 준공검사 내용, 시운전, 시설물 인계⋅인수, 보수예비품, 운전 및 유지관리 시범교
육 등에 대하여 적용한다.
1.2 참고 기준
1.2.1 관련법규
시설물의 안전관리에 관한 특별법
1.2.2 관련기준
내용 없음.
1.3 용어의 정의
내용 없음.
1.4 공사현장관리
(1) 수급인은 공사현장의 재료 거치장, 작업장 및 공사용 사무소 등에는 공사관계자 이외
의 인원(특히 유아, 어린이 등) 및 차량 등이 출입하지 못하도록 방지책 등으로 폐쇄
하고 필요한 장소에는 조명시설을 설치해야 한다.
(2) 수급인은 공사용 차량의 출입구가 타인에게 방해되지 않도록 공사통로에 설치하고 표
지판으로 표시하며 필요에 따라 교통 유도원을 배치해야 한다.
(3) 수급인은 휴일 및 작업이 행하여지지 않을 때에는 작업장의 출입구 등을 폐쇄해야 한다.
1.5 주변 구조물 보호
(1) 수급인은 공사장이나 그 주변에 있는 지상 및 지하의 기존시설 또는 가시설물에 위해
를 주지 않도록 발주자 또는 공사감독자와 협의하여 필요한 조치를 취해야 한다.
(2) 수급인은 발파, 굴착 등의 건설공사로 인한 공사장이나 그 주변에 있는 지상 및 지하
의 기존시설 또는 가설구조물의 피해를 최소화하거나 예방하기 위하여 정밀한 사전조
사를 실시하고 필요한 사전보강, 보수, 임시이전 등을 실시하여야 한다.
(3) 수급인은 공사시공에 의한 손상이 예상되는 상하수도, 가스, 전기, 전화 등 지하매설
물에 대해서는 관계규정에 따라 공사착공 전에 안전영향평가를 실시하여야 하며, 필
요에 따라 공사감독자(필요시 해당시설물 관리자 포함)의 입회하에 시험굴착 등으로
확인하고 해당 물건의 보안대책에 대해 조정함과 동시에 그 결과를 발주자 또는 공사
감독자에게 보고해야 한다.
(4) 보고에도 불구하고 사고발생 및 사후처리에 대한 책임은 수급인이 진다.
33 시공 및 준공요건
1.6 공사용 도로 및 임시 배수로
(1) 수급인이 사용하는 공사용 도로는 사용하는 동안 유지관리를 철저히 해야 한다.
(2) 수급인은 공사용 도로 및 임시 배수로의 신설, 개량 및 보수가 필요한 때에는 그 계
획을 사전에 공사감독자에게 제출하여 승인을 받아 해당 기관에 소정의 수속절차를
거치고 표지의 설치, 기타 필요한 조치를 수급인 부담으로 하여야 한다.
(3) 수급인은 공사용 도로 및 임시 배수로의 신설, 개량, 보수 및 유지 시에 가능한 한 일
반인들에게 불편이 없도록 하고, 공공의 안전을 해치지 않도록 하여야 한다. 공사용
도로의 공사 및 사용으로 인하여 제3자에게 끼친 손해는 수급인이 해결하여야 한다.
(4) 수급인이 공사를 위해 가설한 공사용 도로 및 임시 배수로는 사용 완료 후 즉시 수급
인 부담으로 원상복구 후, 공사감독자에게 그 결과를 보고토록 한다.
1.7 공사현장의 출입관리 등
(1) 수급인은 공사현장에서 일반인 및 근로자의 출입시간, 보건위생과 풍기 단속, 화재,
도난, 기타의 사고방지에 대하여 특히 유의하여야 한다.
1.8 시공관리조직
(1) 수급인은 공사의 규모, 공사의 특징을 충분히 고려하여 적절한 시공관리 조직을 만들
어야 한다.
(2) 수급인은 시공관리에 필요한 능력, 자격을 갖춘 관리자(현장대리인)를 선정하여 공사
감독자에게 보고해야 한다.
1.9 공사기록
(1) 수급인은 공사의 착수로부터 사용승인 시까지의 승인과 협의가 필요한 사항 및 시험
과 검사 등 설계도서의 적합성을 증명하는 데 필요한 서류 등 공사 전반에 관하여 필
요한 사항을 기록⋅비치하고 사용승인 신청 시 공사감독자에게 제출한다.
1.10 최종 현장청소 및 출입통제
(1) 수급인은 준공검사 전에 최종 현장청소를 하여야 한다.
(2) 수급인은 내외부의 유리, 명판 및 시선에 노출된 표면을 청소하고, 얼룩 및 이물질을
제거하며, 투명하고 미끄러운 표면은 닦고, 부드러운 표면은 진공청소하여야 한다.
(3) 수급인은 기기와 정착물의 청소할 표면과 재료에 대해 적합한 청소재료로 청결하게
청소하여야 한다.
(4) 수급인은 운전 기기의 여과지를 청소 또는 대체하여야 한다.
(5) 수급인은 지붕, 고랑, 홈통 및 배수계통에서 부스러기를 제거하여야 한다.
(6) 수급인은 현장을 청소하고,
포장구역을 비질하고, 조경구역의 표면을 반듯하게 긁어
주어야 한다. 34 시공 및 준공요건
(7) 수급인은 폐자재와 잉여자재, 쓰레기 및 임시시설물을 현장에서 제거하여야 한다.
(8) 수급인은 기타 발주자 또는 공사감독자가 제거하여야 한다고 지시하는 잡초 및 오물
등 기타 부분에 대하여도 청소하여야 한다.
(9) 수급인은 준공 전 청소 완료 후에는 각 시설물 내부에의 출입을 통제하여야 한다.
(10) 수급인은 전기설비 또는 난방설비 등의 기능검사에 필요한 최소한의 인원만을 출입
토록 하며, 출입 시는 슬리퍼 또는 실내화를 착용하게 한다.
(11) 수급인은 각 시설물 입구에 신발털이 매트를 설치하고 계단⋅복도바닥에는 보양천
또는 비닐을 덮어 보양한다.
1.11 준공서류
(1) 수급인은 공사가 완성된 때는 관련 법규 및 계약문서에 따라 준공서류를 작성⋅정리
하여 발주자 또는 공사감독자에게 제출한다.
(2) 준공서류의 종류 및 내용은 다음과 같다.
① 당해 공사의 준공부분에 대한 설계도면(준공도면)과 공사현장에서 설계변경한 부
분의 설계도면 원도
② 시공상세도면
③ 공사사진첩
④ 발급받은 신고 및 인⋅허가 필증 원본
⑤ 구조계산서(설계변경된 부분에 한한다)
⑥ 신공법의 시공 또는 실패사례 보고서(필요시)
⑦ 공사시방서 각 절에 명시된 측정 시험 및 검사보고서(파일항타기록부 등)
⑧ 하수급인 목록(상호, 소재지, 대표자, 전화번호, 공사범위, 공사기간 등)
⑨ 시설물 유지관리 지침서(필요시)
(3) 시설물의 안전관리에 관한 특별법 제2조 제2호의 1종 및 제3호의 2종 시설물에 해당
되는 시설물을 시공하는 수급인은 시설물의 안전관리에 관한 특별법 제17조제1항에
따라 아래의 설계도서 등 관련서류를 작성하여 시설물의 준공 또는 사용승인 전에 발
주자, 관리주체 및 한국시설안전공단에 각각 1세트씩을 제출하여야 한다.
① 준공도면
② 준공내역서 및 시방서
③ 구조계산서
④ 그 밖에 시공상 특기한 사항에 대한 보고서 등
1.12 예비준공검사
(1) 발주자 또는 공사감독자는 준공예정일전에 자재, 시공 및 설비기기의 작동상태가 계
약문서에 명시된 기준에 적합한지를 확인하는 예비점검을 실시할 수 있다.
(2) 수급인은 공사의 예비준공검사자에게 품질시험⋅검사성과총괄표를 제시하여야 한다.
(3) 발주자 또는 공사감독자는 예비준공검사 결과 기준에 적합하지 않은 미비사항이 있을
35 시공 및 준공요건
경우 이에 대한 시정조치를 수급인에게 요구할 수 있으며, 수급인은 이의 시정조치를
완료한 후에 준공검사원을 제출하여야 하며, 예비준공검사 지적사항 및 조치내용을
기록하여 준공검사 시 준공검사자에게 제시하여야 한다.
1.13 준공검사 내용
(1) 발주자 또는 공사감독자가 시행하는 준공검사 시에 아래 사항에 대하여 검사하고 적
정성을 평가한다.
(2) 시공의 정확도, 마감상태, 적정자재 사용 여부
(3) 제반설비기기의 작동상태 등 기능점검
(4) 지급자재 정산, 잔재 및 발생물 처리
(5) 사업승인 조건사항 이행상태
(6) 주변정리 및 원상복구사항 처리내용
(7) 제출물 및 공무행정서류 처리상태
(8) 인⋅허가 완료상태
(9) 입주에 따른 부대시설 공사 진행상태
(10) 준공 전 청소 이행상태
(11) 기타 계약문서에 명시된 사항
1.14 시운전
(1) 수급인은 시운전이 필요한 경우 시운전을 위한 일정, 시운전 대상 등을 미리 발주자
또는 공사감독자와 협의하여야 한다.
(2) 시운전이 필요한 경우 제작자의 지침서에 따라 해당 제작자와 공사감독자의 입회하에
수급인의 감독하에서 실시하여야 한다.
1.15 시설물 인계⋅인수
(1) 수급인은 당해 공사의 예비 준공검사(부분준공, 발주자의 필요에 의한 기성부분 포함)
를 실시한 후 시설물의 인계⋅인수를 위한 계획을 수립하여 발주자 또는 공사감독자
에게 제출하여야 한다.
(2) 수급인이 준공시설물을 인계하기 위하여 제출한 인계⋅인수서는 발주자 또는 공사감
독자가 이를 검토하고, 확인하여야 한다.
(3) 발주자와 수급인과의 시설물 인계⋅인수를 위하여 공사감독자는 입회인이 된다.
(4) 공사감독자는 시설물 인계⋅인수에 대한 발주자의 지시사항이 있을 경우 이에 대한 현
황파악 및 필요대책 등 의견을 제시하여 수급인이 이를 수행하도록 조치하여야 한다.
(5) 수급인은 인계⋅인수서에 준공검사 결과를 포함하여야 한다.
1.16 보수예비품
(1) 수급인은 하자발생 시 사용할 보수예비품을 발주자에게 제공하여야 한다.
36 시공 및 준공요건
(2) 제공하여야 할 보수예비품은 표준시방서(또는 공사시방서)의 각 시방 기준에 명시된
품목 및 수량이어야 하며, 본 공사의 시공제품과 품명, 모델번호, 제조자가 동일한 것
이어야 한다.
(3) 수급인은 하자보수책임기간이 만료되면 발주자에게 보수예비품 잔여량의 반환요청을
할 수 있다.
(4) 수급인은 보수예비품에 대한 비용을 추가로 청구할 수 없다.
1.17 운전 및 유지관리 시범교육
(1) 수급인은 발주자에게 공사목적물인 장비 또는 설비시스템의 시동, 가동중지, 제어, 조
정, 문제점의 발견, 비상시 운전 및 안전유지, 윤활유 및 연료의 주입, 소음⋅진동의
조절, 청소, 손질, 보수, 서비스를 요청하는 방법 및 유지관리지침을 보는 방법 등 운
전 및 유지관리에 필요한 전반적인 사항에 대하여 시범 및 교육을 시행하여야 한다.
(2) 교육 대상 장비, 시스템의 종류, 기타 상세한 사항은 계약에 따른다.
(3) 교육장소 및 일시는 발주자와 협의하여 정한다.
2. 자재
내용 없음.
3. 시공
내용 없음.
37 제 2장 조 경 (일 반 시 방 ) 목 차
제1장 일 반 사 항
KCS 34 10 00 조경공사 일반사항 ··························································································· 02
KCS 34 20 00 부지조성 및 대지조형
KCS 34 20 10 조경 토공사 ··································································································· 12
제3장 시 설 물 공 사
KCS 34 50 00 조경시설물공사
KCS 34 50 05 조경시설물공통 ····························································································· 18
KCS 34 50 10 조경구조물 ····································································································· 33
KCS 34 50 15 현장제작설치 시설 ······················································································· 39
KCS 34 50 20 옥외시설물 ····································································································· 53
제6장 유 지 관 리 공 사
KCS 34 99 00 조경 유지관리공사
KCS 34 99 05 조경유지관리공통 ························································································· 62
KCS 34 99 15 시설물 유지관리 ··························································································· 64
KCS 34 10 00 조경공사 일반사항
목
차
1. 일반사항 ······················································································································································· 2
1.1 적용범위 ··············································································································································· 2
1.2 참고 기준 ············································································································································· 2
1.2.1 관련 법규 ···································································································································· 2
1.2.2 관련 기준 ···································································································································· 2
1.3 용어의 정의 ········································································································································· 2
1.4 제출물 ··················································································································································· 3
1.5 공사기록서류 ······································································································································· 3
1.6 품질보증 ··············································································································································· 4
1.6.1 품질관리계획 ······························································································································ 4
1.6.2 품질시험⋅검사 ·························································································································· 5
1.7 환경요구사항 ······································································································································· 5
1.7.1 수질오탁방지 ······························································································································ 5
1.7.2 악취 및 먼지날림방지 ·············································································································· 5
1.7.3 진동 및 소음제한 ······················································································································ 5
1.7.4 자연환경 보전 ···························································································································· 6
1.7.5 생태계 보전 ································································································································ 6
1.7.6 기상조건 ······································································································································ 7
1.7.7 환경관리 ······································································································································ 7
1.8 공정계획 ··············································································································································· 7
1.8.1 공사기간 ······································································································································ 7
1.8.2 시공계획서 ·································································································································· 8
1.8.3 설계의 변경 ································································································································ 9
1.8.4 공사의 일시중단 ························································································································ 9
1.8.5 작업시간 ······································································································································ 9
1.8.6 공사예정공정표 ·························································································································· 9
1.9 타공정 ··················································································································································· 9
1.9.1 현장 시공 조건 ·························································································································· 9
1.9.2 공사 상호간의 협력 ················································································································ 10
2. 자재 ····························································································································································· 10
2.1 공사용 재료의 품질 ························································································································· 10
2.2 재료 시험 및 검사 ··························································································································· 10
2.3 기계기구 ············································································································································· 11
2.4 발생품 처리 ······································································································································· 11
3. 시공 ····························································································································································· 11
3.1 시공일반 ············································································································································· 11
3.1.1 시공 확인 및 검사 ·················································································································· 11
3.1.2 기성 및 준공 검사 ·················································································································· 11
조경공사 일반사항
1. 일반사항
1.1 적용범위
(1) 이 기준은 조경공사를 시행함에 있어서 적용하여야 할 표준적인 공사시방과 계약문서, 설계
도서 등의 통일적인 해석 및 운용에 필요한 사항을 제시한다.
(2) 이 기준에 기재되어 있지 않은 내용 중 다른 공사와 관련 있는 사항에 대하여는 각각 해당
기준에 기재된 내용을 준용한다.
1.2 참고 기준
1.2.1 관련 법규
(1) 공사계약 관련 법규
∙국가를 당사자로 하는 계약에 관한 법률, 같은 법 시행령, 같은 법 시행규칙
∙지방자치단체를 당사자로 하는 법률, 같은 법 시행령, 같은 법 시행규칙
∙(계약예규)예정가격 작성기준
∙(계약예규)공사계약일반조건
1.2.2 관련 기준
(1) 공사 관계 기준
∙KCS 10 00 00 공통공사
∙KCS 11 00 00 지반공사
∙KCS 11 80 00 비탈면 보호
∙KCS 14 20 00 콘크리트공사
∙KCS 21 00 00 가설공사
∙KCS 31 00 00 설비공사
∙KCS 41 00 00 건축공사
∙KCS 44 00 00 도로공사
∙KCS 51 00 00 하천공사
∙건설공사 품질 및 규격관리 실무편람
(2) 설계도서에 따르되 기타 규정하지 않은 사항은 KCS 10 10 05(1.6)을 따른다.
(3) 공사용 자재 및 재료로써 환경기술개발 및 지원에 관한 법률에 따라 환경표지(환경마크)의
사용인증을 받은 자재 또는 재료가 있는 경우 해당 자재 및 재료를 우선 사용한다.
1.3 용어의 정의
∙설계서 : 공사계약일반조건(기획재정부계약예규) 제2조 정의 4.를 따른다.
∙설계도서 : 공사계약일반조건(기획재정부계약예규) 제2조 정의 6.를 따른다.
∙현장설명서 : 공사계약일반조건(기획재정부계약예규) 제2조 정의 7.를 따른다.
∙물량내역서 : 공사계약일반조건(기획재정부계약예규) 제2조 정의 8.를 따른다.
∙산출내역서 : 공사계약일반조건(기획재정부계약예규) 제2조 정의 9.를 따른다.
2 조경공사 일반사항
∙계약문서 : 공사계약일반조건(기획재정부계약예규) 제3조 제①항에 따른다.
∙발주자 : KCS 10 10 05(1.3.1)을 따른다.
∙수급인 : KCS 10 10 05(1.3.1)을 따른다.
∙하수급인 : KCS 10 10 05(1.3.1)을 따른다.
∙현장대리인(현장기술관리인) : KCS 10 10 05 (1.3.1)을 따른다.
∙공사감독자 : 공사감독을 담당하는 자로서 발주자가 수급인에게 공사감독자로 통고한 자와
그의 대리인 및 보조자를 포함한다(공사계약일반조건 제2조제3호의 공사감독관을 말한
다).
∙건설사업관리자 : 발주자의 위촉을 받아 공사의 시공과정에서 발주자의 자문에 응하고 설계
도서대로의 시공 여부를 확인하는 등의 감리를 행하는 자를 말한다.(건설산업기본법 제2
조)
∙지시 : KCS 10 10 05(1.3.1)을 따른다.
∙승인 : KCS 10 10 05(1.3.1)을 따른다.
∙확인 : KCS 10 10 05(1.3.1)을 따른다.
∙협의 : KCS 10 10 05(1.3.1)을 따른다.
1.4 제출물
(1) 수급인이 공사감독자에게 제출한 자료의 작성과 발송에 대한 요건 및 절차는 KCS 10 10
05 를 따른다.
(2) 수급인은 공사시행 전에 해당 공사의 시공계획을 수립하여 사전에 공사감독자의 확인을 받
아야 한다.
(3) 수급인은 공사에 사용할 모든 주요 자재의 수급계획과 공급원을 공사감독자에게 공사착수
전에 제출하여 승인받아야 한다.
(4) 수급인은 공사시행 전 시공도면, 사용자재에 대한 검토의견서를 공사감독자에게 제출한다.
(5) 수급인은 관계법이 정한 바에 따라 공사감독자에게 품질관리계획서를 제출하여야 하며 수
급인이 수행한 제반시험의 결과보고서는 품질시험기술자가 서명⋅날인하여 제출한다.
(6) 수급인은 외부에서 토석이 반입되는 경우 반입토의 재료와 수량을 기재한 반입전표를 공사
감독자에게 반드시 제출한다.
(7) 구조적인 문제로 공사의 안전이 우려되는 경우, 수급인은 전문가가 작성⋅날인한 보고서를
제출하여야 한다.
1.5 공사기록서류
(1) 공정사진은 공사감독자와 협의하여 매월 말을 기준으로 동일방향, 동일거리에서 촬영한다.
(2) 공사기록사진은 공종별로 공사 진행에 따라 시공 전, 시공 중 및 시공 후의 상황이 선명하게
식별되도록 촬영하여야 하며 공사 시공 중 매몰되어 나타나지 않는 부분과 기타 공사감독자가
지시하는 부분은 수시로 촬영⋅기록해야 한다.
(3) 공정사진과 공사기록사진은 공사현장에 사진첩으로 비치하여야 하며, 준공검사원과 함께
3 조경공사 일반사항
제출한다. 공사 중의 사진첩 제출은 공사시방서 또는 공사감독자의 지시에 따른다.
(4) 준공도면은 공사 중 변경된 부분을 모두 반영하여 준공검사원과 함께 제출한다.
(5) 공사사진
① 공종에 따른 사진촬영 대상부위는 표 1.5-1과 같으며, 기타 공사의 품질확인 또는 공사의
변경을 요하는 경우 이를 포함한다. 공사의 종류 시점 내용 조경구조물공사
터파기 후
철근조립 후
거푸집 제거 후
매설심도 및 바닥상태
조립상태
규격 및 마감상태
배관, 관수, 수경시설공사 배관 완료 후 매설심도 및 배관상태 조경포장공사
원지반 다짐 후
표층다짐 및 포설 후
놀이터, 운동장조성공사 바닥정지 후
평탄성
다짐두께 및 평탄성
정지상태 및 모래포설, 마사토
다짐 두께
면고르기 상태
시비 여부
식재면 고르기 후
고무밴드나 와이어, 비닐 등의
식재공사
식재 시
제거 여부
수목의 뿌리분 파손 여부
가지치기, 꽃⋅잎따기 등 적정
식재⋅잔디 시공 후
시행 여부
식재, 잔디 시공처리상태
1.6 품질보증
1.6.1 품질관리계획
(1) 수급인은 건설공사의 품질확보를 위하여 건설기술진흥법 시행규칙 제37조에 의거 품질관
리계획 또는 품질시험계획을 발주자에게 제출하여 승인을 받아야 한다.
(2) 품질보증계획은 KS A 9001~2000 에 따른다. 다만, 발주자가 필요하지 않다고 별도로 통보
한 사항은 그러하지 아니하다.
(3) 수급인은 품질보증계획 또는 품질시험계획에 따라 건설공사의 품질관리를 이행하여야 하며,
발주자는 시공 및 사용재료에 대한 품질관리업무의 적정성을 연 1회 이상 확인한다. 이 경우 수
급인은 품질관리 적정성 확인에 입회하여야 한다.
(4) 수급인은 품질관리비를 건설기술진흥법 관련 규정의 기준에 따라 당해 목적에만 사용하여
야 하며, 발주자는 이의 사용에 관하여 지도⋅감독한다.
4 조경공사 일반사항
1.6.2 품질시험⋅검사
(1) 수급인은 건설기술진흥법 관련 규정에 의거하여 품질시험 및 검사를 실시하여야 한다.
(2) 수급인은 구조물의 안전에 중요한 영향을 미치는 시험종목의 품질시험⋅검사를 실시할 때
에는 공사감독자에게 입회를 요청하여 공사감독자 입회하에 품질시험 검사를 시행하여야 한다.
(3) 품질시험 중 건설공사현장에서 실시함이 적절한 시험은 현장시험을 실시하여야 한다. 그리
고 현장시험실에서 시행할 수 없는 자재 품질시험은 품질검사전문기관(국⋅공립시험기관 또는
국토교통부장관에게 등록한 자)에 의뢰하여 시행한다.
(4) 현장시험실 또는 품질검사전문기관에 의뢰하여 시험하는 것이 부적합한 자재는 제조공장에
서 품질시험⋅검사를 시행할 수 있다.
(5) 수급인은 품질관리 및 검사결과가 설계서의 기준에 부적합한 경우(이하 ‘불합격’이라 한다)
에는 시험작업일지에 그 내용을 기재한 후 즉시 공사감독자에게 보고하고, 불합격된 자재를 지
체 없이 장외로 반출하여야 한다.
(6) 품질시험 및 검사에 불합격된 경우 수급인은 조속히 동일자재가 아닌 자재를 선정하여 품질
시험을 재시행하여야 하며, 이에 따른 추가비용은 수급인이 부담한다.
1.7 환경요구사항
1.7.1 수질오탁방지
(1) 공사현장에 폐수배출시설을 설치하고자 할 때에는 관련 법규에 의한 신고 또는 인⋅허가를
받은 후 설치⋅운영한다.
(2) 공공수역에서 분뇨, 동물의 사체, 쓰레기 또는 오니를 버리거나 차량을 세차하는 행위를 하
여서는 안 된다.
(3) 강우 시 하천수질의 탁도증가, 토사퇴적 등을 사전에 방지하기 위하여 임시배수로, 저류조,
물막이공 등의 준비작업을 철저히 시행한다.
1.7.2 악취 및 먼지날림방지
(1) 공사차량 운행 시에는 적재함 덮개를 사용하고, 바퀴씻기시설 등을 설치하여야 하며 도로에
는 살수차량을 운행하여 먼지의 날림을 방지한다.
(2) 악취가 발생하는 물질을 소각하고자 할 때에는 관련 법규에서 정하는 적합한 소각시설을 사
용한다.
1.7.3 진동 및 소음제한
(1) 수급인은 건설공사에 수반하는 소음진동의 발생을 가능한 한 방지하여 생활환경의 보전에
노력한다.
(2) 소음⋅진동 배출시설을 설치하고자 할 때에는 소음⋅진동관리법에 의한 신고 또는 인⋅허가
를 받은 후 설치, 운영한다.
(3) 공사지역이 건설소음⋅진동규제지역으로 지정되거나 규제지역 안에서 공사를 시행하고자
할 때에는 소음⋅진동관리법에 의한 신고 또는 인⋅허가를 받아야 하며, 관계 기관의 지시에 따
5 조경공사 일반사항 라야 한다.
(4) 공사차량의 운행으로 인한 소음의 영향을 저감하기 위하여 차량의 운행속도를 제한하여야
하며, 작업장에서는 사용 기계의 작업시간조정 등 소음저감대책을 수립한 후 시공한다.
1.7.4 자연환경 보전
(1) 수급인은 설계서, 사전환경성검토서 및 환경영향평가서에 명시된 사항에 따라 자연환경 보
전 및 복원을 위해 노력하여야 한다.
(2) 수급인은 흙쌓기 구간이나 흙깎기⋅흙쌓기의 변화구간 또는 연약지반에서 주로 발생하는
지반침하를 방지하기 위하여 설계서에 따라 지반개량 및 다짐작업을 철저히 하여야 한다.
(3) 수급인은 지하수법에 따른 절차를 이행하여 지하수 오염을 방지토록 하여야 한다.
(4) 수급인은 공사현장의 지하수 이용실태를 조사하고 지하수 고갈에 따른 대책을 수립하여 민
원이 발생되지 않도록 하여야 한다.
(5) 수급인은 사용치 않는 폐공에 대해서는 지하수의 오염방지를 위하여 환경에 오염이 없도록
불투수성 재료로 원상 복구하여야 하며, 공사감독자는 준공검사 시 폐공의 적정처리 여부를 포
함하여 검사하여야 한다.
(6) 수급인은 공사 시 공사장에서 발생하는 토양오염유발시설에 대해 토양환경보전법에 따라
조치를 하여야 한다.
(7) 수급인은 토공작업 시 표토 등 비옥도가 높은 토양을 일정장소에 수집, 보관, 관리하여 조경
공사 시 식재토양으로 재활용하여야 한다.
(8) 수급인은 비탈면의 안정과 산사태를 방지하여야 하며, 비탈면에 대한 녹화 및 피복처리는
가능한 한 조기에 실시하고, 우기에 비탈면 토사가 유출되지 않도록 보호조치를 취하되, 토사의
채취, 운반은 가능한 우기를 피하여야 한다.
1.7.5 생태계 보전
(1) 수급인은 건설공사를 수행함에 있어서 자연생태계를 고려한 환경친화적 건설사업이 될 수
있도록 노력하여야 한다.
(2) 수급인은 건설공사 시행에 따른 식생의 훼손을 최소화하기 위하여 공사용 가설도로, 가설시
설물 설치 시에 주변 환경여건을 고려하여 시공하여야 하며 이식이 가능한 수목은 가식지역을
선정하여 최대한 활용하도록 한다.
(3) 공사 중 보호동물, 보호식물 또는 보호식생군락과 희귀생물의 서식지 등이 발견되는 경우에
는 공사감독자에게 보고하고 지시를 받는다.
(4) 건설지역에 따라 동식물의 서식지, 이동로의 단절 등이 최소화되도록 설계 시는 물론 시공
전에 철저한 조사 및 이동로 설치 등 대책수립 후 공사를 시행하도록 한다.
(5) 공사현장의 자생수목으로서 단지조성 등의 기반공사 후 활용이 가능하다고 판단되는 수목
은 공사감독자와 협의하여 굴취, 가식 등의 보호조치를 취하고 기반조성 공사 후 활용한다.
(6) 설계서에 보전하도록 지정된 교목, 관목, 덩굴식물, 잔디나 다른 경관구조물은 공사감독자의
승인을 받은 임시 울타리 등으로 둘러 구분하여야 한다. 수급인은 승인 받은 작업 지역 경계 바
6 조경공사 일반사항
깥의 경관구조물이 시공 중에 손상되거나 파괴된 경우 복구해야 한다.
1.7.6 기상조건
(1) 흙공사
① 흙이 동결되어 있을 경우에는 흙쌓기, 되메우기, 관의 매설작업을 중지한다.
② 기존 지반, 진행 중인 공사 또는 완성된 공사에 손상을 주거나 해로울 수 있는 일기조건 중에
는 터파기 작업을 해서는 안 된다.
③ 강우, 과습 또는 이상건조 시에는 작업시행여부를 공사감독자와 협의한다.
④ 강우 등으로 인하여 흙다짐 최적함수율보다 과습할 경우에는 되메우기 작업을 중지한다.
(2) 콘크리트 공사
① 콘크리트 및 모르타르 공사는 일평균기온 4 ℃ 이상에서 시행하여야 하며, 불가피하게 공사
를 수행해야 할 경우에는 공사감독자의 승인을 받아 필요한 보온조치를 하여야 한다.
② 외기의 최고온도가 30 ℃를 초과하면 콘크리트를 냉각시킬 수 있는 방법에 대하여 공사감독
자와 상의하여야 하며, 외기의 온도가 0 ℃ 이하로 내려가거나 콘크리트를 치는 동안 0 ℃ 이하
로 내려갈 것으로 예상되는 경우에는 보온조치에 대하여 공사감독자와 상의하여야 한다.
(3) 식재공사
① 식재공사는 해당 공사지역의 식재적기를 감안하여 정한다.
② 적기 식재에도 불구하고 기온이 2 ℃ 미만 32 ℃ 이상, 평균풍속 15 m/s를 초과하는 경우에
는 공사를 중지하여야 한다.
③ 강우 시 또는 이상기후일 경우, 공사감독자가 승인한 경우가 아니라면 식재작업을 해서는 안
된다.
1.7.7 환경관리
(1) 강우에 의한 토사유출로 환경피해가 발생하지 않도록 방지시설을 설치한다.
(2) 공사차량 운행 시 먼지발생 등의 피해를 억제하기 위한 제반 시설(바퀴씻기시설 등)을 설치
하고 필요한 조치를 취한다.
(3) 시멘트 가루, 콘크리트 잔재물 등 수목생육에 유해한 물질이 인근의 식재지로 유입되지 않
도록 하여야 한다.
(4) 가로수 등의 포장지역 식재에는 작업 도중 발생하는 토사로 도로 등이 더럽혀지지 않도록
한다.
(5) 공사 준공 전에 식재 후 남은 돌, 흙, 전지 및 전정에 의한 지엽의 잔재, 지주목 토막, 기타
오물 및 쓰레기 등을 깨끗이 청소하고 공사 후 남는 자재나 기타 폐기물은 적법한 절차를 거쳐
외부로 반출한다.
1.8 공정계획
1.8.1 공사기간
(1) 수급인은 따로 정한 경우를 제외하고는 계약문서상에 명기된 기간 내에 공사를 착공하고 지
체 없이 공사를 추진하여 계약 기간 내에 완료해야 한다.
7 조경공사 일반사항
(2) 시공 후 잔류침하에 의한 후속 공사물의 파손위험이 예상되는 경우에는 잔류침하가 허용범
위 내에 도달할 때까지의 기간을 감안하여 충분한 공사기간을 설정해야 한다.
(3) 연결⋅중복공사 및 선행공사로 인하여 공사의 원활한 진행에 문제가 있다고 판단되는 경우
에는 수급인은 발주자와 협의하여 공사기간을 조정할 수 있다.
(4) 장기공사의 경우 공사완료부분에 대해 수급인은 부분준공을 요청할 수 있으며 발주자는 수
급인과 협의하여 부분준공처리 한다.
(5) 부적기식재, 천재지변 등 공사의 지연이 불가피한 경우에는 공사감독자의 승인을 받아 공사
기간을 연장한다.
(6) 공사 준공 일자와 관련하여 공사 여건상 불가피하게 식재 부적기에 식재하여야 할 경우 공
사감독자의 승인을 받아 식재공사를 시행하되 부적기에 필요한 수목 양생조치를 추가 실시하여
야 하며, 부적기 식재로 추가되는 비용은 원인제공자가 부담한다.
(7) 이월된 식재공사는 이월공사기간에도 불구하고 식재적기 개시일로부터 최소 15일 이상의
공사기간이 확보되어야 한다. 최소 공사기간은 공사종류와 규모에 따라 차이가 있으므로 공사
감독자와 협의하여 결정한다.
(8) 식재공사 기한이 차기의 식재적기로 이월되더라도 식재공사를 제외한 타공사의 공사기한은
이월되지 않는다. 단, 건축, 토목 등 관련공사의 공사기한이 동절기 물공사 중단기간 등에 해당
될 경우에 한하여 시설물 및 기타공사의 공사기한도 식재공사와 같이 이월한다.
1.8.2 시공계획서
(1) KCS 10 10 10(1.8)을 따른다.
(2) 시공계획서에 기재할 주요한 항목은 다음과 같다.
① 공사개요
② 공사공정예정표
③ 현장조직표
④ 주요장비 동원계획
⑤ 주요자재 반입계획
⑥ 인력동원계획
⑦ 긴급시의 체제
⑧ 품질관리계획 또는 품질시험계획
⑨ 안전관리계획
⑩ 환경관리계획
⑪ 교통관리계획
⑫ 가설계획(가설구조물, 가설설비, 현장사무소, 재료적치장 등 가설시설물)
⑬ 수목 가이식장 계획
⑭ 현장사무소, 재료적재장 등의 계획
⑮ 기타
(3) 수급인이 부득이한 사유로 인해 공사내용을 변경하고자 하는 경우에는 공사감독자의 지시
8 조경공사 일반사항
에 따라 변경도면, 수량계산서 및 참고자료를 포함한 변경시공계획서를 작성하여 공사감독자에
게 제출하고 승인을 얻어 시공해야 한다. 단, 가설물의 위치 및 설치 방법의 변경 등 경미한 사
항은 공사감독자와 협의하여 시공한다.
1.8.3 설계의 변경
(1) KCS 10 10 10(1.15)를 따른다.
(2) 설계변경조건
① 부적기식재, 천재지변 등 공사의 지연이 불가피한 경우에는 공사감독자의 승인을 받아 공사
기간 연장
1.8.4 공사의 일시중단
(1) 공사계약일반조건 제47조(공사의 일시정지)를 따른다.
1.8.5 작업시간
(1) 공사는 근로기준법에 의해 정해진 시간 중에 시행하는 것을 원칙으로 한다. 규정시간외 또
는 휴일작업을 시행할 필요가 있을 경우에는 사전에 공사감독자의 승인을 얻어야 한다.
(2) 공사시행상의 형편에 따라 작업시간의 연장이나 단축, 또는 야간작업의 필요성을 공사감독
자가 인정할 때에는 품질확보에 지장이 없는 한 수급인은 그 지시에 따라야 한다.
1.8.6 공사예정공정표
(1) 수급인은 시공계획에 따라 공사예정공정표를 작성하고 공사감독자의 승인을 얻는다.
(2) 수급인이 제출하는 공사예정공정표에는 다음 사항이 명시되거나 첨부되어야 한다.
① 공종별 및 공종 내 주요 공정단계별 착수시점, 완료시점
② 공종별 및 공종 내 주요 공정단계별 선⋅후⋅동시 시행 등의 연관관계
③ 주공정선(Critical path) 또는 주공정 공사의 목록
(3) 수급인은 실시공정에 따라 적절한 관리를 행하고 공기 내에 완성한다.
(4) 설계변경 및 공사기간 변경 등으로 공정에 변동이 있는 경우 변경공정표를 작성하여 공사감
독자의 승인을 얻는다.
1.9 타공정
1.9.1 현장 시공 조건
(1) 건축, 토목 등의 선행공사와 연결되어 조경공사가 시행되는 경우의 공사현장 인도 및 인수
는 선행공사로 인한 제반 공사장애요인이 완전히 정리된 조건으로 한다.
(2) 식재지역에 선행공사에 의한 쓰레기 및 모르타르, 벽돌, 블록 등 공사 관련 폐자재 등의 식
재부적합토가 매립된 경우에는 반드시 식재용토로 교체한 후 식재하여야 하며 이에 대한 비용
은 원인제공자 부담으로 별도로 정산되어야 한다.
9 조경공사 일반사항
1.9.2 공사 상호간의 협력
(1) 타 공사와 동시에 진행되어야 할 필요가 있는 경우에는 선후공종에 하자나 공정상의 지연이
생기지 않도록 하여야 한다.
(2) 수급인은 당해 공사와 연계되어 분리 발주된 모든 공사 수급인과의 상호마찰을 방지하고 전
체공사가 계획대로 완성될 수 있도록 공사의 선후 또는 병행시행, 공사착수시기, 공사 진행속도,
공사범위, 공사 준비, 공사물 보호 및 가설시설 등에 대하여 협의하여야 하며, 협의과정에서 도
출된 사항에 대하여는 발주자에게 설계변경을 요청할 수 있다.
(3) 토목공사가 시행되는 포장구역 안에 설치되는 조경시설은 토목공사 책임자와 협의하여 주
위가 미려하게 마감될 수 있도록 한다.
2. 자재
2.1 공사용 재료의 품질
(1) 설계도서 및 공사시방서 또는 공사감독자의 별도 지시가 없는 경우에는 이 기준에서 정한
품질과 규격에 부합하는 재료를 사용한다.
(2) 이 기준에 품질과 규격 등이 규정되어 있지 않은 경우에는 한국산업표준표시품 또는 한국산
업표준에 준하는 품질과 규격에 부합하는 재료 또는 환경부하가 적은 환경표지(마크), GR마크,
저탄소인증자재 등 정부가 정한 기준에 의하여 인증 받은 녹색자재 및 제품을 우선적으로 사용
한다.
(3) 기성품을 포함한 공사용 재료는 현장 반입 전에 공사용 재료별 견본⋅제품시방서 제출, 현
장 확인 등의 방법으로 공사감독자의 사전 검사를 받아야 하며, 수급인은 공사감독자의 지시에
따라 품질을 확인할 수 있는 증빙자료를 제출하여야 한다.
(4) 견본 제출 또는 현장 확인 등의 사전 검사에도 불구하고 공사용 재료가 현장에 반입되면 공
사감독자로부터 사용 여부를 승인받아야 한다. 또한 합격한 재료는 작업과 통행 등에 지장이 없
는 장소에 정리하여 보관하며 공사감독자의 수시 점검이 용이하게 이루어질 수 있도록 조치한
다.
(5) 불합격된 재료는 장외에 반출하고 신속히 대체품을 반입하여 공사 진행에 지장이 없도록 한
다
2.2 재료 시험 및 검사
(1) 검사 또는 시험은 한국산업표준을 표준으로 하고, 그 규격에 제정되어 있지 않은 것은 이 기
준의 해당 각 항 또는 공사감독자의 지시에 따른다.
(2) 재료시험용 공시체는 담당원의 입회하에 채취하고 봉인하여 검인을 받고 공인인증기관에서
시험하고 그 성적결과보고서를 제출하여 승인을 받는다.
(3) 시험 또는 검사 종료 후 합격한 반입재료는 소정의 장소에 정돈하여 적절한 보관을 한다.
10 조경공사 일반사항
2.3 기계기구
(1) 공사용 기계기구를 사용할 경우에는 관계 법규를 준수함은 물론 취급 자격을 보유한 자를
배치한다.
(2) 사용하는 기계기구는 충분히 정비⋅점검하고 사용하지 않는 기계기구는 안전조치를 충분히
하여 철저히 확인하도록 한다.
2.4 발생품 처리
(1) 시공단계에서 발생하는 잔토, 사토, 사석, 목재 등의 부산물은 재활용할 수 있는 방안을 최
대한 강구하도록 하며, 시공에 의해 발생한 현장 발생품은 공사감독자의 지시에 따라 정리⋅보
관하고, 반납서와 함께 지정된 장소에 인도해야 한다.
(2) 건설부산물의 활용이 설계도서에 반영된 경우 건설부산물의 재질, 규격, 성분 등이 활용에
적합한지를 확인하고, 효과적인 재이용 방안을 수립 시행하여야 하며, 재이용이 불가능할 경우
에 발생되는 처리 및 운반 등에 관한 대책을 마련하여야 한다.
(3) 공사에서 발생한 아스팔트나 콘크리트 잔해 등 산업폐기물은 폐기물처리에 관한 법률에 따
라 처리하여야 하며 그 처리책임은 수급인에게 있다.
3. 시공
3.1 시공일반
3.1.1 시공 확인 및 검사
(1) 수급인은 품질관리계획에 따라 매 공사단계마다 주요 검사항목에 대해 시공품질을 확인하
고 공사감독자의 승인을 받은 뒤 다음 공사단계를 진행한다.
(2) 검사 시에 필요한 자료의 작성, 측량 및 기타의 처리는 공사감독자의 지시에 따른다.
3.1.2 기성 및 준공 검사
(1) 수급인은 공사가 준공되었을 경우에는 준공검사원을, 기성을 청구하고자 할 때에는 기성검
사원을 제출한다.
(2) 공사의 기성 검사 또는 준공 검사를 받을 때에는 검사 당일에 현장대리인과 공사감독자가
입회한다.
11
KCS 34 20 10 조경 토공사
목
차
1. 일반사항 ······················································································································································· 12
1.1 적용범위 ··············································································································································· 12
1.1.1 일반사항 ······································································································································ 12
1.1.2 표토 보전 및 활용 ···················································································································· 12
1.1.3 지형변경 및 대지조형 ·············································································································· 12
1.1.4 식재지반 조성 ···························································································································· 12
1.2 참고 기준 ············································································································································· 12
1.2.1 관련 법규 ···································································································································· 12
1.2.2 관련기준 ······································································································································ 12
1.3 용어의 정의 ········································································································································· 13
1.4 제출물 ··················································································································································· 13
1.4.1 시공계획서 ·································································································································· 13
1.4.2 제출자료 ······································································································································ 13
1.5 운반, 보관, 취급 ································································································································· 13
1.6 환경요구사항 ······································································································································· 13
1.7 현장수량검측 ······································································································································· 13
2. 자재 ······························································································································································· 14
2.1 재료 ······················································································································································· 14
2.1.1 흙쌓기 재료 일반 ······················································································································ 14
2.1.2 표토 ·············································································································································· 14
2.2 장비 ······················································································································································· 14
2.2.1 건설장비 ······································································································································ 14
2.3 자재품질관리 ······································································································································· 14
KCS 34 20 10 조경 토공사
목
차
3. 시공 ······························································································································································· 14
3.1 시공조건 확인 ····································································································································· 14
3.2 작업준비 ··············································································································································· 14
3.2.1 준비배수 ······································································································································ 15
3.2.2 규준틀 설치 ································································································································ 15
3.2.3 표토 활용계획 검토 ·················································································································· 15
3.3 지형변경 및 대지조형 ······················································································································· 15
3.3.1 땅깎기 ·········································································································································· 15
3.3.2 토사 운반 ···································································································································· 15
3.3.3 흙쌓기 ·········································································································································· 15
3.3.4 대지조형 ······································································································································ 15
3.4 표토 채취 및
활용 ··························································································································· 15
3.4.1 표토 채취 ···································································································································· 15
3.4.2 표토 보관 ···································································································································· 16
3.4.3 표토 펴기 ···································································································································· 16
3.5 시공허용오차 ······································································································································· 17
3.6 현장품질관리 ······································································································································· 17
3.6.1 품질관리 ······································································································································ 17
3.6.2 시험시공 ······································································································································ 17
3.6.3 다짐도 검사 ································································································································ 17
조경 토공사
1. 일반사항
1.1 적용범위
1.1.1 일반사항
(1) 이 기준은 조경공사의 지형변경, 대지조형, 표토 보전 및 활용에 적용한다.
(2) 조경 구조물 및 시설물 공사, 포장공사 및 관로공사 등을 위한 터파기, 되메우기 및 다짐, 잔토
처리 등의 토공사는 KCS 34 50 05 (3.2.1)에 따른다.
(3) 시공구간에 암 발생으로 암깎기 등의 공법이 요구되는 경우는 KCS 11 20 10(3.3.13)의 관련
조항, 연약지반이 발생한 경우에는 KCS 11 30 00 의 관련 조항에 따른다.
(4) 이 기준에 서술되지 않은 공사에 대해서는 공사시방서를 따른다.
1.1.2 표토 보전 및 활용
(1) 표토의 채취, 운반, 보관 및 포설에 적용한다.
1.1.3 지형변경 및 대지조형
(1) 기존 지형의 보존, 조경공간(조경구조물 및 조경시설물, 동선 등) 부지 조성 및 지형연결을 위
한 지형변경, 경관연출을 위한 마운딩 등의 대지조형을 위한 조경 토공사에 적용한다.
1.1.4 식재지반 조성
(1) KCS 34 30 10의 식재기반조성과 연계하여 식재 하부용토 등으로 식물의 뿌리가 생육할 수
있는 지반이 조성되도록 조경 토공사에 적용 한다.
1.2 참고 기준
1.2.1 관련 법규
내용 없음
1.2.2 관련기준
(1) 관련기준
- KCS 10 10 10 공무행정요건
- KCS 10 10 15 품질관리
- KCS 10 10 20 자재관리
- KCS 11 20 10 땅깎기(절토)
- KCS 11 20 15 터파기
- KCS 11 20 20 흙쌓기(성토)
- KCS 11 20 30 사토 및 잔토처리
- KCS 11 30 00 연약지반개량공사
- KCS 34 30 10 식재기반조성
- KCS 34 50 05 조경시설물공통
12 조경 토공사
(2) 참조표준
- KS F 2302 흙의 입도 시험방법
- KS F 2303 흙의 액성한계․소성한계 시험방법
- KS F 2306 흙의 함수량 시험방법
- KS F 2312 흙의 다짐시험 방법
- KS F 2510 콘크리트용 모래에 포함되어 있는 유기불순물 시험방법
1.3 용어의 정의
내용없음
1.4 제출물
1.4.1 시공계획서
(1) 수급인은 KCS 34 10 10 (1.4)에 따라 공사계획에 맞추어 시공계획서를 작성하여 공사감독자
에게 제출하여야 한다.
1.4.2 제출자료
(1) 공사 시행과 관련하여 아래 등의 자료가 요구되는 경우 공사 시행 전에 공사감독자에게 제출
하여야 한다.
① 비탈면의 기울기 조정이 필요한 경우 비탈면 안정 및 대책 검토서
② 공사 중 배수처리계획서
③ 공사 중 표면침식보호(가보호막) 계획서
④ 표토활용계획 검토서
⑤ 표토 가적치장 사용 관련 서류
1.5 운반, 보관, 취급
(1) KCS 10 10 20 (1.9)에 따른다
1.6 환경요구사항
(1) 시공에 앞서 수급인은 시공구역 내의 지하매설물 및 지장물을 조사하고, 설계에 따른 제거대
상과 보호대상을 구분하여야 한다. 설계에 반영되지 않은 지장물 등은 현황자료를 공사감독자에
게 제출하여야 한다.
1.7 현장수량검측
(1) 수량산출은 설계에 의한 다짐상태의 시공기준면을 기준으로 한다.
(2) 땅깎기 작업은 토사 채취 후 지정된 장소까지 운반하여 흙쌓기 또는 가적치 작업이 완료된 상
태를 기준으로 한다.
(3) 흙쌓기 작업은 운반된 토사를 지정된 높이, 두께 및 경사로 포설하고 다짐 등이 완료된 상태를
13 조경 토공사 기준으로 한다.
(4) 표토 채취량은 채취 후 지정된 장소까지 운반하여 흙쌓기 또는 가적치 작업이 완료된 상태를
기준으로 한다.
2. 자재
2.1 재료
2.1.1 흙쌓기 재료 일반
(1) 땅깎기에서 발생한 재료는 현장 토질시험 성과에 의하여 사용가능 여부를 판단하여야 하며,
흙쌓기 또는 기타 설계도서에 명기된 목적에 최대한 활용하도록 하여야 한다.
(2) 일반 흙쌓기 재료의 품질 및 구비요건에 관한 사항은 KCS 11 20 20(2.1.1, 2.1.4(1))를 따른
다.
(3) 외부 반입토는 양질의 토사를 반입하는 것을 원칙으로 하며, 쌓기재료의 품질기준에 적합하
여야 한다. 단, 공사감독자의 승인을 얻어 달리 시공할 수 있다.
(4) 식재지반조성을 위한 흙쌓기 재료의 품질 및 구비조건은 KCS 34 30 10 (2.1 (2))의 기준에 따
른다.
2.1.2 표토
(1) 표토의 구성범위 및 토성은 공사시방서를 따른다.
2.2 장비
2.2.1 건설장비
(1) KCS 11 20 15 2.1(1), KCS 11 20 20(2.2.1)를 따른다.
2.3 자재품질관리
(1) KCS 11 20 20(2.3.1)를 따른다.
3. 시공
3.1 시공조건 확인
(1) 수급인은 공사착수 전에 명시된 경계선, 표고, 등고선 및 기준면을 설계도서와 비교⋅확인하
고 공사를 시행한다.
(2) 땅깎기 및 흙쌓기 작업 전에 표토 활용계획 유무를 확인하고, 표토의 채취 및 운반 등의 작업
을 선행하도록 작업계획을 수립하여야 한다.
(3) 표토의 가적치가 필요한 경우, 가적치장을 우선하여 조성하여야 한다.
(4) 땅깎기 및 흙쌓기 구간의 기존 수목에 대한 이식활용 계획을 확인하고, 토공사 작업 전에 선행
될 수 있도록 협의하여 시행하여야 한다.
(5) 이외의 사항은 KCS 11 20 10(3.1.1), KCS 11 20 20(3.2.1)에 따른다.
14 조경 토공사
3.2 작업준비
3.2.1 준비배수
(1) KCS 11 20 20 (3.2.2(1))에 따른다
3.2.2 규준틀 설치
(1) KCS 11 20 20 (3.2.2(2))에 따른다
3.2.3 표토 활용계획 검토
(1) 작업착수 전에 설계도서의 표토활용계획을 현장 확인하여 채집 위치, 예상 채집량, 현황사진,
표토 품질기준 적합여부 분석결과, 채집방법, 채집예정일정, 직접 포설 위치 및 보관장소 등을 검
토한 보고서를 공사감독자에게 제출하여야 한다.
(2) 설계도서의 표토활용계획과 현장상황이 다른 아래의 사항 등에 대하여 공사감독자와 협의․
조치하여야 한다.
① 표토 품질기준에 적합하지 않은 경우
② 표토 채집 작업 조건이 설계조건과 상이한 경우
③ 표토 예상 채집량 및 활용량이 상이한 경우
④ 표토 보관장소의 보관기간, 타 공종과의 상충, 보관장소로서의 환경 등이 미흡한 경우
3.3 지형변경 및 대지조형
3.3.1 땅깎기
(1) KCS 11 20 10 (3.3)을 따른다.
3.3.2 토사 운반
(1) KCS 11 20 30 (3.3.2)에 따른다
3.3.3 흙쌓기
(1) KCS 11 20 20 (3.3)을 따른다.
3.3.4 대지조형
(1) 경관연출을 위한 대지조형은 설계목적에 부합되도록 설계도서에 따라 시공하여야 한다.
(2) 땅깎기 및 흙쌓기 등의 결과로 발생하는 비탈면의 상․하부는 라운딩 처리하여 자연경관과 잘
어울리도록 한다.
(3) 녹지구간 및 대지조형 구간은 공사 완료 후 표면배수가 원활히 이루어질 수 있도록 미세지형
을 조정하고, 배수계통으로 연결하여 배출되도록 한다.
3.4 표토 채취 및 활용
3.4.1 표토 채취
15 조경 토공사
(1) 표토 채취 대상지 및 채취 깊이는 기존 토지이용이 임야인 경우 부식되지 않은 유기물층을 제
거한 후 노출된 지표면으로부터, 기존 토지이용이 밭인 경우 지표면으로부터 채취하여야 하며, 채
취 깊이는 설계도서의 표토활용계획에 따르며, 제시되지 않은 경우 0.2m 를 기준으로 하되 사용
기계의 작업능력과 안전을 고려하여 정한다.
(2) 채취 구간은 설계도서의 표토활용계획에 따르되, 현장 조사 결과에 따라서 표토의 품질 조건
에 가장 부합되며, 채취, 운반, 보관 및 작업의 난이도를 감안하여 소요량을 채취하기 위한 구역의
우선 순위를 설정하여 진행한다.
(3) 중기 사용에 의하여 식재에 부적합한 토양으로 변화되지 않도록 채취, 운반, 적치의 적절한 작
업 방법을 선정한다.
(4) 기상상황 및 현장여건 등이 좋지 않은 경우 채취작업을 중지하여야 하며 재작업은 공사감독
자와 협의한 후 시행하여야 한다.
① 강우로 인하여 표토가 습윤상태인 경우에는 작업을 중지하며, 동일한 토양이라도 습윤상태에
따라 토양의 변화 정도가 다르므로 과습한 표토의 작업은 건조기에 시행한다.
② 먼지가 날 정도의 이상조건일 경우
③ 지하수위가 높은 평탄지
④ 토사유출의 위험이 있는 비탈면
3.4.2 표토 보관
(1) 가적치 기간 중에는 표토의 성질변화, 바람에 의한 비산, 적치표토의 우수에 의한 유출, 양분
의 유실에 유의하여 식물로 피복하거나 비닐로 덮어 주어야 한다.
(2) 가적치 장소는 배수가 양호하고 평탄하며 바람의 영향이 적은 장소를 선택한다.
(3) 적절한 장소의 선정이 곤란한 경우에는 방재나 배수처리 대책을 강구한 후 가적치한다.
(4) 가적치의 최적두께는 1.5 m 를 기준으로 하며 최대 3.0 m 를 초과하지 않는다.
(5) 가적치시 마감면을 표면배수가 용이하도록 상부면과 사면을 정리하며, 별도의 다짐은 시행하
지 않는다.
(6) 가적치 장소에 표토의 하중으로 인해 피해가 우려되는 시설이 있는 경우 공사감독자와 협의
하여 조치하여야 한다.
3.4.3 표토 펴기
(1) 포설 전에 부지의 마감 계획고와 표토 포설두께를 확인하여 과성토 또는 계획고 미달이 발생
하지 않도록 하여야 한다.
(2) 표토활용계획에 따라 포설위치에 설계도서에 따른 포설두께로 포설하여야 한다.
(3) 다른 토양 또는 토양개량제 등과의 혼합이 설계된 경우, 단일 토양의 상태가 될 수 있도록 충
분히 교반하여 포설하여야 한다.
(4) 표토 포설지역이 원지반 또는 토공 마감 후 시간 경과 등으로 다짐되어 토층의 분리가 우려되
는 경우에는 깊이 0.2 m 이상을 경운한 후 그 위에 표토를 포설한다.
(5) 표토의 다짐은 공사시방서에 따르되, 별도의 명시가 없는 경우 수목의 생육에 지장이 없는 정
16 조경 토공사 도 또는 비다짐으로 포설한다.
3.5 시공허용오차
(1) 토사 비탈면 땅깎기 허용오차의 범위는 ±100mm 를 기준으로 하며, 기타 조건은 KCS 11 20
10 (3.4)를 따른다
(2) 표토층을 제외한 흙쌓기, 깔기 마무리면의 시공허용차는 ±50 mm 이내로 한다.
(3) 쌓기 재료의 함수량은 포설하는 동안에 공사감독자가 승인한 함수량에서 ±2% 내로 유지하
여야 한다.
(4) 쌓기의 각 층은 다짐이 끝나면 재료의 품질 및 다짐도가 기준에 적합하게 시공 되었는지 공사
감독자의 검사를 받은 후 다음 층을 포설하여야 한다.
(5) 현장밀도 시험결과 적정한 밀도를 얻지 못한 경우에는 그 층을 재다짐하여 소요 밀도를 얻을
때까지 반복하여야 한다.
(6) 매 10 m 마다 표고를 측정하며, 10 m 이내에 지형의 변화가 있을 때는 지형 변화점을 추가하
여 측정한다.
3.6 현장품질관리
3.6.1 품질관리
(1) KCS 10 10 15에 명시된 요건에 따라 적절한 품질관리계획을 수립하여 실시하여야 한다.
3.6.2 시험시공
(1) KCS 11 20 20 (3.5.2)에 따른다.
3.6.3 다짐도 검사
(1) KCS 11 20 20 (3.5.3)에 따른다.
17
KCS 34 50 05 조경시설물공통
목
차
1. 일반사항 ···························································· 18
3. 시공 ································································ 24
1.1 적용범위 ··················································· 18
3.1 시공조건확인 ··········································· 24
1.1.1 요약 ························································ 18
3.2 시공기준 ··················································· 24
1.1.2 주요내용 ················································ 18
3.2.1 토공 ························································ 24
1.2 참고기준 ··················································· 18
3.2.2 기초 ························································ 25
1.2.1 관련 법규 ·············································· 18
3.2.3 철근가공 및 조립 ································ 26
1.2.2 관련 기준 ·············································· 18
3.2.4 거푸집 공사 ·········································· 27
1.3 용어의 정의 ············································· 19
3.2.5 콘크리트 공사 ······································ 27
1.4 제출물 ······················································· 19
3.2.6 미장 및 방수 ········································ 29
1.4.1 자재 공급원 승인 요청서 ·················· 19
3.2.7 블록쌓기 ················································ 29
1.4.2 시공상세도면 ········································ 19
3.2.8 돌쌓기 ···················································· 30
1.4.3 제품자료 ················································ 19
3.2.9 돌붙이기 ················································ 30
1.4.4 시공계획서 ············································ 20
3.2.10 타일붙이기 ·········································· 31
1.4.5 품질인증서류 ········································ 20
3.3 시공허용오차 ··········································· 31
1.5 공사기록서류 ··········································· 20
3.3.1 측정 ························································ 31
1.6 운반, 보관, 취급 ····································· 20
3.3.2 시공허용차 ············································ 31
1.7 환경요구사항 ··········································· 20
3.4 현장품질관리 ··········································· 31
1.8 현장수량검측 ··········································· 20
3.4.1 품질시험 ················································ 31
3.5 현장 뒷정리 ············································· 32
2. 자재 ···································································· 21
2.1 재료 ··························································· 21
2.1.1 일반사항 ················································ 21
2.1.2 기초용 잡석 ·········································· 21
2.1.3 철근 ························································ 21
2.1.4 콘크리트 재료 ······································ 21
2.1.5 레디믹스트 콘크리트 ·························· 22
2.1.6 현장비빔 콘크리트 ······························ 22
2.1.7 거푸집 ···················································· 22
2.1.8 모르타르 ················································ 23
2.1.9 방수재료 ················································ 23
2.1.10 벽돌 ······················································ 23
2.1.11 자기질 타일 ········································ 23
2.1.12 석재 ······················································ 23
2.1.13 인조암 ·················································· 24
조경시설물공통
1. 일반사항
1.1 적용범위
1.1.1 요약
(1) 이 기준은 조경구조물, 현장제작설치시설, 옥외시설물, 놀이시설, 운동 및 체력단련시설, 수경
시설, 환경조형시설, 조경석 등의 조경시설물공사에 공통적으로 적용한다.
1.1.2 주요내용
(1) 조경시설물공사를 위한 토공, 기초, 철근가공 및 조립, 거푸집공사, 콘크리트 공사, 미장 및 방
수, 블록쌓기, 돌쌓기, 돌붙이기, 타일붙이기
1.2 참고기준
1.2.1 관련 법규
∙ 건설기술진흥법
∙ 조경진흥법
∙ 물환경보전법
1.2.2 관련 기준
∙ KCS 10 10 10 공무행정요건
∙ KCS 11 20 15 터파기
∙ KCS 11 20 25 되메우기 및 뒷채움
∙ KCS 11 20 30 사토 및 잔토처리
∙ KCS 11 50 05 얕은 기초
∙ KCS 14 20 00 콘크리트공사
∙ KCS 14 20 10 일반콘크리트
∙ KCS 14 20 12 거푸집 및 동바리
∙ KCS 34 50 45 조경석
∙ KCS 41 34 02 벽돌공사
∙ KCS 41 34 05 블록쌓기
∙ KCS 41 35 01 석공사 일반
∙ KCS 41 40 01 방수공사 일반
∙ KCS 41 46 01 미장공사 일반
∙ KCS 41 46 02 시멘트 모르타르 바름
∙ KCS 41 46 08 시멘트 모르타르계 방수공사
∙ KCS 41 48 03 테라코타 공사
∙ KCS 41 48 01 타일공사
∙ KS D 3504 철근 콘크리트용 봉강
∙ KS D 3552 철선
18 조경시설물공통
∙ KS L 1001 도자기질 타일
∙ KS L 1592 도자기질 타일시멘트
∙ KS L 1593 도자기질 타일용 접착제
∙ KS L 4201 점토 벽돌
∙ KS L 5201 포틀랜드 시멘트
∙ KS L 5204 백색포틀랜드 시멘트
∙ KS L 5220 건조 시멘트 모르타르
∙ KS F 2312 흙의 다짐 시험 방법
∙ KS F 2405 콘크리트 압축 강도 시험방법
∙ KS F 2519 석재의 압축강도 시험방법
∙ KS F 2527 콘크리트용 골재
∙ KS F 2530 석재
∙ KS F 3110 콘크리트 거푸집용 합판
∙ KS F 4004 콘크리트 벽돌
∙ KS F 4009 레디 믹스트 콘크리트
1.3 용어의 정의
내용 없음
1.4 제출물
1.4.1 자재 공급원 승인 요청서
(1) 자재 공급원 승인 요청서는 KCS 10 10 10(1.8)을 따른다.
1.4.2 시공상세도면
(1) 수급인은 설계도서에 일반적인 표준예시만 제시되어 현장여건에 따라 상세도와 상이한 부분
이 발생하는 구간 또는 시공부분 및 공사감독자가 지정하는 복잡한 조경시설물은 착공 전에 시공
상세도를 작성하여 공사감독자의 확인 후 시공하여야 한다.
① 거푸집의 제작, 조립 시공상세도면
② 철근 가공, 조립 시공상세도면
③ 시공이음 위치도와 시공상세도
1.4.3 제품자료
(1) 공사감독자가 지정하는 자재에 대한 생산자, 생산지, 규격, 특성, 품질확인서, 설치지침서 등의
제품자료를 제출하여야 한다.
① 철근, 강재 등
② 콘크리트 재료, 혼화재료 및 양생재
③ 레디믹스트 콘크리트 : 공장의 제조설비, 제조능력, 생산가능 규격, 현장까지의 운반시간, 배출
19 조경시설물공통 시간, 운반차의 수, 품질관리상태 등
1.4.4 시공계획서
(1) 착공 전에 시공계획서를 작성하여 공사감독자의 승인을 받아야 한다.
1.4.5 품질인증서류
(1) 레디믹스트 콘크리트는 KCS 14 20 10을 따른다.
1.5 공사기록서류
(1) 수급인은 이 공사와 관련된 다음 사항의 확인·검사에 대한 공사감독자의 지시를 이행하여야
한다.
① 콘크리트공사의 공정, 제조 및 시공 상황, 양생방법, 시공한 날의 기후, 기온, 품질관리 및 검사
의 결과 등을 공사 중에 기록하고, 필요한 데이터를 공사기록으로서 보존하여야 한다.
1.6 운반, 보관, 취급
(1) 모든 자재는 운반ㆍ보관 및 취급 중 충격이나 과적재로 인한 변형이나 손상이 발생하지 않아
야 한다.
(2) 당해공사에 사용될 각종 재료는 눈, 비, 시멘트 가루, 각종 오물, 흙 또는 기타 이물질에 오염되
지 않도록 한다.
(3) 외기의 영향(햇볕, 건조, 동결, 비, 습기피해 등)을 받아 녹슬거나 변질 우려가 있는 재료는 바
람이 잘 통하는 창고 또는 덮개시설이 있는 장소에 재료별로 분리하여 보관하여 변질되지 않도록
한다.
(4) 시멘트, 거푸집, 철근, 레디믹스트 콘크리트, 골재 등의 운반, 저장, 취급은 KCS 14 20 00,
KCS 14 20 10, KCS 14 20 11을 따른다.
1.7 환경요구사항
(1) 콘크리트 및 모르타르공사는 일평균기온 4 ℃ 이상에서 시행하여야 한다. 불가피하게 4 ℃ 미
만에서 공사를 수행해야 할 경우에는 공사감독자의 승인을 받아 보온조치를 하여야 한다.
1.8 현장수량검측
(1) 검측 단위는 동, 개소, 조 등으로 한다.
(2) 수량은 설계도서에 의해 설치, 완료된 개수를 의미하며 설치 후 뒷정리까지 끝난 상태를 기준
으로 한다.
20 조경시설물공통
2. 자재
2.1 재료
2.1.1 일반사항
(1) 자재는 한국산업표준(KS)에 적합한 것 또는 동등 이상의 제품으로 한다.
(2) 한국산업표준(KS)에 규정되지 않은 자재는 사용 전 공사감독자의 확인을 받아야 한다.
(3) 모든 재료와 처리과정에서 인체에 유해한 물질이 있어서는 안 된다.
(4) 고정철물이나 연결재 및 덮개는 부식되지 않는 것이거나 부식방지 코팅처리 되어야 하며, 공
구를 사용하지 않고는 풀리거나 빠지지 않아야 한다.
(5) 사용 재료의 치수 및 품질은 설계도서의 지정에 따르며, 별도의 규정이 없을 때 치수는 마감치
수이다.
(6) 기성제품은 공장에서 제작하여 현장에 반입 후 설치한다.
(7) 외국제품시설인 경우 ISO의 규정, 지역표준, 해당국가의 표준에 적합한 것이어야 하며, 한국
산업표준(KS)에 공통된 사항이 있는 경우 이를 준수해야 한다. 단 이러한 기준이 없는 경우에는
제품생산업체의 기준을 따른다.
2.1.2 기초용 잡석
(1) 기초용으로 쓰이는 잡석은 조약돌이나 부순돌로, 설계도서의 규격에 따라 공극없이 잘 다져
질 수 있도록 적당한 입도로 섞인 것이어야 한다.
(2) 쓰레기, 먼지, 유해한 유기물 등을 포함하지 않아야 한다.
(3) 뒷채움용 잡석은 최대치수가 150 mm 인 돌이 적당한 입도로 섞인 것이어야 한다.
2.1.3 철근
(1) 철근의 종류 및 규격은 별도의 지정이 없는 경우 KS D 3504 에 적합한 철근 콘크리트용 이형
봉강(SD300)을 기준으로 한다.
(2) 이음을 위한 결속선은 KS D 3552에 적합한 제품이나 철근용 클립을 사용하여야 한다.
(3) 철근 고임재(bar support) 및 간격재(spacer) 등의 재질은 본체 콘크리트와 동등 이상의 강
도와 품질을 가진 콘크리트 혹은 모르타르, 강재 제품을 사용하여야 한다.
2.1.4 콘크리트 재료
(1) 시멘트
① 시멘트는 KS L 5201 에 의한 한국산업표준(KS)표시품이어야 한다.
② 소량이라도 응고한 시멘트를 사용해서는 안 된다.
(2) 골재
① 골재는 KS F 2527의 규정에 적합하여야 한다.
② 골재는 깨끗하고 강하며 내구성이 좋고 적당한 입도를 갖는 동시에 흙, 먼지, 유기불순물, 염분
등의 유해물질을 함유해서는 안 된다.
21 조경시설물공통
③ 경량골재에 대해서는 공사시방서를 따른다.
④ 위 항목은 천연골재와 재생골재 모두에 대하여 동일하게 적용된다.
(3) 혼화재료
① 콘크리트 및 금속재에 유해한 영향을 미치지 말아야 한다. 또 혼화재료의 종류는 특별히 정하
지 않는 한 공사감독자의 승인을 얻어 정한다.
(4) 물
① 깨끗하고 콘크리트 품질에 영향을 주는 기름, 산, 염류, 유기물 등의 물질을 함유해서는 안 된
다.
2.1.5 레디믹스트 콘크리트
(1) KS F 4009에 적합한 제품이어야 한다.
(2) KS제품인증업체에서 제조된 것을 사용하여야 한다.
(3) 비빔을 개시한 후 외기온도가 25 ℃ 이상일 때 60분 이내에 25 ℃ 이하일 때는 90분 이내에
타설하여야 한다.
2.1.6 현장비빔 콘크리트
(1) 레디믹스트 콘크리트 사용이 곤란한 산간오지 및 도서벽지 및 산재된 소규모의 구조물로서
양이 적고 중요하지 않은 공사에서 설계도서의 규정에 따라 적용한다.
(2) 재료의 계량 전에 표준배합을 현장배합으로 계산하여 공사감독자의 승인을 얻어야 한다.
(3) 기계비빔 시 1 회 비빔의 분량은 믹서의 지정량을 초과하지 않는 양으로 드럼의 비빔 콘크리트
를 전부 제거한 후에 다음 차례의 재료를 투입하여야 한다.
(4) 현장비빔 콘크리트의 굵은골재 최대치수 및 표준중량 배합은 표 2.1-1을 기준으로 한다.
표 2.1-1 현장비빔 콘크리트의 굵은골재 최대치수 및 표준중량 배합
표준중량배합(㎏)
굵은골재
최대치수
자갈 모래 자갈 또는 부순돌 25㎜ 346 828 1,011 40㎜ 323 775 1,101
2.1.7 거푸집
(1) 거푸집은 작업하중, 콘크리트의 자체하중, 측면압력 또는 진동에 견디는 구조로 하고 콘크리
트 치기 후 비틀림 등 변형이 없어야 한다.
(2) 합판 거푸집은 KS F 3110의 규정에 적합한 콘크리트 거푸집용 합판으로 제작되어야 하며 사
용횟수 기준을 준수한다.
(3) 목재 및 합판 거푸집을 재사용할 때에는 깨끗하게 청소한 뒤 콘크리트와 접하는 면에 광유 등
22 조경시설물공통 박리제를 균일하게 도포하여 사용한다.
(4) 강재 거푸집은 제조업자의 설치지침을 따른다.
(5) 거푸집 박리제는 모든 형태의 거푸집에 사용할 수 있는 것으로, 콘크리트의 표면에 얼룩을 만
들거나 나쁜 영향을 주어서는 안 되며, 콘크리트 표면의 접합과 부착을 방해하거나 양생시 수분
의 흡수를 방해하지 않는 것이어야 한다.
2.1.8 모르타르
(1) 포틀랜드 시멘트는 KS L 5201에 따른 1종 보통 포클랜드 시멘트, 백색 포틀랜드 시멘트는 KS
L 5204에 따른 한국산업표준(KS)표시품을 사용하여야 한다.
(2) 모래는 KS F 2527의 잔골재에 적합한 자재이어야 한다.
(3) 공장에서 생산된 건조상태의 시멘트계 모르타르를 사용하는 경우 KS L 5220에 적합한 자재
를 사용하여야 한다.
(4) 모르타르의 용적배합비는 설계에 따르되 별도의 지정이 없는 경우 표 2.1-2의 표준배합을 따
른다.
표 2.1-2 모르타르 용적배합비
(㎥당) 배합용적비 시멘트(㎏) 모래(㎥) 비고 1:1 1093 0.78 치장줄눈용 1:2 680 0.98 붙임용 1:3 510 1.1 바탕 및 고름용
(5) 외기온도가 25 ℃ 이상일 때 60분, 25 ℃ 이하일 때 90분 이상 경과한 모르타르는 사용해서는
안 된다.
2.1.9 방수재료
(1) 방수제는 설계도서에 명시된 방수처리방법에 적합한 자재로 한다.
2.1.10 벽돌
< 해당사항없음>
2.1.11 자기질 타일
< 해당사항없음>
2.1.12 석재
(1) 석재는 KS F 2530의 규정에 적합하여야 한다.
(2) 석재의 규격, 색상 등은 설계도서에 따르되, 색깔, 결무늬, 가공모양, 마무리 정도 및 물리적 성
질이 서로 다른 것을 연접하여 사용하여서는 안 된다.
23 조경시설물공통
(3) 석재의 산지에 대해서는 설계도서에 지시된 곳 이외의 것을 사용할 경우에는 사전에 공사감
독자의 승인을 얻어야 한다.
(4) 부속재료
① 석재의 연결철물, 촉, 꺾쇠 등은 부식되지 않거나 부식방지 코팅처리된 것이어야 한다.
2.1.13. 인조암
< 해당사항없음>
3. 시공
3.1 시공조건확인
(1) 조경시설물공사는 지반다짐이 이루어진 견고한 지반에서 행해져야 하며, 지반이 연약하여 부
등침하가 예상되는 경우에는 말뚝기초나 콘크리트기초로 보강하여야 한다.
3.2 시공기준
3.2.1 토공
(1) 이 기준에서 언급되지 않은 일반적인 사항은 KCS 11 20 15, KCS 11 20 25, KCS 11 20 30 을
따른다.
(2) 터파기
① 터파기의 경계는 조경시설물공사를 위한 거푸집 설치 및 콘크리트면에 대한 벽면 방수 등의 후
속 작업에 적합한 작업공간을 확보할 수 있도록 정하여야 한다.
② 터파기 시 흙이 무너질 우려가 있을 때에는 적절한 비탈을 유지시키거나 흙막이처리를 한다.
③ 파낸 재료는 터파기의 경계로부터 1 m 이상의 거리를 두고 쌓아 두어야 하며, 터파기한 자리
는 밖에서 빗물이 흘러 들어가지 않도록 조치하여야 한다.
④ 터파기한 바닥은 수평을 유지하고 단단해야 한다.
(3) 되메우기
① 터파기한 토사가 되메우기 재료로 적합하지 않은 경우 공사감독자의 승인을 받아 되메우기 재
료를 변경하여야 한다.
② 되메우기시 200 mm 를 기준으로 층다짐을 실시하며, 각 층은 KS F 2312의 A다짐으로 정해지
는 최대 건조밀도의 90% 이상으로 다져야 한다.
③ 방수처리된 구조물 주위에 되메우기 할 때에는 방수구조에 손상이 가지 않도록 필요한 조치를
취해야 한다.
④ 명시된 표고로 전면을 마무리해야 한다.
24 조경시설물공통
3.2.2 기초
(1) 이 기준에서 언급되지 않은 일반적인 사항은 KCS 11 50 05를 따른다.
(2) 원지반다짐
① 터파기한 원지반면은 큰 요철이 없도록 평탄하게 고르고 다짐하여야 하며, 연약지반 또는 용수
가 없는지 확인하여야 한다.
② KS F 2312의 A다짐방법에 의하여 구한 시험실 최대건조밀도의 90% 이상이 되도록 균일하게
다져야 하며, 다짐 시 함수비는 다짐시험에서 구한 함수비 관리범위에서 정하여진 최적함수비의
± 2% 범위 이내로 유지하여야 한다.
(3) 잡석다짐
① 원지반을 견고하게 다진 후 기초용 잡석을 포설하여 원지반과 혼합되지 않도록 하여야 한다.
② 잡석부설시 골재의 분리현상이 발생하지 않도록 유의하여 부설하며, 골재분리가 발생한 구간
은 골재층을 걷어내고 재시공하여야 한다.
③ 잡석의 두께는 설계도서에 따르되, 잡석포설시 한층 두께는 300 ∼400 mm 를 넘지 않도록 하
며, 필요시 층다짐을 실시하여야 한다.
④ 인력잡석다짐은 큰달구다지기 또는 떨공이다지기를 실시하여야 하며, 장비를 이용하는 경우에
는 현장여건에 따라 다짐구간 전체를 다짐할 수 있는 기계를 사용하여야 한다.
⑤ 잡석다짐은 KS F 2312의 B다짐방법에 의하여 구한 시험실 최대건조밀도의 90% 이상이 되도
록 균일하게 다져야 하며, 다짐 시 함수비는 다짐시험에서 구한 함수비 관리범위에서 정하여진
최적함수비의 ± 2% 범위 이내로 유지하여야 한다.
⑥ 상재 하중을 받지 않는 소형 구조물의 잡석지정에 대하여는 공사감독자의 승인을 받아 소형장
비 다짐으로 대체할 수 있다.
(4) 버림 콘크리트
① 버림 콘크리트의 두께는 설계도서에 따르며, 폭은 잡석다짐의 폭과 동일하게 한다.
② 버림 콘크리트는 설계도서에 따라 표면이 평탄하게 시공하여야 한다.
③ 기초저면이 암반일 경우에는 발파 등으로 인해 금이 간 암석부스러기 등은 제거하고, 시공기준
면 보다 더 깊이 터파기한 부분은 버림 콘크리트를 채워서 평탄하게 마무리 하여야 한다.
(5) 기초 콘크리트
① 기초 콘크리트는 수평으로 설치되어야 한다.
② 수평면에 대하여 30° 이상의 각도를 가지는 콘크리트에는 거푸집을 설치하고 되메우기를 하
기 전에 거푸집을 제거하여야 한다.
③ 버림 콘크리트를 치지 않고 잡석다짐 위에 조경구조물의 콘크리트를 타설하는 경우에는 설계
도서의 규격에 따른 폴리에틸렌 필름 깔기를 한다.
25 조경시설물공통
3.2.3 철근가공 및 조립
(1) 이 기준에서 언급되지 않은 일반적인 사항은 KCS 14 20 11을 따른다.
(2) 철근가공
① 철근은 설계도서의 형상 및 규격에 따라 상온에서 가공하되, 재질이 손상되지 않도록 한다.
② 철근 말단부의 갈고리는 구부림각 180°, 구부림각 90°, 구부림각 135°를 사용하고, 갈고리의
구부림 반직경은 철근직경의 2.5배 이상으로 한다.
③ 구부림각 180°의 갈고리는 철근의 말단부를 반원형으로 180° 구부리고 반원형의 끝에서부터
철근의 말단까지는 철근직경의 4배 이상으로 최소한 60 mm 이상의 직선부가 되도록 가공한다.
④ 구부림각 90°의 갈고리는 철근의 말단부를 90° 구부리고 철근 말단까지의 직선부가 철근 직경
의 12배 이상이 되도록 가공한다.
⑤ 구부림각 135°의 갈고리는 철근의 말단부를 135° 구부리고 철근 말단까지의 직선부가 철근
직경의 6배 이상으로 최소 60 mm 이상이 되도록 가공한다.
(3) 철근조립
① 철근을 조립하기 전에 녹이나 먼지, 기름, 기타 콘크리트의 부착력을 감소시킬 위험이 있는 것
을 제거하여야 한다.
② 철근을 정확한 위치에 배근시키고, 콘크리트 치기에 의한 이동이 없도록 견고하게 조립하여야
한다.
③ 각 교차점은 결속선으로 2 회 감기하고, 이음부는 2개소 이상을 2조 감기로 결속하여야 한다.
④ 철근의 피복두께를 확보하기 위하여 간격재를 배치하여야 한다.
⑤ 철근의 조립이 종료된 경우에는 공사감독자의 검사를 받은 후 다음 공종을 진행한다.
⑥ 철근조립후 콘크리트 칠 때까지 긴 시간이 경과한 경우에는 콘크리트를 치기 전에 재검사를 받
고 철근을 깨끗이 청소하여야 한다.
(4) 철근이음
① 철근의 이음은 가능한 한 피하도록 하되 이음매의 설치가 불가피한 경우 이음위치는 인장응력
을 크게 받는 곳을 피하고, 동일위치에 이음자리가 집중되지 않도록 해야 한다.
② 이음길이는 철근직경의 20배 이상으로 하고 결속선으로 여러 개소 결속한다.
③ 이음위치는 철근의 이음길이에 철근직경의 25배를 더한 길이 이상 인접한 철근의 이음과 서로
어긋나게 배치한다.
(5) 철근의 피복두께
① 철근의 피복두께란 콘크리트 표면으로부터 철근까지의 최단거리이며, 설계도서상의 콘크리트
표면으로부터 철근의 중심까지의 거리와는 다르다.
② 철근의 피복두께는 설계도서에 따르되, 따로 명시되지 않은 경우에는 표 3.2-1 을 기준으로 한
다.
26 조경시설물공통 표 3.2-1 철근의 피복두께
(단위 : mm)
구분
피복두께 수중에 위치하는 콘크리트 100
흙에 접하여 콘크리트를 친 후 영구히 흙에 묻혀 있는 콘크리트
80
흙에 접하거나 옥외의 공기에 직
접 노출되는 콘크리트
- D29 이상 60 - D25 이하 50
- D16 이하의 철근, 지름 16 mm 이하의 철선
40
3.2.4 거푸집 공사
(1) 이 기준에서 언급되지 않은 일반적인 사항은 KCS 14 20 12를 따른다.
(2) 거푸집은 콘크리트 부재의 위치, 형상 및 치수를 확보하고, 구조물의 품질을 확보할 수 있는
콘크리트가 되도록 시공하여야 한다.
(3) 거푸집은 용이하고 안전하게 설치, 철거가 가능하여야 하며 연결부위의 접합이 좋고, 모르타
르가 새어 나오지 않도록 밀실하게 시공하여야 한다.
(4) 거푸집의 구석에는 모따기재를 붙이고, 거푸집의 내면에는 박리제를 도포해야 한다.
(5) 거푸집을 재사용할 때에는 콘크리트와 접하는 면을 청소하여 사용한다. 이 때, 거푸집의 면이
손상되지 않도록 하여야 한다.
(6) 거푸집은 조립을 완료한 뒤 공사감독자의 검사를 받은 후 다음 공정을 진행한다.
(7) 거푸집은 콘크리트가 자중 및 시공 중에 가해지는 하중에 견딜 만한 강도를 가진 후 제거한다.
(8) 거푸집은 비교적 하중을 적게 받는 부분을 먼저 제거한 다음 나머지 중요한 부분을 제거한다.
(9) 거푸집을 떼어낼 때에는 콘크리트에 충격이나 진동을 주지 않도록 하고, 불완전한 표면은 깨
끗이 마무리하여야 한다.
(10) 동바리, 거푸집의 조립, 존치기간은 KCS 14 20 12를 따른다.
3.2.5 콘크리트 공사
(1) 이 기준에서 언급되지 않은 일반적인 사항은 KCS 14 20 10을 따른다.
(2) 콘크리트 비비기
① 인력으로 콘크리트를 비빌 때에는 마른비빔, 물비빔으로 각각 4회 이상 비빔하여 반죽된 콘크
리트가 균질하여야 한다.
(3) 콘크리트 치기
① 콘크리트를 치기 전 24시간 이내에 콘크리트 반입 및 치기일정을 공사감독자에게 통지하여야
한다.
② 콘크리트가 타설되는 부분의 물은 콘크리트를 치기 전에 제거하여야 한다.
③ 콘크리트의 소운반과 치는 동안에 재료의 분리와 손실이 일어나지 않도록 해야 한다.
④ 특별한 사정으로 즉시 콘크리트를 칠 수 없는 경우, 비비기로부터 치기를 마칠 때까지의 시간
27 조경시설물공통
은 외기온도 25 ℃ 이상의 경우 1.5시간, 25 ℃ 이하일 경우 2시간을 초과하지 않도록 한다.
⑤ 일평균기온이 4 ℃ 이하로 예정된 시기에는 콘크리트의 시공에 대하여 적절한 보온조치를 한
다.
⑥ 한 구획 안에서는 연속해서 치기하여 완료하여야 하며, 부득이 한 경우 시공줄눈부위에서 마감
하여야 한다.
⑦ 콘크리트를 칠 때 철근, 인서트, 기타 매설물이 이동되지 않도록 주의한다.
⑧ 펌핑으로 콘크리트를 치고자 할 때에는 공사감독자의 승인을 얻어야 한다.
⑨ 펌핑 호스의 단부에서 나오는 콘크리트는 1.5 m 이내의 자유낙하고를 갖게 해야 한다.
(4) 콘크리트 다지기
① 콘크리트는 치기 중에 충분히 다져야 한다.
② 구조물의 기초와 두께가 얇은 구조물은 망치 등으로 거푸집에 가벼운 진동을 주거나 내부진동
기를 이용하여 다짐 한다.
③ 진동기는 콘크리트를 친 전면적에서 일정한 간격으로 수직하게 찔러 넣었다가 뽑아내어야 하
며, 찔러 넣기의 간격은 찔러 넣기 영향권이 겹칠 수 있어야 한다.
④ 진동기가 거푸집에 닿지 않게 하면서 거푸집 표면에 가깝게 찔러 넣는다.
(5) 시공이음
① 따로 명시되지 않은 경우, 벽과 슬래브에 있는 시공이음과 벽과 기초 사이에 있는 시공이음에
깊이 40 mm 이상의 키홈을 두어야 한다.
② 시공이음매는 주철근에 직각이 되도록 두고, 철근은 시공이음을 가로질러 연속되어야 한다.
③ 콘크리트의 치기, 다지기, 양생 중에 이음매의 위치를 단단하게 유지할 수 있도록 이음매의 거
푸집을 잘 지지해야 한다.
④ 시공이음에서는 콘크리트의 표면을 깨끗하게 청소하고, 다음 층의 콘크리트를 치기 전에 레이
턴스를 제거하여야 한다.
⑤ 수축에 대한 시간적 여유를 주기 위해서는 12시간 내에는 시공이음과 연결되는 쪽에 콘크리트
를 쳐서는 안 된다.
⑥ 지수판은 설계도서에 명시된 시공이음에 두어야 한다.
⑦ 계약도서에 명시되지 않은 시공이음은 공사감독자의 사전승인을 받아야 한다.
(6) 양생 및 보호
① 콘크리트를 친 직후 직사광선이나 폭우, 바람, 건조 등을 피하기 위해 콘크리트 노출면을 거적
또는 양생시트 등으로 덮어서 양생 및 보호하여야 한다.
② 콘크리트의 양생기간은 KCS 14 20 10(3.4) 기준을 따른다.
③ 거푸집은 해체될 때까지 젖고 서늘하게 유지되어야 한다.
④ 콘크리트는 양생기간 중 무거운 하중, 충격, 진동 등을 받지 않도록 해야 한다.
⑤ 거푸집을 해체한 후에도 양생기간 동안은 콘크리트의 표면이 습윤한 상태를 유지하도록 하여
28 조경시설물공통
야 한다.
⑥ 콘크리트가 양생된 뒤 구체에 불순물이나 흙이 묻어 있을 경우 물로 깨끗이 닦아내고 물이 고
이지 않도록 평탄하게 미장마감하고 모따기 한 뒤에 보호‧양생하여야 한다.
3.2.6 미장 및 방수
(1) 이 기준에서 언급되지 않은 일반적인 사항은 KCS 41 41 01, KCS 41 46 01의 관련항목을 따
른다.
(2) 모르타르 마감
① 모르타르는 설계도서에 명시된 일정 용적배합비로 배합하여 흙손으로 깔 수 있는 반죽질기를
얻을 수 있도록 고르게 비벼야 한다.
② 바탕면을 깨끗이 청소하고, 설계도서에 명시된 두께로 균일하게 바른다.
③ 콘크리트 바탕면이 심하게 건조하였을 때에는 작업 착수전에 물을 축여 바탕면을 충분히 습윤
하게 한 다음 미장한다.
(3) 방수처리
① 바탕면에 부착된 이물질을 제거하고, 물씻기 등의 방법으로 완전히 청소하여 건조시킨 후 방수
처리 한다.
② 방수처리방법은 설계도서를 따른다.
3.2.7 블록쌓기
(1) 시멘트블록쌓기
① 작업을 시작하기 전에 기초 등의 상단을 청소하고 파손을 점검한 후에 줄눈 접착면 및 콘크리
트면에 적당히 물축임을 한다.
② 모르타르는 사전에 가반죽하여 놓고 사용에 알맞게 가수하여 반죽하고 가수한 후 될 수 있는
대로 빨리 사용하되 응결을 시작한 것은 사용하지 말아야 한다.
③ 세로기준틀은 먼저 좌우의 모서리를 정확하게 쌓고, 이것을 기준으로 수평실을 치고 수평수직
에 한단씩 블록의 살두께가 큰 편을 위로하여 쌓아간다.
④ 쌓기 모르타르는 접합면 전체에 발라 줄눈을 일정하게 맞추어 바르게 대어 쌓고, 1일의 쌓기
높이는 1.6 m 이하를 기준으로 한다.
⑤ 줄눈 모르타르의 경화에 앞서 줄눈누르기와 줄눈파기를 한다. 치장줄눈의 경우에는 흙손을 사
용하여 빈틈이 발생하지 않도록 줄눈누르기를 하여 마무리한다.
(2) 벽돌쌓기
① 벽돌에 부착된 불순물은 제거하고 사전에 물축이기를 한다.
② 착수 전에 벽돌 나누기를 하고 세로줄눈은 특별히 정한 바가 없는 한 통줄눈이 되지 않도록 쌓
기 한다.
③ 줄눈 모르타르(1 :2)는 접합면의 전체에 고루 배분되도록 하고 줄눈폭은 특별히 정하지 않는
29 조경시설물공통
경우에는 10 mm 로 한다.
④ 벽돌쌓기가 끝나면 곧바로 줄눈용 시멘트로 줄눈 메우기하고 청소한다.
⑤ 1일쌓기 높이는 1.2 m 를 표준으로 하고 최대 1.5 m 이내로 하며, 이어쌓기 부분은 계단형으로
마감한다.
(3) 조립식 식생블록쌓기
① 블록 높이의 1/2만큼 터파기하고, 잡석을 채워 다짐을 한 뒤에 설계도서에 명시된 기울기로 쌓
는다.
② 뒷채움을 할 경우 매 단높이마다 뒷채움을 하고, 소형 평면진동기로 블록쌓기면에 평행이 되게
다짐을 실시한다.
③ 블록 안에는 수목생육에 적합한 사질 양토를 채우고 쌓기와 동시에 수목을 식재한다.
④ 쌓기가 진행됨에 따라 기울기를 확인하여 변형이 일어났을 경우에는 즉시 쌓기를 중단하고 재
시공하여야 한다.
3.2.8 돌쌓기
< 해당사항없음>
3.2.9 돌붙이기
(1) 조약돌 및 야면석 붙이기
① 조약돌 및 야면석은 각각 균일한 크기의 돌을 사용하여 설계도서의 간격에 따라 맞추어 붙인
다.
② 돌붙이기에 사용하는 뒷채움 모르타르, 줄눈 모르타르는 빈틈이 없도록 유의하여 채운다.
(2) 판석붙이기
① 판석붙임은 설계도서에 기준하여 돌나누기, 설치공작도를 작성 제출하여 공사감독자의 승인을
얻은 후 가공·설치·시공한다.
② 판석 표면 가공은 KCS 41 35 01을 따른다.
③ 외벽습식공법
가. 바탕면과 석재와의 이격거리는 40 mm 를 표준으로 한다.
나. 상단의 석재설치는 하단의 석재에 충격을 주지 않도록 하고, 하단 석재와의 사이에 판상의 쐐
기를 끼우고 연결철물이나 훅, 꺽쇠를 사용하여 턱지지 않게 고정하고 사춤 모르타르로 채운다.
다. 사춤모르타르를 채우기 전에 모르타르가 흘러나오지 못하도록 줄눈에 발포플라스틱제 등으
로 막는다.
라. 사춤모르타르를 채울 때에는 모르타르의 압력으로 석재가 밀려나지 않도록 여러번에 나누어
채운다.
마. 줄눈모르타르를 사용할 경우 속빔이 없도록 충분히 눌러 채우고 소정의 형상으로 줄바르게
바른다.
30 조경시설물공통
바. 치장줄눈은 석재면의 물씻기를 한 뒤에 하고, 치장줄눈용 모르타르로 평활하게 마무리한다.
④ 외벽건식공법
가. 수평줄을 쳐서 연결철물의 정착을 위한 앵커용 구멍을 뚫되, 설치할 때의 조정과 중간변위를
고려하여 앵글형의 1 차 연결철물과 평판형의 2 차 연결철물을 연결하는 구멍을 여유있게 뚫는다.
나. 외벽면이 평탄하도록 연결철물의 이격거리를 조정하여 단단히 조이고, 나사의 풀림을 방지하
기 위하여 에폭시 등의 고정재를 바른다.
다. 판석재와 강재가 직접 접촉하는 부분에는 완충재를 끼운다.
라. 줄눈의 폭은 연결철물의 두께와 같아야 하며, 실링재로 채워 마감한다.
(3) 인조석 붙이기
① 인조석 붙이기는 타일압착붙이기에 준하여 시공한다.
② 벽면에 압착용 타일시멘트 모르타르를 10 mm 이상 두껍게 바르고, 인조석을 상하로 움직이
면서 측면에 모르타르가 어느 정도 묻어 나오게 단단히 밀어서 붙인다.
3.2.10 타일붙이기
< 해당사항없음>
3.3 시공허용오차
3.3.1 측정
(1) 기초공사는 독립된 구간의 거푸집 제거와 콘크리트 양생 및 되메우기가 끝나고 기초 위에 구
조물의 설치가 가능하다고 공사감독자의 승인을 받았을 때를 기준으로 한다.
(2) 콘크리트 공사는 독립된 구간의 거푸집 제거와 콘크리트 양생이 끝나고 후속공사에 지장이
없다고 공사감독자의 승인을 받았을 때를 기준으로 한다.
3.3.2 시공허용차
(1) 콘크리트의 부재 두께 오차 : -6 mm~ +13 mm
(2) 기초
① 평면치수의 변동 : -13 mm~+50 mm
② 위치오차 : 잘못 놓인 방향의 기초폭의 2% 이하 또는 50 mm 이하
③ 두께 : 명시된 두께의 ±5% 이내
④ 압축강도 : 설계강도의 -3% 이내
3.4 현장품질관리
3.4.1 품질시험
(1) 품질시험 및 검사는 조경진흥법 및 건설기술진흥법과 이 기준의 해당 항목을 따른다.
① 경화된 콘크리트: 배합이 달라질 때 또는 150 ㎥마다 KS F 2405(콘크리트의 압축강도 시험방
31 조경시설물공통
법)에 의한 압축강도시험
② 석재: 재질변화 시마다 KS F 2519(석재의 압축강도 시험방법)에 의한 압축강도시험
3.5 현장 뒷정리
(1) 공사가 완료되면 주변을 깨끗이 청소하고 남은 잔재와 쓰레기는 건설폐기물 처리 규정에 따
라 현장 외로 반출⋅처리하여야 한다.
32
KCS 34 50 10 조경구조물
목
차
1. 일반사항 ·····················································································································································
1.1 적용범위 ·············································································································································
1.1.1 요약 ··················································································································································
1.1.2 주요내용 ··········································································································································
1.2 참고기준 ·············································································································································
1.2.1 관련 법규 ········································································································································
1.2.2 관련 기준 ········································································································································
1.3 용어의 정의 ·······································································································································
1.4 시스템 설명 ·······································································································································
1.5 제출물 ·················································································································································
1.5.1 자재 공급원 승인 요청서 ············································································································
1.5.2 시공상세도면 ··································································································································
1.5.3 제품자료 ··········································································································································
1.5.4 시공계획서 ······································································································································
1.5.5 품질인증서류 ··································································································································
1.6 공사기록서류 ·····································································································································
1.7 운반, 보관, 취급 ·······························································································································
1.8 환경요구사항 ·····································································································································
1.9 현장수량검측 ·····································································································································
2. 자재 ·····························································································································································
2.1 재료 ·····················································································································································
2.1.1 일반사항 ··········································································································································
2.1.2 강재 ··················································································································································
3. 시공 ·····························································································································································
3.1 시공조건확인 ·····································································································································
3.2 시공기준 ·············································································································································
3.2.1 토공 및 기초 ··································································································································
3.2.2 석축 ··················································································································································
3.2.3 소옹벽 ··············································································································································
3.2.4 식생옹벽 ··········································································································································
3.2.5 장식벽 ··············································································································································
3.2.6 담장 및 난간 ··································································································································
3.2.7 문주 ··················································································································································
3.2.8 계단 및 경사로 ······························································································································
3.2.9 야외무대 및 스탠드 ······················································································································
3.2.10 전망대 ···········································································································································
3.2.11 보도교 ···········································································································································
3.2.12 퍼걸러, 셀터, 정자 ······················································································································
3.2.13 목재 데크 ·····································································································································
3.3 현장품질관리 ·····································································································································
3.3.1 품질시험 ··········································································································································
3.4 현장 뒷정리 ·······································································································································
33
33
33
33
33
33
33
33
34
34
34
34
34
34
34
35
35
35
35
35
35
35
35
35
35
35
35
36
36
36
36
36
36
36
37
37
37
37
38
38
38
38
조경구조물
1. 일반사항
1.1 적용범위
1.1.1 요약
(1) 이 기준은 석축, 장식벽, 야외공연장, 전망대, 보도교 등의 조경구조물에 적용한다.
1.1.2 주요내용
(1) 석축, 소옹벽, 식생옹벽, 장식벽, 담장 및 난간, 문주, 계단 및 경사로, 야외무대 및 스탠드, 전망
대, 보도교, 퍼걸러, 셸터, 정자, 목재데크
1.2 참고 기준
1.2.1 관련 법규
∙ 건설기술진흥법
∙ 장애인⋅노인⋅임산부 등의 편의증진보장에 관한 법률
∙ 조경진흥법
∙ 주택건설기준 등에 관한 규정
1.2.2 관련 기준
∙ KCS 10 10 10 공무행정요건
∙ KCS 34 50 05 조경시설물공통
∙ KCS 34 50 15 현장제작설치시설
∙ KS D 3501 열간 압연 연강판 및 강대
∙ KS D 3503 일반 구조용 압연 강재
∙ KS D 3507 배관용 탄소 강관
∙ KS D 3512 냉간 압연 강판 및 강대
∙ KS D 3515 용접 구조용 압연 강재
∙ KS D 3536 기계 구조용 스테인리스강 강관
∙ KS D 3566 일반 구조용 탄소 강관
∙ KS D 3568 일반 구조용 각형 강관
∙ KS D 3595 일반 배관용 스테인리스 강관
∙ KS D 3698 냉간 압연 스테인리스 강판 및 강대
∙ KS D 3706 스테인리스 강봉
∙ KS D 5201 구리 및 구리합금 판 및 띠
∙ KS D 6701 알루미늄 및 알루미늄 합금의 판 및 띠
∙ KS D 6759 알루미늄 및 알루미늄합금 압출형재
1.3 용어의 정의
내용 없음
33 조경구조물
1.4 시스템 설명
(1) 석축, 옹벽, 장식벽, 보도교 등 주요구조물은 현장조건에 따른 구조검토를 하여 안정성을 검증
하여야 한다.
(2) 옥외계단 및 경사로는 주택건설기준 등에 관한 규정, 장애인⋅노인⋅임산부 등의 편의증진보
장에 관한 법률에 적합하여야 한다.
1.5 제출물
1.5.1 제출물 일반
(1) 수급인은 다음의 자료 등을 공사감독자에게 KCS 10 10 10에 따라 제출하여야 한다. (단, 특
별히 명시하지 않은 경우의 제출 시기는 해당 공사 착공 전으로 한다.)
1.5.2 시공상세도면
(1) 수급인은 주요 구조물의 설계도서와 현장여건이 상이한 부분 또는 공사감독자가 지정하는 복
잡한 조경구조물은 착공 전에 시공상세도를 작성하여 공사감독자의 확인 후 시공하여야 한다.
① 주요 구조물의 거푸집의 제작, 조립 시공상세도면
② 주요 구조물의 철근 가공, 조립 시공상세도면
③ 주요 구조물의 시공이음 위치도와 시공상세도
1.5.3 제품자료
(1) 공사감독자가 지정하는 자재에 대한 생산자, 생산지, 규격, 특성, 품질확인서, 설치지침서 등의
제품자료를 제출하여야 한다.
① 강재 등
(2) 재료 및 마감일람표를 작성하여 해당공사 착공 전에 공사감독자의 승인을 받아서 시공한다.
(3) 제품에 도입되는 색상(또는 공사시방서에 정의된 주문 색상) 견본을 제출하여 승인을 받아야
한다.
1.5.4 시공계획서
(1) 착공 전에 시공계획서를 작성하여 공사감독자의 승인을 받아야 한다.
1.5.5 품질인증서류
(1) 규정에 명시된 항목에 대하여는 품질검사 결과 보고서를 제출하여야 한다.
① 품질시험 및 검사 결과 보고서
② 구조물 관련 시험, 검사, 확인보고서
③ 구조검토서
34 조경구조물
1.6 공사기록서류
(1) 수급인은 이 공사와 관련된 다음 사항의 확인⋅검사에 대한 공사감독자의 지시를 이행하여야
한다.
① 콘크리트공사의 공정, 제조 및 시공 상황, 양생방법, 시공한 날의 기후, 기온, 품질관리 및 검사
의 결과 등을 공사 중에 기록하고, 필요한 데이터를 공사기록으로서 보존하여야 한다.
1.7 운반, 보관, 취급
(1) KCS 34 50 05(1.6)을 따른다.
1.8 환경요구사항
(1) 조경구조물공사는 지반 다짐이 이루어진 견고한 지반에서 행해져야 한다.
(2) 지반이 연약하여 부등침하가 예상되는 경우에는 보강공사를 검토하여야 한다.
1.9 현장수량검측
(1) 검측 단위는 동, 개소, 조 등으로 한다.
(2) 수량은 설계도서에 의해 설치, 완료된 개수를 의미하며 설치 후 뒷정리까지 끝난 상태를 기준
으로 한다.
2. 자재
2.1 재료
2.1.1 일반사항
(1) KCS 34 50 05(2.1.1)을 따른다.
2.1.2 강재
(1) 설계도서에 제시된 형상, 규격, 품질을 갖고 있는 것으로 유해한 산, 녹에 의한 변질이 없는 것
을 사용하여야 한다.
(2) KS D 3501, KS D 3503, KS D 3507, KS D 3512, KS D 3515, KS D 3536, KS D 3566, KS
D 3568, KS D 3595, KS D 3698, KS D 3706, KS D 5201, KS D 6701, KS D 6759에 적합하거
나 동등 이상의 품질을 갖고 있는 자재를 사용하여야 한다.
3. 시공
3.1 시공조건확인
(1) KCS 34 50 05(3.1)을 따른다.
3.2 시공기준
3.2.1 토공 및 기초
(1) KCS 34 50 05(3.2.1), KCS 34 50 05(3.2.2)를 따른다.
35 조경구조물
3.2.2 석축
< 해당사항없음>
3.2.3 소옹벽
< 해당사항없음>
3.2.4 식생옹벽
< 해당사항없음>
3.2.5 장식벽
< 해당사항없음>
3.2.6 담장 및 난간
< 해당사항없음>
3.2.7 문주
< 해당사항없음>
3.2.8 계단 및 경사로
(1) 계단 및 경사로의 규격, 재료, 경사 등은 설계도서에 맞게 설치하여야 한다.
(2) 공사시행에 앞서 연결되는 곳의 최종 마감높이를 확인하고 그 결과에 따라 폭과 계단의 높이,
너비, 계단참의 위치와 너비 등을 조정하여야 한다.
(3) 계단 및 경사로의 규격은 관련 법규에 적합하여야 하며, 이때 단 높이(R)와 너비(T)는
2R+T=60~65 cm 를 유지하되, 전 구간에 걸쳐 동일하여야 하고, 미끄러지지 않도록 표면 처리
하여야 한다. 단, 현장여건 상 위 동일한 규격의 적용이 어려운 경우에는 공사감독자와 협의하여
조정할 수 있다.
(4) 침하가 발생되지 않도록 터파기 후 철저히 다져야 하며, 철근을 배근할 경우 반드시 50 mm
이상 띄워 본체와 일체가 되도록 하여야 한다.
(5) 자연경관지역에 목재를 사용하여 계단 및 경사로를 설치할 경우에는 답압에 의한 목재의 유
격이 생기지 않게 시공해야 한다.
(6) 콘크리트계단
① 지면에서 0.05 m 이상 이격하여 철근을 배근하고 콘크리트를 친 뒤에 최소 5일간 습윤상태를
유지하여야 한다.
② 거푸집은 계단의 최종 마감치수를 감안하여 설치하고 날개벽과 계단은 일체시공이 되도록 해
야 한다.
③ 콘크리트는 계단하부에서 상부방향으로 연속해서 치고 재료분리가 일어나지 않도록 잘 다져
야 한다.
36 조경구조물
④ 콘크리트가 양생된 뒤 구체에 불순물이나 흙이 묻어 있을 경우 물로 깨끗이 닦아내고 물이 고
이지 않도록 평탄하게 미장마감하고 모따기 한 뒤에 보호⋅양생하여야 한다.
⑤ 미장을 할 경우에는 콘크리트 구조체에 붙은 유기불순물, 흙 등을 깨끗이 닦아낸 후 착수하여
야 하며 각단에 물이 고이지 않도록 평탄하게 하여야 한다.
⑥ 계단 상⋅하부에 측구, 도수로, 집수거, 집수정, 맨홀 등의 배수구조물을 적절히 설치하여 시공
하여야 한다.
(7) 화강석 계단
< 해당사항없음>
(8) 경사로
① 경사로가 긴 경우에는 이음줄눈을 설치하여 부등침하가 생기지 않도록 해야 한다.
② 장애인용 경사로를 설치할 경우의 표면처리는 미끄러지지 않게 소정의 마찰력을 지니도록 해
야 한다.
③ 미장을 할 경우에는 콘크리트 구조체에 묻은 유기불순물이나 흙 등을 제거하여야 한다.
3.2.9 야외무대 및 스탠드
< 해당사항없음>
3.2.10 전망대
< 해당사항없음>
3.2.11 보도교
(1) 보도교의 재료 및 규격, 형상은 설계도서에 따르고 관련 재료 및 시공 항목을 적용한다.
(2) 보도교는 안전을 고려하여 난간 설치를 검토하여야 하며, 높이가 2 m 이상인 경우는 설치하
여야 한다.
(3) 기울기가 있는 보도교의 경우 종단 기울기가 8% 를 넘지 않도록 하며 미끄럼을 방지하기 위해
바닥을 거칠게 표면처리 하여야 한다.
(4)목교는 KCS 34 50 15(3.1.2)를 따른다.
3.2.12 퍼걸러, 셸터, 정자
(1) 지표면과 접하는 기둥부위는 방부처리 이외에 추가적인 보호조치를 시행한다.
(2) 정확한 균형을 이루며 종횡부재는 정확하게 조립되어 유동이 없도록 한다.
(3) 횡단 부재는 시공 전에 수평규준틀을 설치하여 각각의 위치에서 수평을 유지하도록 한다.
(4) 기둥은 규준틀을 설치하여 정확하게 수직을 이루도록 한다.
(5) 지붕의 경사각 또는 평면이 전체적으로 일정하게 이루어져야 한다.
(6) 철재기둥일 경우 공법은 철재공사의 관련규정을 적용한다.
37 조경구조물
(7) 목재시설인 경우 공법은 목재공사의 관련규정을 적용한다.
(8) 목재시설의 부재연결은 볼트나 쐐기를 이용하여 연결하고, 철재시설은 용접 등 설계도서에
따라 연결하여야 한다.
(9) 사각 및 연결형 퍼걸러의 지주 파이프 상부의 휨곡률은 일정해야 하며, 지주파이프 중간부 이
하의 맞대임 부분은 적어도 3개소 이상에 용접을 하여야 한다.
(10) 지주파이프는 인접 지주와 평행하여야 하며, 각각 동일 연직면에 있어야 한다.
(11) 직각 연결형 퍼걸러의 지붕연결부분은 45° 대각선상에 있어야 한다.
(12) 지붕 목재 서까래의 연결부는 반턱이음으로 하되, 볼트구멍을 뚫을 때 목재에 파손이 생기지
않도록 한다.
(13) 지붕의 차양재료로 쓰는 대나무발 또는 갈대발은 치밀하게 엮은 것을 사용하고, 대나무 졸대
는 못을 박거나 PVC코팅선 등을 이용하여 지붕목재에 고정시켜야 한다.
(14) 아스팔트 싱글은 세로선과 가로선이 일직선상이 되도록 시공해야 한다.
(15) 물끊기판 설치는 처마와 평행하게 설치하며, 겹침 부위는 실링제로 틈새가 없도록 접착한다.
(16) 목재를 잇대어 사용할시 외력에 의한 파손이 일어나지 않도록 고려하여 설치하되 이음부 주
위를 철판으로 달아주도록 한다.
(17) 목재 기둥 상부 부재는 동일간격으로 균일하게 설치하여야 한다.
(18) 원형 퍼걸러의 경우 전체적으로 형태가 원형이 되도록 주의하며, 각 목재의 연결을 자연스럽
게 고정시키고 전체적으로 모난 부분이 없어야 한다.
(19) 바닥면은 물고임이 생기지 않도록 일정한 경사를 유지하여야 한다.
(20) 전통형 정자는 설계도서에 있는 구조 및 형태, 비례, 마감 상세가 전통적 양식에 적합한지를
시공 전에 확인하여야 하며 전문기술인력이 시공하여야 한다.
3.2.13 목재 데크
< 해당사항없음>
3.3 현장품질관리
3.3.1 품질시험
(1) 품질시험 및 검사는 조경진흥법 및 건설기술진흥법과 이 기준의 해당 항목을 따른다.
3.4 현장 뒷정리
(1) 구조물공사가 완료되면 주변을 깨끗이 청소하고 남은 잔재와 쓰레기는 건설폐기물 처리 규정
에 따라 현장 외로 반출⋅처리하여야 한다.
38
KCS 34 50 15 현장제작설치 시설
목
차
1. 일반사항 ····················································································································································· 39
1.1 적용범위 ············································································································································· 39
1.1.1 요약 ·················································································································································· 39
1.1.2 주요내용 ·········································································································································· 39
1.2 참고기준 ············································································································································· 39
1.2.1 관련 법규 ········································································································································ 39
1.2.2 관련 기준 ········································································································································ 39
1.3 용어의 정의 ······································································································································· 39
1.4 시스템 설명 ······································································································································· 40
1.5 제출물 ··················································································································································· 40
1.5.1 자재 공급원 승인 요청서 ············································································································ 40
1.5.2 시공상세도면 ·································································································································· 40
1.5.3 제품자료 ·········································································································································· 40
1.5.4 시공계획서 ······································································································································ 40
1.5.5 견본 ·················································································································································· 41
1.5.6 품질인증서류 ·································································································································· 41
1.6 공사기록서류 ····································································································································· 41
1.7 운반, 보관, 취급 ······························································································································· 41
1.7.1 일반사항 ·········································································································································· 41
1.7.2 아스팔트 싱글 ································································································································ 41
1.7.3 목재 ·················································································································································· 41
1.7.4 도장재 ·············································································································································· 42
1.8 현장수량검측 ····································································································································· 42
2. 자재 ····························································································································································· 42
2.1 재료 ····················································································································································· 42
2.1.1 일반사항 ·········································································································································· 42
2.1.2 목재 ·················································································································································· 42
2.1.3 철강재 ·············································································································································· 43
2.1.4 합성수지 ·········································································································································· 44
2.1.5 도장재 ·············································································································································· 44
2.1.6 기타 재료 ········································································································································ 44
2.2 조립 ····················································································································································· 44
3. 시공 ······························································································································································· 44
3.1 시공기준 ··············································································································································· 44
3.1 토공 및 기초 ····································································································································· 44
3.1.2 목재시설 ·········································································································································· 45
3.1.3 철강재 시설 ···································································································································· 47
3.1.4 합성수지시설 제작설치 ················································································································ 52
3.1.5 조립형 시설물 제작설치 ·············································································································· 52
3.2 시공허용오차 ····································································································································· 52
3.3 현장품질관리 ····································································································································· 52
3.3.1 품질시험 ·········································································································································· 52
현장제작설치 시설
1. 일반사항
1.1 적용범위
1.1.1 요약
(1) 이 기준은 목재, 철강재, 합성수지재 등을 이용하여 현장에 제작 설치하는 조경시설물에 적용
한다.
1.1.2 주요내용
(1) 목재시설, 철강재시설, 합성수지시설, 조립형 시설, 타이어 시설물
1.2 참고 기준
1.2.1 관련 법규
∙ 건설기술진흥법
∙ 조경진흥법
∙ 목재의방부방충처리기준(국립산림과학원 고시)
∙ 원목규격(국립산림과학원 고시)
∙ 제재규격(국립산림과학원 고시)
∙ 목재제품의 규격과 품질기준(국립산림과학원 고시)
1.2.2 관련 기준
∙ KCS 10 10 10 공무행정요건
∙ KCS 34 50 05 조경시설물공통
∙ KCS 34 50 45 조경석
∙ KS B 1002 6각볼트
∙ KS D 3501 열간 압연 연강판 및 강대
∙ KS D 3503 일반 구조용 압연 강재
∙ KS D 3507 배관용 탄소 강관
∙ KS D 3536 기계 구조용 스테인리스강 강관
∙ KS D 3568 일반 구조용 각형 강관
∙ KS F 1519 목재의 제재 치수
∙ KS F 2219 목재의 가압식 방부 처리 방법
∙ KS F 3101 보통합판
∙ KS F 4514 목구조용 철물
∙ KS M 3811 일반용 메타크릴 수지판
1.3 용어의 정의
내용 없음
39 현장제작설치 시설
1.4 시스템 설명
(1) 조경시설물에 사용되는 목재는 설치되는 공간 및 조건에 따른 목재의 사용환경범주에서 설계
기능을 유지할 수 있는 목재가 사용되어야 하며, 필요시 목재의 방부⋅방충처리 기준에 따라 방부
⋅방충처리 및 표면보호 조치된 목재를 사용하여야 한다.
(2) 목부 도장재는 일반적으로 목재의 불균일한 재질과 수분의 침투에 의한 신축에 저항성과 내
구성이 있는 것으로서 목재 특유의 나뭇결을 살릴 수 있는 투명한 도장재의 사용을 권장 한다.
1.5 제출물
1.5.1 제출물 일반
(1) 수급인은 다음의 자료 등을 공사감독자에게 KCS 10 10 10에 따라 제출하여야 한다. (단, 특
별히 명시하지 않은 경우의 제출 시기는 해당 공사 착공 전으로 한다.)
1.5.2 시공상세도면
(1) 수급인은 설계도서에 일반적인 표준예시만 제시되어 현장여건에 따라 상세도와 상이한 부분
이 발생하는 구간 또는 시공부분 및 공사감독자가 지정하는 복잡한 시설물은 착공전에 시공상세
도를 작성하여 공사감독자의 확인 후 시공하여야 한다.
① 제작설치 세부 상세도
1.5.3 제품자료
(1) 공사감독자가 지정하는 자재에 대한 생산자, 생산지, 규격, 특성, 품질확인서, 설치지침서 등의
제품자료를 제출하여야 한다.
① 목재: 통나무, 판재, 각재, 합판
② 철강재: 강판, 강대 등
③ 합성수지재: 성형제품, 인조암, 아크릴판, 비닐 시트 등
④ 기타: 중고타이어 등
(2) 재료 및 마감일람표를 작성하여 해당공사 착공 전에 공사감독자의 승인을 받아서 시공한다.
(3) 제품에 도입되는 색상(또는 공사시방서에 정의된 주문 색상) 견본을 제출하여 승인을 받아야
한다.
(4) 합성수지제품은 기능과 미관, 재료의 물리성⋅화학성⋅기계성⋅전기성 등의 특성과 내구성에
대한 사전검토를 해야 하고, 이를 위해 제품시방 등을 제출하여야 한다.
(5) 새로운 유형의 시설을 도입할 경우에 특허권의 소유 및 변경은 별도계약조건을 따른다.
1.5.4 시공계획서
(1) 아래의 현장제작 설치시설에 대하여 공사시방서가 요구하는 기준을 달성하기 위한 제작 및
시공계획서, 작업절차서(Working Procedure)를 작업 개시 30일 전에 제출하여야 한다.
① 목재시설물
40 현장제작설치 시설
② 철강재시설물
③ 합성수지시설물
④ 조립형 시설물
⑤ 타이어 시설물
1.5.5 견본
(1) 공사감독자의 요구가 있는 경우 주요자재의 견본을 제출하여야 하며, 준공 시까지 비치하여
야 한다.
① 목재, 방부목재, 판재, 각재
② 철강재 자재
③ 합성수지제품 재료 견본
④ 도장용 도료 및 색상
(2) 그림 및 도안 등을 도입할 때에는 작업 전에 형태와 색채에 대하여 견본품을 제출하고 공사감
독자의 승인을 얻은 후 시행하여야 한다.
1.5.6 품질인증서류
(1) 자재의 KS 표시허가증 사본, 품질시스템(ISO 9000 시리즈) 사본, 시험성적서(품질시험 대행
기관)를 공사감독자에게 제출하여 확인을 받아야 한다.
(2) 목재: 목재방부 및 건조에 대한 시험성과표 및 확인서 등을 시설물 반입 시 공사감독자에게 제
출하여 확인을 받는다.
1.6 공사기록서류
(1) 수급인은 이 공사와 관련된 다음 사항의 확인․검사에 대한 공사감독자의 지시를 이행하여야
한다.
① 시공 중에 시행한 목재, 석재, 철재, 기타 시설물 재료에 대한 관리시험 성과표를 제출한다. 이
때 품질시험 시행 자격을 갖춘 자의 서명 날인이 있어야 한다.
1.7 운반, 보관, 취급
1.7.1 일반사항
(1) KCS 34 50 05(1.6)을 따른다.
1.7.2 아스팔트 싱글
< 해당사항없음>
1.7.3 목재
(1) 목재는 운반, 가공, 보관과정에서 파손, 변형, 흠집, 얼룩, 부패, 함수율 증가 등의 품질저하현
41 현장제작설치 시설 상이 발생되지 않도록 하여야 한다.
(2) 방부시킬 목재는 직사광선, 습기 또는 강우에 영향을 받지 않도록 바람이 잘 통하고 그늘진 장
소에 보관하여야 한다.
(3) 자연건조가 될 수 있도록 적치목재사이에 잔목으로 고정하는 등의 방법으로 목재사이를 띄워
야 한다.
(4) 목재방부 후 조립 시에 평균 함수율은 목재의 방부․방충처리 기준을 따른다.
(5) 사용될 목재방부제의 제품사양에 따른 보관 및 취급방법을 준수하여 보관하여야 한다.
1.7.4 도장재
< 해당사항없음>
1.8 현장수량검측
(1) 검측 단위는 동, 개소, 조 등으로 한다.
(2) 수량은 설계도서에 의해 설치, 완료된 개수를 의미하며 설치 후 뒷정리까지 끝난 상태를 기준
으로 한다.
2. 자재
2.1 재료
2.1.1 일반사항
(1) KCS 34 50 05(2.1.1)을 따른다.
2.1.2 목재
(1) 목재일반
① 목재의 규격은 KS F 1519, 목재제품의 규격과 품질기준을 따른다.
② 외부공간에 설치되는 시설의 시공에 사용되는 원목, 각재, 판재, 합판 등의 목재 가공품은 부패
방지를 위한 방부, 방충처리 및 표면보호를 위한 조치를 해야 한다.
③ 목재는 원목규격에 적합한 것으로 대기 중에서 내구력이 있고 용도에 적합한 강도의 품질을 갖
추어야 한다.
④ 목재는 설계도서에 따라 요구되는 내구성능에 부합되도록 방부 및 목부도장이 되어야 한다.
⑤ 목재는 큰 옹이, 균열, 부패 등이 없어야 하며 별도의 규정이 없는 경우 나무껍질을 벗겨서 잘
건조해야 한다.
⑥ 구조재 이음의 덧붙임은 구조재와 동종의 것으로 하고 쐐기는 참나무, 밤나무 등의 굳은 나무
로 한다.
⑦ 휨응력을 받는 부재는 아래쪽에 옹이, 갈라짐, 껍질박이, 혹 등의 흠이 없는 재료를 사용하여
구조적인 결함이 없도록 해야 한다.
⑧ 볼트⋅너트, 띠쇠, ㄱ자쇠, 감잡이쇠, 꺽쇠 등의 목구조용 철물은 KS F 4514 의 규정에 적합한
제품으로 사용상 갈라짐이나 흠, 녹, 비틀림 등의 결점이 없어야 하며, 부식되지 않거나 부식방지
42 현장제작설치 시설
코팅처리된 것이어야 한다.
⑨ 합판이나 집성목을 사용하여 시설을 제작 및 설치할 때에는 설계도서를 따른다.
(2) 통나무
① 통나무는 곧은 것을 사용하여야 한다. 단 공사감독자가 품질에 지장이 없다고 판단하여 별도로
인정한 경우에는 단면중앙을 연결하는 직선이 통나무 밖으로 나가지 않는 것은 사용할 수 있다.
② 통나무의 지름은 길이에 직각인 단면에서의 최소지름으로 한다. 그러나 단면이 타원형인 경우
는 장단경을 평균한 것을 지름으로 보며, 이때 단경은 장경의 8/10 이상이어야 한다.
③ 통나무는 껍질을 벗겨서 사용하여야 한다. 원목의 거친 표면의 자연스러움을 이용하기 위해 껍
질을 벗기지 않고 사용할 경우에는 껍질의 보존상태가 양호해야 한다.
(3) 판재 및 각재
① 판재는 목재의 두께가 0.075 m 미만이고, 폭이 두께의 4배 이상인 것으로 그 제재치수는 KS F
1519를 따른다.
② 각재는 목재의 두께가 0.075 m 미만이고 폭이 두께의 4배 미만인 것, 또는 두께 및 폭이 0.075
m 이상인 것으로 그 제재치수는 KS F 1519를 따른다.
(4) 합판
① 합판은 KS F 3101 규정에 적합한 보통합판을 사용한다.
② 장기 사용의 경우에는 수분에 직접 노출되지 않도록 하고, 외부 노출 시에는 반드시 방수 및 방
부처리를 해야 한다. 단 거푸집 등 가설공사 사용 시에는 예외로 한다.
③ 시설물의 자재로 사용되는 합판은 설계도서의 규격에 적합한 자재를 사용해야 하고 모서리는
매끄럽게 사포질하며 외부마감은 에폭시나 우레탄 등의 내수성이 있는 도장재로 마감해야 한다.
특히 단판의 결이 노출되는 부위는 철저하게 방수처리 해야 한다.
(5) 집성목
① 집성목의 품질은 생산업체의 기준을 따르며, 작업 전에 공사감독자의 승인을 받아야 한다.
2.1.3 철강재
(1) 재료일반
① 철강재시설에 사용되는 강판, 강관, 형강, 봉강, 스테인리스강재 등은 한국산업표준(KS), 설계
도서를 따른다.
② 강재는 시설에 소요되는 안전율을 고려한 허용강도 이상의 것을 사용하여야 한다.
③ 사용되는 재료 중 한국산업표준(KS)으로 지정되지 않은 재료는 제조업체의 제품자료를 제출하
여 재료의 적정성에 관한 공사감독자의 승인을 얻어야 한다.
④ 철강재는 재료특성에 따른 형상 및 구조적 성능에 적합하고 흠이나 녹이 없는 것을 사용해야
하며, 필요시 도금 및 녹막이 처리를 해야 한다.
43 현장제작설치 시설
⑤ 재료수급상 장기간의 보관이 필요한 경우에는 방청 및 손상방지에 대한 조치를 취해야 한다.
⑥ 비철금속 및 합금은 고유성분과 구조적인 특성을 갖는 합금을 사용해야 하며 한국산업표준에
규정되어 있는 것은 그 규격을 따르고 기타에 대해서는 설계도서를 따른다.
(2) 강판 및 강대 등
① 원형 철근은 KS D 3501 의 규정에 적합한 제품이어야 한다,
② 각관은 KS D 3568의 규정에 적합한 일반구조용 각형강관, 막음용 재료는 KS D 3503의 규정
에 적합한 일반구조용 압연강재 제품이어야 한다.
③ 강관은 KS D 3507의 규정에 적합한 일반배관용 탄소강관(흑관) 또는 KS D 3536의 규정에 적
합한 오스트나이트계의 기계구조용 스테인리스 강관 제품이어야 한다.
2.1.4 합성수지
< 해당사항없음>
2.1.5 도장재
< 해당사항없음>
2.1.6 기타 재료
(1) 기타 관련 재료의 규격은 설계도서를 따른다.
2.2 조립
(1) 철강재시설은 공장제작 후 현장조립설치하여야 하며 공사감독자의 요청이 있을 때는 공장제
작에 대한 검사를 해야 한다.
(2) 합성수지제품은 공장제작에 의한 현장조립설치하여야 하며 현장조립은 제시된 설치기준에
의해 시행되어야 한다.
(3) 합성수지제품을 소량 설치할 경우에는 모듈생산에 의한 제품을 선택하여 사용하지만 대량 설
치의 경우는 주문생산을 통해 고유의 형태, 색채를 지정하여 설치할 수 있다.
3. 시공
3.1 시공기준
3.1.1 토공 및 기초
(1) 이 기준에서 언급되지 않은 일반적인 사항은 KCS 34 50 05(3.2.1), KCS 34 50 05(3.2.2)를
따른다.
(2) 놀이시설의 기초지반이 불량한 경우에는 연약지반 개량, 잡석다짐 등을 시행하여 지반을 안
정시킨 후에 기초 콘크리트를 쳐야한다.
(3) 기초가 노출되거나 노출될 우려가 있는 부분의 모서리는 모따기를 한다.
(4) 기초는 흔들림이 없어야 하며 기초콘크리트가 마감표면에 노출되지 않도록 최종 마감높이보
44 현장제작설치 시설
다 0.05~0.1 m 이상 깊게 해야 한다.
(5) 기초와 연결되는 상부구조재는 정확한 수평과 수직을 유지한 상태로 가설치하고 콘크리트기
초를 쳐야 한다.
(6) 앵커볼트의 설치
① 2개 이상 설치되는 앵커볼트는 용접 등으로 앵커볼트 상호간을 고정시킨 후 콘크리트 안에 매
설해야 한다.
② 앵커볼트와 설치될 시설물과의 조합을 확인한 후, 앵커볼트 상호간을 고정시킨다.
③ 앵커볼트 중 콘크리트 바깥으로 나오는 부분은 콘크리트 안에 매설하기 전에 녹막이 페인트를
칠한다.
④ 앵커볼트는 설치될 시설물의 베이스 플레이트에 대하여 직각으로 매설되어야 한다.
3.1.2 목재시설
(1) 목재의 가공 및 제작
① 목재의 가공 및 제작은 목재구입 → 용도별 절단 → 박피⋅제재⋅깎기 → 구멍뚫기⋅따내기⋅모
다듬기 등 1차 가공 → 건조 → 방부처리 → 양생의 순서로 시행한다.
② 목재의 단면을 표시하는 치수는 마무리치수로 하며, 설계도서에 별도로 규정하지 않은 경우 에
는 건조, 수축, 대패질, 기타 마무리 여유를 두어 3~5 mm 정도 크게 제재해야 한다.
③ 목재 구멍은 공장 뚫기로 하되, 지나친 여분 구멍이 생기지 않도록 하고 여분 구멍은 벌레의 은
신처가 생기지 않도록 마감해야 한다.
④ 목재의 마감면은 별도의 규정이 없는 경우 모두 대패질 마무리를 하며, 마무리의 정도는 상⋅
중⋅하 구분 등급에서 상으로 한다. 단, 공사시방서에 별도로 규정이 있는 경우 이를 따른다.
표 3.1-1 대패질 마무리 정도
대패질 종별
상
중
하
평활도 뒤틀림 광선을 기울어지게 비추어서 거스러미 뒤틀림, 휨 및 욱음이 극히 미소하여 기준 및 대패자국이 전혀 없는 것 대를 대어 틈이 보이지 않는 것 거스러미 및 대패자국이 거의 없는 것
뒤틀림, 휨 및 욱음이 적고 기준대를 대어
틈이 근소하게 나는 것
다소의 거스러미 및 대패자국은 허용되 대단한 뒤틀림, 휨 및 욱음이 없고 도장 및 지만 톱자국이 없는 것 기타 마무리에 지장이 없는 것
⑤ 목재의 끝부분은 둥글게 마무리해야 하고 기둥의 갈라짐을 예방하며 신축성을 높이기 위해 목
재의 섬유방향으로 각 면의 중앙부에 선형의 홈을 줄 수 있다.
⑥ 목재의 건조는 자연건조법과 인공건조법을 사용할 수 있으며, 시공기간, 비용의 경제성, 목재
의 품질을 고려하여 적절한 건조법을 선택해야 한다.
⑦ 목재의 자연건조는 적정한 온도, 습도, 풍속 조건 하에서 시행하여 목재의 방부․방충처리 기준
에 적합하도록 하며, 인공건조를 할 경우에는 1~3개월 정도 자연 건조된 목재를 사용해야 한다.
45 현장제작설치 시설
(2) 목재의 방부
① 조경시설용 목재의 방부는 목재의 방부․방충처리 기준에 적합하도록 하며, 필요한 경우 별도의
방충 및 방연처리를 시행한다. 방부제, 방충제, 방연제의 품질, 종류, 종별, 용제 및 농도는 공사시
방서를 따른다.
② 방부처리는 개설법, 가압법, 침지법, 도포법, 주입법, 표면탄화법, 뿜칠법으로 구분하며, 사용
환경과 용도에 따라 적절한 방법을 사용하여야 한다.
③ 목재의 가압식 방부처리방법은 KS F 2219에 따르며, 별도의 방부방법은 공사시방서를 따른
다.
④ 방부처리된 목재가 절단, 대패질 등의 추가가공이 되었을 경우에는 가공부위에 대하여 방부제
를 도포하여 방부성능이 저하되지 않도록 해야 한다.
(3) 이음 및 접합
① 목재와 목재의 직접이음
가. 이음 및 맞춤의 접촉면은 필요 이상의 끝파기, 깎아내기 등을 하지 않도록 주의한다.
나. 톱켜기는 자름을 너무 깊게 하지 않도록 한다.
다. 목재는 이어 쓰지 않으며, 불가피할 경우 이어쓰는 목재의 길이는 1 m 이상이어야 한다.
라. 목재의 이음은 엇갈림 배치로 하고 이음맞춤의 물림정도는 꼭맞게 한다.
마. 이음으로 생긴 거스러미 등의 위험성이 있는 부분은 사포로 매끄럽게 처리한다.
바. 목재간의 접촉면적이 넓고 하중이 작은 경우에는 접착제에 의한 이음을 할 수 있으며 이때 사
용되는 접착제는 한국산업표준(KS)에 규정된 적정의 재료를 사용해야 한다.
② 금속재 및 이음재료에 의한 접합
가. 이음 금속재의 재질 및 치수는 한국산업표준(KS)을 따른다.
나. 띠쇠, 감잡이쇠 등의 금속재는 공사시방서에 정한 바가 없을 경우에는 두께를 3 mm 이상으
로 한다.
다. 금속재 구멍의 위치를 정확히 하고 그 구멍의 지름은 기준을 넘지 않도록 하여야 한다.
라. 꺾쇠는 처박을 때 부러지지 아니하는 양질의 것을 쓰고 갈고리 끝쪽에서 갈고리 길이의 1/3
이상의 부분을 뿔형으로 만든다.
마. 구조재의 못은 접합면에 수직으로 박고, 목재의 훅이 있는 부분에 못이 돌출되지 않게 그 위치
를 피한다.
바. 목재볼트의 구멍은 볼트지름 보다 3 mm 이상 커서는 안 된다.
사. 나사못은 틀어박아야 하며, 때려 박는 것은 피한다.
아. 나사 또는 볼트 상호간의 연결간격 및 재단부에서의 거리는 설계도서에 정한 바가 없으면 지
름의 7배 이상으로 한다.
자. 접합부분 또는 돌출부분은 표면에서 돌출되지 않도록 해야 하고 불가피할 경우 돌출부위는
캡을 씌우도록 해야 한다.
46 현장제작설치 시설
(4) 설치
① 설치위치는 설계도서에 따르며 공사감독자의 지시를 받아야 한다.
② 설치 시에는 수직, 수평이 잘 맞아야 하고 뒤틀림이 없이 직선이어야 한다.
③ 목재기둥은 감잡이쇠를 이용하여 붙임 볼트 등으로 연결하여 지지시킨다. 단 목재를 지하에 매
립시킬 경우에는 지표면과 접하는 부위에 별도의 방부 및 방충처리를 해야 한다.
(5) 도장 및 마무리
① 목재시설물을 설치한 후 시설물의 모서리, 위험성이 있는 곳, 거스러미가 있는 부분은 둥그렇
게 모를 따고 그라인더나 사포 등으로 연마한다.
② 볼트구멍 주위, 맞물림 부분, 목재와 이음재료 부분은 매끄럽게 처리하고 볼트머리는 톱밥이나
캡을 사용하여 묻히도록 한다.
③ 목재에 균열이 발생했을 경우에는 동일 성분과 색채를 가진 톱밥이나 퍼티로 충진하고 표면을
평활하게 다듬어야 한다. 단, 균열의 정도가 심할 경우에는 공사감독자의 지시에 따라 보완조치를
해야 한다.
④ 공사 중에 손상의 우려가 있거나 보호가 필요한 부분은 토분먹임, 종이붙이기, 널대기 등의 적
당한 방법으로 보양한다.
⑤ 도장면의 보호를 위하여 완전히 건조될 때까지 보양을 해야 하며, 필요한 경우에는 줄을 치거
나 경고안내판을 설치해야 한다.
⑥ 화재 및 폭발 등의 안전사고를 방지하기 위해 도장재와 용재, 기타 인화성 재료는 취급에 주의
를 해야 하며, 청결한 상태에서 작업이 되도록 해야 한다.
⑦ 기온 5℃ 이하, 습도 85% 이상, 혹서기, 강우 시에는 도장을 하면 안 되며, 맑고 건조하며 바람
이 없는 날 시행한다.
3.1.3 철강재 시설
(1) 녹막이 처리
① 강철제 및 금속제품은 녹막이처리 및 도금처리를 해야 한다.
② 비철금속 제품으로 이에 접하는 다른 재료에 의하여 부식을 받을 우려가 있을 때는 설계도서에
따라 방식처리를 한다.
③ 공장제작 후 녹막이칠을 해야 하며 운반이나 현장설치 중 도장이 손상된 부위는 재도장해야 한
다.
(2) 가공
① 절단
가. 강판을 절단할 때에는 미리 선을 긋고 강판이 우그러지거나 변형되지 않도록 주의하여 절단
한다.
나. 절단기로 절단할 수 없는 두께의 것은 톱절단이나 가스절단을 해야 한다.
47 현장제작설치 시설
다. 절단후 생긴 뒤말림과 찌그러짐은 줄 및 스크레이퍼로 마무리해야 한다.
라. 스테인리스강재를 절단할 때는 스테인리스강재전용 절단기를 사용해야 한다.
마. 절단규격은 추가 가공에 의해 수축변형 및 마무리를 고려하여 실제 규격보다 약간 크게 해야
하며 그 기준은 공사시방서를 따른다.
② 구멍뚫기
가. 볼트, 앵커볼트, 철근 관통구멍은 드릴뚫기를 하여야 하며 지름 13 mm 이하인 경우 전단구멍
뚫기도 가능하다. 단 구멍의 크기가 30 mm 이상인 경우 공사감독자의 승인을 얻어 가스구멍뚫
기도 가능하다.
나. 공장에서 구멍뚫기를 하고 지나치게 여분구멍이 크지 않도록 해야 한다. 드릴이 휨이 있으면
구멍을 크게 하므로 휨이 없어야 하며 부재표면에 직각을 유지하고 정규의 위치에서 작업한다.
구멍뚫기후 구멍 주변의 흘림, 끌림, 쇳가루 등을 완전히 제거한다.
다. 얇은 판에 구멍을 뚫을 때에는 흠이 나기 쉬우므로 고무받침이나 목재받침을 끼운 후 작업을
해야 한다.
라. 부재의 두께가 리벳, 볼트의 공칭직경에 3 mm 를 가산한 값보다 클 경우에는 서브 펀치(sub
punch)한 다음 리머(reamer)로 넓혀도 가능하다. 펀치로 인하여 구멍주위에 미세한 균열이 생기
는 경우 예정직경보다 3~6 mm 정도 적게 서브 펀치하여 리머를 예정직경까지 구멍을 넓히면서
균열을 제거해야 한다.
마. 스테인리스강재의 구멍뚫기는 스테인리스강재전용 드릴날을 사용해야 한다.
③ 성형
가. 성형에 따르는 마무리 치수는 정확하고 표면에 가공흠 등이 없는 것으로 한다.
나. 강판의 절곡시 흠이 없게 하고 상온이나 가열가공을 하고 가열가공은 적열상태로 시행해야
한다.
다. 상온에서 구부림 내반경은 판 두께의 2배 이상으로 하여 강판이 꺾어지지 않도록 주의한다.
라. 구부림 부분의 주름살 수정은 관내에서 하고 끝에 강구를 붙인 강철선으로 빼내던가 여러 강
구를 밀어 넣어 행한다.
마. 강봉, 형강의 구부림은 설계도서를 따른다.
바. 변형을 교정할 때에는 평활한 규준반 또는 적당한 본틀 위에서 목재 또는 고무망치로 변형부
분 주위를 두드려 교정한다.
(3) 용접
① 용접 일반
가. 용접은 해당작업의 공인자격증을 소유한 용접공에 의해 시행해야 한다. 단 동등한 경험자로
용접에 관한 전문지식과 경험을 갖추고 있다고 공사감독자가 인정하는 경우에는 이 규정을 따르
지 않아도 된다.
나. 마무리형상은 용접에 의한 수축량과 찌그러짐 등의 변형을 고려하여야 한다.
48 현장제작설치 시설
다. 철강재의 용접은 가스용접, 불활성가스 아크용접, 아르곤가스용접 등의 방법을 사용하고 재료
및 부위별 용접방식의 선택은 설계도서를 따른다.
라. 모재의 용접면은 용접 전에 도료, 기름, 녹, 수분, 스케일 등 용접에 지장이 있는 것을 제거하여
야 한다.
마. 용접기와 부속기구는 용접조건에 알맞는 구조 및 기능을 갖고 안전하게 용접할 수 있어야 한
다.
바. 용접봉은 해당 한국산업표준에 합격된 것이어야 하고, 실제 사용할 위치와 기타 조건에 대하
여 제작자가 추천하는 크기와 분류번호를 가진 피복된 용접봉이어야 한다.
사. 용접봉은 습기를 흡수하지 않도록 보관하고 피복재의 박탈, 오손, 변질, 흡습, 녹이 발생한 것
은 사용해서는 안 되며, 흡습이 의심되는 용접봉은 재건조하여 사용하여야 한다.
아. 용접부 간격은 스페이서를 이용하여 조정해야 하며, 중심을 맞추기 위하여 관에 무리한 외력
을 가해서는 안 된다.
자. 예열이 필요한 경우에는 철강재의 화학성분, 두께, 온도 등의 특성을 파악하여 적절한 조건으
로 예열해야 한다.
차. 용접부분은 과도한 살돋움, 살붙임 또는 표면상태가 불규칙하여서는 안 되고, 그라인더 또는
줄칼로 매끄럽게 다듬어야 한다.
카. 우천 또는 바람이 심하게 불거나 기온이 0 ℃ 이하일 때에는 용접을 행해서는 안 된다.
타. 용접은 하향자세로 하고 관의 경우 회전하면서 한다.
파. 강관의 끝마무리는 관직경과 같은 크기에 강판으로 모가지지 않게 끝마무리 부분을 막는다.
하. 용접에 대한 검사는 육안검사를 하며, 공사감독자의 요청에 의해 비파괴검사를 할 수도 있다.
이때 발생되는 비용은 원인자 부담으로 한다.
② 가스용접
가. 산소아세틸렌용접에 사용되는 산소는 순도 98% 이상의 것을 사용하고 아세틸렌은 용해아세
틸렌을 사용하여야 한다.
나. 용접봉은 재질이 같은 공금을 사용하여야 하며, 공사감독자의 승인을 얻어 다른 것을 사용할
수 있다.
다. 노즐의 끝에는 플럭스가 붙지 않도록 주의해야 하며 용접 후 잔존한 플럭스는 완전히 제거한
다.
라. 용접봉은 선재를 사용하고 노즐구멍의 지름은 재료의 두께에 적합한 것을 사용한다.
마. 부재두께의 20~30배 간격으로 가붙임을 하고 망치로 우그러진 것을 편 다음 중간부위 부터
좌우로 정붙임을 한다.
바. 용접은 1회로 하여야 하며, 특히 수밀⋅기밀을 요할 때에는 반드시 준수되어야 한다.
③ 불활성가스 아크용접
가. 모재의 재질에 따른 용접조건 및 용접부의 형상은 설계도서를 따른다.
나. 플럭스에 의한 부식의 우려가 있는 곳, 열영향을 고려해야 하는 곳 또는 수직면 및 머리 위의
49 현장제작설치 시설
맞댄 용접은 이 방법에 의한다.
다. 용접기는 고주파 발생장치를 가진 교류용접기를 사용한다.
라. 토오치는 가스캡, 텅스텐 전극 및 가스공급구멍을 가진 것을 사용한다.
마. 텅스텐 전극의 위치조절 또는 교환은 반드시 전원을 끈 후에 한다.
바. 토오치를 모재에서 약 3 mm 띄어서 작은 원을 그리며 가열하고 모재의 표면이 녹기 시작하
면 균일한 속도로 용접하기 시작한다.
사. 토오치는 모재에 대하여 70~90° 각도를 유지하여 전진법으로 용접한다.
아. 부재두께가 6 mm 이상 일때에는 거듭용접을 한다.
④ 아르곤 가스용접
가. 스테인리스강재의 용접에는 아르곤 가스용접을 한다.
나. 아르곤 가스(argon gas)는 순도 99.9% 이상, 기압 14.7 MPa(150 ㎏f/㎠) 이하의 것으로 하
고 감압밸브 및 유량계를 통하여 사용한다.
(4) 볼트⋅리벳 접합
① 볼트 접합
가. 볼트, 너트, 와셔의 품질은 한국산업표준(KS)의 규정을 따르되 규정이 없는 경우 공사시방서
의 규정을 적용한다.
나. 볼트의 길이는 KS B 1002 의 부표 1에 명시되어 있는 호칭길이로 나타내고 조임길이는 조임
종료 후 너트 밖에 3개 이상의 나사선이 나와야 한다.
다. 와셔는 볼트머리 아래 및 너트 아래에 각각 한 장씩 사용하며 볼트머리 및 너트의 위치는 정연
하게 놓여야 한다.
라. 볼트조임은 핸드렌치, 임팩트렌치 등을 이용하여 느슨하지 않도록 조이며 구조상 중요한 부분
에는 스프링 와셔나 잠금기기가 붙은 것을 사용하여 풀림을 방지해야 한다.
마. 볼트는 나사를 무리하게 조여 손상되지 않도록 하고 정확하게 구멍 속으로 박아야 하며 볼트
박기중 볼트머리가 손상되지 않도록 해야 한다.
바. 볼트조임 전후에 불량볼트의 유무를 검사하고 불량볼트에 대해서는 교체 등 보완조치를 취해
야 한다.
사. 접합부의 접촉표면에는 페인트, 랙커 등의 마찰을 감소시키는 칠이 없어야 한다.
② 리벳 접합
가. 리벳의 품질은 한국산업표준(KS)의 규정을 따르며 규정이 없을 경우 설계도서를 따른다.
나. 리벳길이는 지름 및 조립되는 판의 두께에 따라 결정한다.
다. 리벳치기는 손치기 또는 기계치기로 하며, 기계치기인 경우 압축공기 또는 전동식 리벳터를
사용한다.
라. 리벳치기를 하는 동안 부재를 핀이나 볼트로 완전히 고정해야 하고 리벳구멍이 완전히 충진
되도록 한다.
마. 리벳치기 후에는 불량리벳의 유⋅무를 검사하여 불량리벳은 교체해야 한다.
50 현장제작설치 시설
(5) 설치
① 가설치를 할 경우에는 수직⋅수평이 잘 맞아야 하고 설계도서에 따라 지정된 위치에 바르게 설
치하고 정설치할 경우에는 설계도서에 따라 세밀히 시행한다.
② 철강재가 지표면에 접하는 부분은 부식을 방지하기 위하여 녹막이 도료를 2중으로 도장하거나
별도의 조치를 취해야 한다.
③ 기둥설치 시 기초콘크리트에 묻히는 부분은 철근을 가로로 덧붙여 흔들림을 방지하여야 한다.
④ 현장에 반입된 부재는 빠른 시간 내에 설치하며, 불가피하게 장기간 보관할 경우에는 적절한
조치를 취해야 한다.
⑤ 앵커볼트로 시설물의 상부와 기초부위를 고정할 때는 단단히 고정하여 이완되지 않도록 해야
한다.
(6) 도장
① 여러 차례 도장을 할 경우에는 반드시 앞에 시행된 도장 상태를 점검한 후 이상이 없을 때 다음
도장작업을 시행한다.
② 시설물의 공장제작 및 현장설치 후 모서리 부분은 둥글게, 용접부위는 부재의 원상태 표면과
같게 그라인더나 사포로 연마해야 하며 볼트구멍 주위, 접합부분 주위는 철강재의 거스러미가 없
게 매끄럽게 처리한 후 녹막이 도장을 해야 한다.
③ 외부마감도장 전에 녹막이 도장상태를 최종 점검하고 확인 후 시행하며 도장횟수 및 색채는 설
계도서를 따른다.
④ 철강재시설의 부식방지를 위해 합성수지 마감을 할 경우에는 작업 전에 표면을 사포로 평활하
게 다듬고 신너 등의 용제로 기름성분을 제거하며 폴리에스테르수지를 도포한 후 합성수지 피복
재를 밀착시켜 부착한다.
⑤ 화재 및 폭발 등의 안전사고를 방지하기 위해 도장재와 용재, 기타 인화성 재료는 취급에 주의
를 해야 하며, 청결한 상태에서 작업이 되도록 한다.
⑥ 기온이 5 ℃ 이하, 습도 85% 이상, 혹서기, 강우 시에는 도장을 해서는 안 되며, 맑고 건조하며
바람이 없는 날 시행한다.
⑦ 놀이시설에 색상도장을 할 경우에는 놀이 환경에 적합한 색상과 그림을 그려야 하며 작업전에
견본품을 제출하고 공사감독자의 승인을 얻어야 한다.
(7) 마무리
① 설치된 시설의 기능과 미관을 종합적으로 검사하여 미비되거나 정상작동되지 않는 경우에는
이를 보완해야 한다.
② 도장면의 보호를 위하여 완전히 건조될 때까지 필요한 경우에는 줄을 치거나 경고안내판을 설
치해야 한다.
③ 시설주변을 정리하고 시공중 발생된 잔재 및 쓰레기는 환경오염을 유발하지 않도록 적절한 방
법으로 제거한다.
51 현장제작설치 시설
④ 지속적인 보호 및 양생이 필요한 시설은 완성되기 전까지 이용을 하지 않도록 해야 한다.
3.1.4 합성수지시설 제작설치
< 해당사항없음>
3.1.5 조립형 시설물 제작설치
(1) 기성제품은 제조업자의 제작 및 설치시방과 도면에 따라 설치하되, 이 기준의 관련규정을 우
선 적용한다.
(2) 각 부재의 연결 상태가 양호하여 흔들림이 없어야 하며, 도장된 면에 흠이 있어서는 안 된다.
(3) 방부목재, 침투식 착색목재, 특수합판 등의 목재는 시설물의 기능에 지장을 줄 수 있는 홈이나
갈라진 곳이 없어야 한다.
(4) 시설 설치시 규준틀로 균형을 잡아서 수직, 수평이 되도록 시공하여야 한다.
(5) 철재공사, 목재공사, 도장공사 등은 해당공사의 관련 항목을 따른다.
3.2 시공허용오차
(1) 수직부재 : 높이 1 m 마다 수직 수평방향으로 ±5 mm
(2) 수평부재 : 길이 2 m 마다 ±5 mm
(3) 바닥과 지붕의 목재여유 틈은 최대 1 mm 를 넘어서는 안 된다.
3.3 현장품질관리
3.3.1 품질시험
(1) 품질시험 및 검사는 조경진흥법 및 건설기술진흥법과 이 기준의 해당 항목을 따른다.
52
KCS 34 50 20 옥외시설물
목
차
1. 일반사항 ···························································· 53
3. 시공 ································································ 57
1.1 적용범위 ··················································· 53
3.1 시공조건확인 ··········································· 57
1.1.1 요약 ························································ 53
3.2 시공기준 ··················································· 57
1.1.2 주요내용 ················································ 53
3.2.1 토공 및 기초 ········································ 57
1.2 참고기준 ··················································· 53
3.2.2 의자 ························································ 57
1.2.1 관련 법규 ·············································· 53
3.2.3 야외탁자 ················································ 57
1.2.2 관련 기준 ·············································· 53
3.2.4 퍼걸러 ···················································· 58
1.3 용어의 정의 ············································· 53
3.2.5 원두막 ···················································· 58
1.4 시스템 설명 ············································· 54
3.2.6 전통 정자 ·············································· 58
1.5. 제출물 ······················································ 54
3.2.7 휴게시설 지붕 ······································ 58
1.5.1 제출물 일반 ·········································· 54
3.2.8 음수대 ···················································· 58
1.5.2 시공상세도면 ········································ 54
3.2.9 화분대(플랜터) ······································ 58
1.5.3 제품자료 ················································ 54
3.2.10 울타리 및 잔디보호책 ······················ 58
1.5.4 시공계획서 ············································ 55
3.2.11 수목보호덮개 ······································ 58
1.5.5 견본 ························································ 55
3.2.12 휴지통 ·················································· 58
1.5.6 품질인증서류 ········································ 55
3.2.13 시계탑 ·················································· 58
1.6 품질보증 ··················································· 55
3.2.14 자전거보관대 ········································ 59
1.6.1 자격 ························································ 55
3.2.15 안내판 등 ············································ 59
1.7 운반, 보관, 취급 ····································· 55
3.2.16 화장실 ·················································· 60
1.7.1 일반사항 ················································ 55
3.2.17 관리소 ·················································· 60
1.8 현장수량검측 ··········································· 55
3.2.18 경관조명시설 ······································ 61
2. 자재 ···································································· 56
3.3 시공허용오차 ··········································· 61
2.1 재료 ··························································· 56
3.4 현장품질관리 ··········································· 61
2.1.1 일반사항 ················································ 56
3.4.1 품질시험 ················································ 61
2.1.2 목재 ························································ 56
2.1.3 점토벽돌 ················································ 56
2.1.4 점토기와 및 회반죽 ···························· 56
2.1.5 단청안료 등 단청재료 ························ 56
2.1.6 아스팔트 슁글 지붕재 ························ 56
2.1.7 막구조지붕재 ········································ 56
2.1.8 아크릴판 ················································ 56
2.1.9 도안용 비닐시트 ·································· 56
2.1.10 조명기구 ·············································· 56
2.1.11 옥외용 벤치 ········································ 56
2.1.12 기타 ······················································ 57
옥외시설물
1. 일반사항
1.1 적용범위
1.1.1 요약
(1) 이 기준은 공원, 도로, 보행자전용도로, 휴게소, 광장, 공개공지, 주거단지 등의 옥외공간에 설
치하는 안내시설, 휴게시설, 편익시설, 경관조명시설 등의 옥외시설물 설치공사에 적용한다.
1.1.2 주요내용
(1) 안내시설은 안내를 목적으로 주거단지, 공원, 광장, 가로 등의 옥외공간에서 설치되는 게시판,
안내표지판, 교통안내표시판, 상업광고 안내표지판 등을 말한다.
(2) 휴게시설은 휴게 및 휴식을 위한 시설로서 의자, 야외탁자, 퍼걸러, 원두막, 정자(전통정자 포
함)를 말한다.
(3) 편익시설은 편의를 제공하기 위한 시설로서 화장실, 관리사무소, 공중전화부스, 음수대, 화분
대, 수목보호덮개, 시계탑, 자전거 보관대 등을 말한다.
(4) 경관조명시설은 조경공간의 야경연출을 위한 조명시설을 말한다.
1.2 참고 기준
1.2.1 관련 법규
∙ 건설기술진흥법
∙ 도로교통법
∙ 조경진흥법
1.2.2 관련 기준
∙ KCS 10 10 10 공무행정요건
∙ KCS 31 85 60 조경전기설비
∙ KCS 34 50 05 조경시설물공통
∙ KCS 34 50 15 현장제작설치시설
∙ KCS 34 50 65 조경 급배수 및 관수
∙ KS F 3510 점토 기와
∙ KS F 4750 아스팔트 슁글
∙ KS G 4213 옥외용 벤치
∙ KS L 4201 점토벽돌
∙ KS M 3811 일반용 메타크릴 수지판
1.3 용어의 정의
내용 없음
53 옥외시설물
1.4 시스템 설명
(1) 옥외시설의 재료, 제작, 조립, 설치는 내구성, 기능성 및 안전성을 고려하여야 한다.
(2) 안내체계는 형태와 기능에 있어서 일관성이 있어야 하며, 해당공간의 고유한 안내체계가 있
는 경우 이 규정에 명시된 사항을 준용한다.
1.5 제출물
1.5.1 제출물 일반
(1) 수급인은 다음의 자료 등을 공사감독자에게 KCS 10 10 10에 따라 제출하여야 한다. (단, 특
별히 명시하지 않은 경우의 제출 시기는 해당 공사 착공 전으로 한다.)
1.5.2 시공상세도면
(1) 수급인은 설계도서에 일반적인 표준예시만 제시되어 현장여건에 따라 상세도와 상이한 부분
이 발생하는 구간 또는 시공부분 및 공사감독자가 지정하는 복잡한 옥외시설물은 착공 전에 시공
상세도를 작성하여 공사감독자의 확인 후 시공하여야 한다.
① 시설물 세부 설치 상세도
② 안내시설의 안내문, 도형 등 세부도형작업이 필요한 경우 색채의 배합을 포함한 상세도면
1.5.3 제품자료
(1) 공사감독자가 지정하는 자재 및 제품에 대한 생산자, 생산지, 규격, 특성, 품질확인서, 설치지
침서 등의 제품자료를 제출하여야 한다.
① 목재
② 점토벽돌
③ 점토기와 및 회반죽
④ 단청안료 등 단청재료
⑤ 아스팔트 슁글 지붕재
⑥ 막구조지붕재
⑦ 아크릴판
⑧ 도안용 비닐시트
⑨ 조명기구
(2) 기성제품인 경우 아래의 제품 자료를 추가하여 제출하여야 한다.
① 조립제품인 경우 부품목록, 개요, 수량이 작성된 부품개요서, 제작 및 설치도면, 시방서, 보증
서, 설치 및 유지관리지침서 등 관련 자료를 제출하여야 한다.
② 완제품의 경우 제품의 색채, 마무리 정도 및 제품업체의 시방서 등을 제출하여 공사감독자의
승인을 얻어야 한다.
③ 외국어로 표기된 것은 한글로 번역 제출하여야 한다.
54 옥외시설물
1.5.4 시공계획서
(1) 아래의 옥외시설물에 대하여 공사시방서가 요구하는 기준을 달성하기 위한 제작 및 시공계획
서, 작업절차서(Working Procedure)를 작업 개시 30일 전에 제출하여야 한다.
① 안내시설
② 휴게시설(파고라, 전통정자 등)
③ 편익시설(음수대, 화분대(플랜터), 화장실, 관리소 등)
④ 경관조명시설
1.5.5 견본
(1) 공사감독자의 요구가 있는 경우 주요자재의 견본을 제출하여야 하며, 준공 시까지 비치하여
야 한다.
① 목재(종류별 1개)
② 점토벽돌
③ 점토기와
④ 단청안료 등 단청재료
⑤ 아스팔트 슁글 지붕재
⑥ 막구조지붕재
⑦ 아크릴판
⑧ 도안용 비닐시트
⑨ 조명기구 견본품 각 1개(조명특성 및 배광곡선 포함)
⑩ 석재 견본(종류별 1 개)
1.5.6 품질인증서류
(1) 자재의 KS 표시허가증 사본, 품질시스템(ISO 9000 시리즈) 사본, 시험성적서(품질시험 대행
기관)를 공사감독자에게 제출하여 확인을 받아야 한다.
1.6 품질보증
1.6.1 자격
(1) 전통정자는 전통적인 형태와 규모, 공법에 따라 전문기술자가 시공하여야 한다.
1.7 운반, 보관, 취급
1.7.1 일반사항
(1) KCS 34 50 05(1.6)을 따른다.
1.8 현장수량검측
(1) 검측 단위는 동, 개소, 조 등으로 한다.
(2) 수량은 설계도서에 의해 설치, 완료된 개수를 의미하며 설치 후 뒷정리까지 끝난 상태를 기준
55 옥외시설물 으로 한다.
2. 자재
2.1 재료
2.1.1 일반사항
(1) KCS 34 50 05(2.1.1)을 따른다.
2.1.2 목재
(1) KCS 34 50 15(2.1.2)를 따른다.
2.1.3 점토벽돌
< 해당사항없음>
2.1.4 점토기와 및 회반죽
< 해당사항없음>
2.1.5 단청안료 등 단청재료
< 해당사항없음>
2.1.6 아스팔트 슁글 지붕재
< 해당사항없음>
2.1.7 막구조지붕재
< 해당사항없음>
2.1.8 아크릴판
< 해당사항없음>
2.1.9 도안용 비닐시트
< 해당사항없음>
2.1.10 조명기구
(1) KCS 31 85 60을 따른다.
2.1.11 옥외용 벤치
(1) 3인 이상이 휴식에 사용하는 고정식 옥외용 벤치는 KS G 4213 에 적합한 제품이어야 한다.
56 옥외시설물
2.1.12 기타
< 해당사항없음>
3. 시공
3.1 시공조건확인
(1) 시설물은 계획 지반고를 검토한 후 기초를 고정해야 하며 시설물 수직규격의 과부족이 발생
되지 않아야 한다.
(2) 시설물이 설치된 바닥면은 침하되지 않도록 다짐을 하며 바깥쪽으로 기울기를 두어 배수가
원활히 되도록 해야 한다.
(3) 경사면에 설치할 때는 시설물이 수평이 되도록 지반을 조성하며, 급경사 지역은 기반안정을
위하여 공사감독자와 협의하여 기반을 안정시키는 방법을 적용할 수 있다.
(4) 높이가 높은 시설물은 프라이버시 보호를 위하여 인접한 건축물의 창문 및 발코니 전면을 피
해 설치한다.
3.2 시공기준
3.2.1 토공 및 기초
(1) KCS 34 50 05(3.2.1), KCS 34 50 05(3.2.2)를 따른다.
3.2.2 의자
(1) 재료에 따라 목재공사, 철재공사, 기초․콘크리트 공사 등의 관련 기준을 적용한다.
(2) 의자기초 설치 시 포장면의 단면두께를 감안하여 정확한 높이로 시공하여야 한다.
(3) 기초 콘크리트 상단은 상부구조와의 연결을 위하여 평탄하게 마무리 되어야 하며, 기초 콘크
리트에 삽입하는 앵커위치에는 먹줄놓기를 하여 앵커가 수직으로 놓이도록 주의하여 시공한다.
(4) 각 부재의 모서리는 반구형으로 모따기를 해야 한다.
(5) 등받이 의자의 등과 맞대는 면의 경사각은 앉은 자세에서 편안하고, 전 길이에 걸쳐 일정해야
한다. 따로 정하지 않은 경우의 경사각은 110°로 한다.
(6) 사각의자의 4면이 이어지는 부분은 동일한 예각으로 완전맞춤이 될 수 있도록 한다.
(7) 볼트 접합부위는 빈틈이 없이 볼트를 조여야 한다.
(8) 좌판 및 등판을 구조체와 볼트로 연결할 때는 볼트의 머리부분을 판에 묻히게 하고 구멍을 매
립하거나 캡을 씌운다.
(9) 볼트의 구멍은 정면에서 보아 일직선상에 있도록 해야 한다.
(10 )발밑 부분은 배수가 잘되도록 처리한다.
(11) 이동식 야외탁자는 지지부위가 균형을 이루도록 수평을 정확히 맞추어야 한다.
3.2.3 야외탁자
(1) 받침기둥, 탁자면, 의자면은 이 기준의 3.2.2 를 따른다.
(2) 야외탁자는 지지부위가 균형을 이루도록 수평을 맞추어야 한다.
57 옥외시설물
(3) 탁자면은 빈틈이 없고, 이물질의 제거가 용이한 표면마감을 해야 한다.
(4) 고정식 야외탁자의 기초 설치 시 포장면의 단면두께를 감안한 높이로 시공하여야 한다.
3.2.4 퍼걸러
< 해당사항없음>
3.2.5 원두막
< 해당사항없음>
3.2.6 전통 정자
< 해당사항없음>
3.2.7 휴게시설 지붕
< 해당사항없음>
3.2.8 음수대
< 해당사항없음>
3.2.9 화분대(플랜터)
< 해당사항없음>
3.2.10 울타리 및 잔디보호책
< 해당사항없음>
3.2.11 수목보호덮개
(1) 포장구간에 사용하는 수목보호덮개는 답압 또는 차량하중으로 부터 견딜 수 있는 허용강도를
갖는 재료를 사용해야 한다.
(2) 토양접촉부위는 토양의 고결화를 방지할 수 있는 구조이어야 한다.
(3) 수목보호덮개와 받침틀은 견고하게 고정하고, 상부의 지주목과 결속이 가능해야 한다.
(4) 인접하는 포장재료와의 접속부는 틈이 생기지 않도록 포장마감하되, 포장공사와 협조하여 시
공한다.
3.2.12 휴지통
< 해당사항없음>
3.2.13 시계탑
< 해당사항없음>
58 옥외시설물
3.2.14 자전거보관대
< 해당사항없음>
3.2.15 안내판 등
(1) 일반사항
① 야간의 식별을 위하여 표기는 야광도료를 사용하고 조명시설을 부대설치한다.
② 게시판의 경우 우천 시 게시물의 보호를 위하여 투명한 유리 또는 합성수지의 보호덮개를 설치
해야 한다.
③ 안내판은 설치위치에 따라 이용자가 전방을 주시했을 때 안내도와 실제 건물배치 방향이 일치
하도록 도안하여야 한다.
④ 안내시설의 설치위치는 많은 사람들이 이용하는 공간에 설치하고 높이는 성인을 기준으로 하
여 시각상 불편함이 없도록 해야 하며, 공사감독자의 사전승인을 받아 설치한다.
(2) 기초
① 일반적인 사항은 KCS 34 50 05(3.2.2)를 따른다.
② 설치에는 수직 및 수평이 맞아야 한다.
③ 바닥 기초와 볼트, 너트로 결합을 철저히 하여 바람에 의하여 흔들리거나 넘어지지 않도록 조
치한다.
④ 기초부분에 목재를 사용할 경우에는 지면에 접착되는 부분에 방부처리를 하고, 철재를 사용할
경우에는 이중 도장을 하여 녹슬음을 방지하여야 한다.
(3) 제작 및 설치
① 안내 및 표지판은 먼저 판을 제작 및 인쇄하고 설치 시에 인쇄 부분에 손상이 가지 않도록 유의
하여야 한다.
② 설치 후 시설물의 모서리, 위험성이 있는 곳, 거스러미가 있는 부분은 그라인더나 사포 등으로
연마해야 한다.
(4) 접합
① 각 접합부는 빗물이 새지 않도록 코킹재 주입 등 적절한 조치를 하여야 한다.
(5) 표기 및 인쇄
① 목재판에 음각 및 양각조각, 금속판(강판, 스테인리스강판, 황동판)에 음각 및 양각 부식, 법랑
판에 인쇄 등은 설계도서를 따른다.
② 표기 및 도안 색상은 설계도서와 공사시방서에 정한 바가 없을 때에는 주변환경과 조화될 수
있도록 한다.
③ 수작업에 의한 표기에는 작업 전에 글씨체와 문양에 대한 협의를 하여 시공결과물의 오차범위
59 옥외시설물
를 줄여야 한다.
④ 인쇄에 의할 때에는 필름판 제작 시 각 색상별로 차이가 없도록 처리해야 하며, 제판 시 스크린
사의 재료는 스크린의 망이 일정한 것을 사용하고, 인쇄 시에 색상별로 정확하게 부착 및 인쇄하
여 인쇄도중 밀리거나 수축하여 색이 이중으로 중복되지 않게 하여야 한다.
⑤ 인쇄용 잉크는 색도가 선명하고 질이 좋은 잉크를 사용한다.
⑥ 시트지 컴퓨터 도안 및 인쇄에서 부착하고자 하는 위치에 톰보(tombow)를 정확히 맞추어 고
정시킨 다음, 고무걸레를 이용하여 용해액을 밀어내면서 부착시킨다. 이때 한 방향 또는 바깥방향
으로 일정한 힘을 가하여 밀어내어 기포가 생기지 않도록 한다.
⑦ 컴퓨터 컷팅은 로고체, 타이틀체, 설명문체, 방향표시, 픽토그램 등을 컴퓨터에 입력한 뒤 시트
지를 절단기로 깨끗이 절단한다.
⑧ 금속판이나 법랑판 인쇄의 경우 열처리를 하고, 표면을 깨끗이 닦은 후 비닐 시트지를 부착하
고 조각의 경우에는 표면에 마감도료를 칠하고 먼지 등의 이물질이 없는 곳에서 경화시킨다.
⑨ 석재바탕 글자새김의 경우 형태와 크기는 설계도서에 의하며, 글자의 깊이는 특별히 정하지 않
는 한 글자 폭에 대하여 1/2 내지 같은 치수로 하고, 글자를 새기는 순서는 글자를 쓰는 순서와 동
일하게 한다.
⑩ 글씨 및 문양표기 작업이 끝난 후에는 마감표면상태를 정리하고 각 재료에 따른 적정한 보호양
생조치를 해야 한다.
(6) 도장
① 지지용 스테인리스 강관 및 강판은 헤어라인 처리를 하며, 밴딩 부위에 굴곡이 심하지 않아야
한다.
② 기둥 상부로부터 기둥 내로 빗물이 스며들지 않도록 한다.
③ 정전도장, 분체도장, 전착도장 등은 도장공장에서 작업하도록 해야 하며, 필요한 경우에는 제
작공장의 시설에 대한 사전검사를 해야 한다.
④ 목부도장 시에는 목재의 사용 용도에 적당한 함수율로 건조하고 기준에 맞는 방부․방충처리를
하여야 하며 표면마감처리를 한 후 도장을 해야 한다.
(7) 교통안내 표지판
① 도로에 설치하는 안전표지의 설치 및 관리는 도로교통법에 따라야 한다.
② 교통안전표시의 설치장소를 선정할 때는 도로이용자의 행동특성, 표지의 시인성, 도로이용에
장애여부, 도로관리상의 편리성을 고려하여 적정의 장소에 설치한다.
3.2.16 화장실
< 해당사항없음>
3.2.17 관리소
< 해당사항없음>
60 옥외시설물
3.2.18 경관조명시설
(1) KCS 31 85 60을 따른다.
3.3 시공허용오차
(1) 수직부재 : 높이 1 m 마다 수직 수평방향으로 ±5 mm
(2) 수평부재 : 길이 2 m 마다 ±5 mm
(3) 바닥마루판 사용 목재는 요철 및 거친 면이 없이 정밀히 시공되어야 한다.
3.4 현장품질관리
3.4.1 품질시험
(1) 품질시험 및 검사는 조경진흥법 및 건설기술진흥법과 이 기준의 해당 항목을 따른다.
① 점토기와 : 10,000매당 3매씩의 KS F 3510에 의한 휨파괴 하중시험
61
KCS 34 99 05 조경유지관리공통
목
차
1. 일반사항 ····················································································································································· 62
1.1 적용범위 ············································································································································· 62
1.2 참고 기준 ··········································································································································· 62
1.2.1 관련 법규 ········································································································································ 62
1.2.2 관련 기준 ········································································································································ 62
1.3 용어의 정의 ······································································································································· 62
1.4 시스템 설명 ······································································································································· 62
1.4.1 성능요구사항 ·································································································································· 62
1.5 제출물 ················································································································································· 62
1.5.1 제출물 공통사항 ···························································································································· 62
1.5.2 시공계획서 ······································································································································ 62
1.5.3 병.충해발생, 시설물 훼손 현장확인 보고서 ············································································ 63
1.6 공사기록서류 ····································································································································· 63
2. 자재 ····························································································································································· 63
3. 시공 ····························································································································································· 63
조경유지관리공통
1. 일반사항
1.1 적용범위
(1) 이 기준은 조경공간에 식재된 수목 및 초화류 등과 각종 조경시설물 및 포장 등을 포함한
조경공간 전체에 대한 유지관리 및 보수에 적용한다.
(2) 조경공사 또는 별개의 유지관리공사로 시행되는 경우에 적용하며, 공사내용으로 포함된
항목에 대하여만 적용한다.
1.2 참고 기준
1.2.1 관련 법규
∙ 조경진흥법
1.2.2 관련 기준
∙ KCS 10 10 10 공무행정요건
1.3 용어의 정의
내용 없음
1.4 시스템 설명
1.4.1 성능요구사항
(1) 조경진흥법 시행규칙 제7조에 따라 조경공사의 품질향상을 위한 조경공사 준공후의 사
후관리를 시행하여야 한다.
(2) 조경공간은 설계시 계획하였던 공간의 기능을 지속적으로 유지하여야 하며, 그 활용성이
향상될 수 있도록 관리되어야 한다.
(3) 조경공간에 반영된 생물은 단순한 생육이 아니라 성장에 의한 변화를 감안하여 조경공간
의 기능을 활성화 할 수 있도록 관리되어야 한다.
1.5 제출물
1.5.1 제출물 공통사항
(1) 수급인은 다음의 자료 등을 공사감독자에게 KCS 10 10 10에 따라 제출하여야 한다. (단,
특별히 명시하지 않은 경우의 제출 시기는 해당 공사 착공 전으로 한다.)
1.5.2 시공계획서
(1) 유지관리공사 착공계
① 수급인은 유지관리공사의 착공계를 공사감독자에게 제출하여야 한다.
② 수급인은 실 작업 착수 15일 전에 작업계획서 및 작업 완료시 아래의 자료를 첨부한 완료
보고서를 공사감독자에게 제출하여야 한다.
가. 시공상태 검측확인서
62 조경유지관리공통
나. 관련 증빙서류 : 자재 구매 영수증( 비료) 등
(2) 유지관리공사 준공
① 수급인은 최종 횟수를 시행한 뒤 매 횟수에 따른 유지관리보고서와 시공사진이 첨부된 유
지관리 종합보고서를 제출하여야 한다.
1.5.3 병․충해발생, 시설물 훼손 현장확인 보고서
(1) 수급인은 현장 내 병․충해 발생 또는 시설물의 훼손 발생 시, 작업 전에 미리 발생상태, 발
생정도 등을 현장조사하고, 유지관리 및 보수 작업계획을 수립 공사감독자와 협의하여 조치
하여야 한다.
1.6 공사기록서류
(1) 유지관리작업은 작업 전후의 작업상황이 명료하게 나타나도록 사진을 촬영·보관하여야
하며, 매 작업 종료마다 공사감독자의 확인·점검을 받아야한다.
(2) 공사감독자는 사진 및 현장을 답사하여 이행여부를 확인 및 점검한 후 시공자에게 이를
통지하여야 한다.
2. 자재
내용 없음.
3. 시공
내용 없음.
63
KCS 34 99 15 시설물 유지관리
목
차
1. 일반사항 ··················································································································································· 182
1.1 적용범위 ··········································································································································· 182
1.1.1 요약 ··············································································································································· 182
1.2 참고 기준 ········································································································································· 182
1.2.1 관련 법규 ····································································································································· 182
1.2.2 관련 기준 ····································································································································· 182
1.3 용어의 정의 ····································································································································· 182
1.4 공사기록서류 ··································································································································· 182
2. 자재 ··························································································································································· 182
2.1 재료 ··················································································································································· 182
2.1.1 조경시설재료 ······························································································································· 182
2.1.2 설비재료 ······································································································································· 182
2.1.3 포장재료 ······································································································································· 182
3. 시공 ··························································································································································· 183
3.1 시공기준 ··········································································································································· 183
3.1.1 공통사항 ······································································································································· 183
3.1.2 조경시설관리 ······························································································································· 183
3.1.3 설비관리 ······································································································································· 183
3.1.4 건물관리 ······································································································································· 184
3.2 사용재료별 관리 ····························································································································· 185
3.2.1 목재 ··············································································································································· 185
3.2.2 콘크리트재 ··································································································································· 186
3.2.3 철재 ··············································································································································· 187
3.2.4 석재 ··············································································································································· 187
3.3 완성품 관리 ····································································································································· 188
3.3.1 포장시설 ······································································································································· 188
3.3.2 배수시설 ······································································································································· 190
3.3.3 의자류 관리 ································································································································· 192
3.3.4 유희시설 ······································································································································· 193
3.3.5 수경시설 ······································································································································· 194
시설물 유지관리
1. 일반사항
1.1 적용범위
1.1.1 요약
(1) 이 기준은 시설물 공사의 준공 후 일정기간 또는 별도의 독립된 공종으로 시행되는 유지
관리에 관한 작업공정 중 기반·편익·놀이시설물 관리, 설비관리, 건축물 관리공사를 포함한
조경공간에 설치된 각종 시설과 구조물 등의 유지 관리공사에 적용한다.
(2) 조경시설물 및 포장 관리에 대한 제반사항을 포함하고 있으나, 필요한 경우 조경시설물
및 포장 등의 시공과 관련된 기준을 준용할 수 있다.
1.2 참고 기준
1.2.1 관련 법규
내용 없음
1.2.2 관련 기준
∙ KCS 34 50 00 조경시설물
∙ KCS 34 50 35 수경시설
∙ KCS 34 50 65 조경 급·배수 및 관수
∙ KCS 34 60 00 조경포장
1.3 용어의 정의
내용 없음
1.4 공사기록서류
(1) KCS 34 99 05(1.6)을 따른다.
2. 자재
2.1 재료
2.1.1 조경시설재료
(1) KCS 34 50 00을 따른다.
2.1.2 설비재료
(1) KCS 34 50 35, KCS 34 50 65를 따른다.
2.1.3 포장재료
(1) KCS 34 60 00을 따른다.
64 시설물 유지관리
3. 시공
3.1 시공기준
3.1.1 공통사항
(1) 시설물 유지관리의 목적은 시설의 기능을 충분히 발휘⋅활용하고, 안전하고 쾌적한 이용
을 하기 위한 것으로 시간의 경과에 따라 시설의 기능이 나빠지는 것을 방지하고, 나빠지거
나 손상된 부분은 보수하여 내구성을 복원하고 기능을 회복시키며 미관의 향상을 도모하여
야 한다.
(2) 시설물의 손상은 안전성을 위협하기 때문에 노화손상을 방지하는 예방보전과 손상에 대
한 보수, 교환을 행하여 안전성이나 기능성을 회복시키는 준공 후 보전을 행하여 기능을 유
지시켜야 한다.
(3) 예방보전
① 점검은 일상점검과 정기점검으로 구분하여 시행한다.
② 청소는 일상청소(원내 일반청소를 포함하여 원로측구, 의자, 야외탁자 등 이용시설의 청
소)와 정기청소(연못, 분수의 물빼기 청소, 안내판, 포장면의 오물청소 등), 특별청소( 개장기
간 전후의 수영풀 청소 등)로 구분하여 시행한다.
③ 미관의 유지와 방부, 방청을 위해 도장처리한다.
④ 가구 등의 교환
⑤ ① ~ ④의 작업은 작업계획을 수립하여 점검방법, 체크리스트, 이상발견시의 대응, 처리
방법을 포함한 점검요령을 작성하여 실시하여야 한다.
(4) 준공후 보전
관리주체는 시설의 내구성, 안전성을 위한 관리 작업을 시행해야한다.
① 임시점검
② 보수
(5) 기타(이용사항이나 관리상 필요성에 따라 행한다.)
① 보충
② 시설이전
③ 부분교체
3.1.2 조경시설관리
(1) 조경시설은 부분적으로 보수를 반복하거나, 내용(耐用)한도에 달했을 경우에는 전면적으
로 교체 또는 개조한다.
(2) 편익 및 유희시설은 교체·개조와 함께 이용 상황에 따라 보충이나 이전설치 또는 파손에
의한 교체작업을 행한다.
3.1.3 설비관리
(1) 설비관리는 설비, 기구자체의 보전과 더불어 적정한 운전이 가능하도록 정기적으로 각종
점검, 검사나 측정, 기록을 하여야 한다.
65 시설물 유지관리
(2) 관계법령의 관리기준에 따라 안전, 방재, 위생 등의 관리를 시행하고 동시에 이용의 특성
을 고려하며 자주적인 관리기준을 설정하여 기능유지를 도모하여야 한다.
(3) 급수시설
① 급수를 필요로 하는 장소의 급수전에 대해서는 일정한 압력과 사용상 필요한 수량을 유지
하기 위하여 물탱크 등의 적정한 용량과 급수펌프의 성능이 정상이 되도록 관리한다.
② 급수방법에 따라 수도법에 준하여 안전위생을 확보하여야 한다.
③ 배관계통 및 각종 기구의 누수, 파손 등의 정기적인 점검 및 보수를 실시한다.
④ 물탱크의 정기적인 청소 및 점검을 실시한다.
⑤ 정기적인 수질검사를 실시한다.
⑥ 사용수량의 확인, 수도미터기의 점검을 실시한다.
(4) 배수시설
① 배수를 원활하게 유출시키기 위해 각종 기구의 점검, 청소 및 정비를 행한다.
② 처리시설은 기구의 보전과 방류수 또는 재 이용수로서 수질유지를 위해 측정, 검사하고
그 결과에 따라 유량이나 농도를 조정하여야 한다.
③ 배수계통 및 각종 기구의 정기적인 청소, 점검 및 보수를 한다.
④ 처리시설의 운전, 작동성을 점검한다.
⑤ 처리시설의 운동조건을 조정한다.
⑥ 처리시설의 청소를 한다.
⑦ 유입수, 방류수 등의 수질검사를 한다.
3.1.4 건물관리
<해당사항없음>
66 시설물 유지관리
3.2 사용재료별 관리
3.2.1 목재
(1) 손상의 기본적인 성질
표 3.2-1 목재의 손상에 따른 보수방법의 예
손상의 종류
손상의 성질 인위적인 힘에
∙고의로 물리적인 힘을 가하거나 사용에 의한 손
의한 파손 상, 장비 및 자동차운전의 부주의로 발생 온도와 습도에
∙건조가 불충분하여 목재에 남아 있는 수액으로 인
의한 파손 한 부패
보수방법의 예
∙파손부분 교체 및 보수
∙파손부분을 제거한 후 나무못
박기, 퍼티채움
∙교체
∙균의 분비물이 목질을 용해시키고 균은 이를 양분
균류에 의한
으로 섭취하여 목재가 부패됨(균은 20~30 ℃ 정도
∙유상 방균제, 유용성 방균제 , 수 피해 의 온도에서 발육이 왕성하고 목재의 함수율이 용성방균제 살포
20% 이상이어야 발육이 가능함 )
∙유기염소계통, 유기인계통 방
충류에 의한
피해
충제 살포
∙습윤한 목재는 충류에 의한 피해를 받기 쉬움
∙부패된 부분을 제거한 후 나무
못박기, 퍼티 등을 채움
∙교체
갈라짐에 의한
피해
∙목재의 수축팽창에 따른 갈라짐의 현상발생 ∙갈라짐 부분 충진제로 충진 (2) 보수 및 교체
① 부패되었을 경우 : 목재가 부패되었을 때에는 방충제나 방균제를 살포한다. 부패된 부분
을 보수 시에는 끌이나 대패, 칼 등을 이용하여 제거한 후 샌드페이퍼로 문지르고 나무못박
기 혹은 퍼티를 발라 건조시킨다.
② 갈라졌을 경우
가. 목재에 피복되어 있는 페인트 및 이물질을 깨끗하게 청소한다.
나. 퍼티를 갈라진 틈 사이에 빈틈없이 채우고 건조시킨다.
다. 목부와 퍼티를 바른 부분이 일치하도록 샌드페이퍼로 문지르고 마무리 한다.
라. 목재의 부패를 방지하기 위해 스테인 칠, 바니스 칠 등 도장처리를 한다.
③ 교체
가. 목재부분은 썩지 않도록 방부제를 칠하지만 부패된 곳은 교체한다.
나. 교체 시에는 충분히 건조된 재료를 사용하며 매끈하게 대패질한 후 주위재료와 동일하게
마감 처리한다.
67 시설물 유지관리
3.2.2 콘크리트재
(1) 손상의 기본적인 성질
표 3.2-2 콘크리트 손상에 따른 보수방법 의 예
손상의 종류
손상의 성질
극히 경미한 균열이 있어
큰 손상으로 발전할 위험
이 있음
콘크리트의
균열
균열이 상당히 진행되어
강재에 녹이 슮
손상이 진행되어 철근이
부식되고 콘크리트가 박리
되는 것
구조물에 치명적인 균열이
발생
콘크리트의 동해 혹은 황산염등으로 부식
표면부의 열화
특수한 골재에 의한 열화
(알카리 골재반응) 보수의 기본적 사항 보수방법의 예 균열된 부분을 봉하여 물의 침 실(SEAL)재료 표면을 입을 방지함 잘 봉함
균열된 부분에 실재(SEAL)를 주
입하여 물의 침입을 완전히 방
실재(SEAL)의 주입
지
∙부식된 철근을 노출시켜 녹을
∙철근의 녹을 제거한 후 제거한 후 박리 된 부분 충진함 에폭시 처리 ∙철근의 단면 결손이 있는 경우 ∙부분적 콘크리트 타설 에는 철근을 보강함 치환
콘크리트 단면에 내하력이 기대
되며 부가적 단면 보강이 필요
함
열화 된 부분을 타설치환, 표면
을 봉하여 물 혹은 식물의 침입
방지
∙필요단면의 부가
∙부분 혹은 전면타설
표층의 타설치환 혹은
표면의 도장
콘크리트의 내부 깊숙히 열화가 경미한 경우 필요 단면 진행된 경우 부가적인 단면보강 의 부가 혹은 전면 타설 이 필요함 치환
(2) 보수 및 교체
① 균열부위 보수
가. 표면실링 공법
(가) 0.2 mm 이하의 균열부에 적용하며 보수 시에는 와이어브러시로 표면을 청소한 후 에어
컴푸레셔 등으로 먼지를 제거하고 에폭시계 재료를 폭 5 cm, 깊이 3 mm 정도로 도포한다.
경우에 따라서는 타르에폭시 등의 방수성 재료도 사용된다.
(나) 알카리성 골재반응을 할 경우에는 초기상태(균열폭 W0.2 mm) 일지라도 폴리우레탄 등
으로 표면방수 실링하여 반응을 정지시킨다.
나. V자형 절단공법
(가) 균열부위 표면을 V 자형으로 잘라낸 후 충진재를 채워 넣는 방법으로 표면실링보다 확
실한 공법이다.
(나) 누수가 있는 곳에서 에폭시계 주입재의 사용이 적절치 못한 경우 V자형 절단공법이 효
과적이다. 누수를 방지하기 위하여 콘크리트를 V자형으로 절단하고 30~40 cm 간격으로 파
이프를 선단까지 삽입한 후 충진재를 주입하며 충진재가 경화한 다음 파이프를 통하여 지수
68 시설물 유지관리
재를 주입한다. 지수재료는 폴리우레탄계 수경성 발포재를 사용하는 것이 좋다.
(다) 균열폭이 큰 경우 시멘트반죽(Cement Paste)을 사용하는 것이 좋으나 최근에는 고분자
계 유제 혹은 고무유액을 혼입하는 것이 일반적이다.
(라) 주입재는 24시간 이상 양생시켜야 하며, 양생이 완료된 후 파이프를 뽑아내고 표면을 마
무리 한다.
② 연약부 콘크리트보수
가. 시공불량에 의한 공극, 동결융해작용, 알카리 골재반응 등에 의한 콘크리트의 부분적 부
식에 대하여 일반적으로 시멘트계 재료를 사용하며 모서리 일부의 보수, 조기강도를 필요로
하는 경우 등 특별한 경우에는 합성수지계 재료를 사용한다.
나. 시멘트 모르타르에 의한 보수
(가) 기존 콘크리트는 조골재 표면이 노출된 곳까지 모래분사한 다음 고압수로 청소한다. 보
수부분은 수표면에서 수직으로 절단하는 것이 좋고 내면에서는 원형으로 만들어 준다.
(나) 기존콘크리트의 연결재료는 중력비 1:1의 조강시멘트 혹은 세사 0~2 mm의 모르타르를
사용한다.
(다) 보수 모르타르의 혼화제에는 유동화 촉진제, AE제 등이 이용되며 비교적 엷은 보수층의
경우나 양생이 곤란한 경우 접착제를 혼입하는 것이 좋다.
다. 콘크리트 뿜어붙이기에 의한 보수
(가) 바탕처리는 규사를 사용한 모래분사가 가장 효과적이다
(나) 콘크리트 뿜어 붙이기의 경우 연결재는 필요하지 않으며 뿜어 붙이기층은 1회당2~5 cm
로 한다.
(다) 보수에는 건식법을 사용하며 호스로 공급한다.
③ 전면 재시공
가. 콘크리트 부재의 변형 또는 파손에 의해 부재의 내력이 부족해지고 수복이 어려운 경우
에는 부재의 일부 또는 전부를 철거하고 새로운 콘크리트부재로 교체한다.
나. 전면교체를 할 경우
(가) 파손이 심하여 부분보수가 곤란한 경우
(나) 전면 재시공이 경제적이라 판단된 경우
(다) 구조물 자체의 균열, 박리, 변형 등의 정도가 심하고 내력부족, 피로 등의 진행도가 큰 경
우
(라) 파손부분을 보수하였을 때 미관이 크게 손상될 경우
69 시설물 유지관리
3.2.3 철재
(1) 손상의 기본적인 성질
표 3.2-3 철재 시설 손상에 따른 보수방법의 예
손상의 종류
인위적인 힘
에 의한 파
손
손상의 성질 보수방법의 예
∙이용자가 물리적인 힘을 가하여 뒤틀리거나 휘어지거나 닳
아서 손상됨.
∙나무망치로 원상복구
∙용접부분의 파열, 볼트나 연결철물이 부러지거나 나사부분
∙부분절단 후 교체
이 풀리게 되어 손상을 초래함.
∙금속은 원래 땅속에 있을 때 산소, 황 등에 의해 안정된 상태
온도, 습도에
의한 부식
로 유지되고 있으며, 이와 같은 상태로 환원하려는 현상으로
∙샌드페이퍼로 닦아낸 녹이 생김. 후 도장
∙해안지방의 염분, 광산지대, 공장지대 등의 아황산가스 발생
∙부분절단 후 교체
으로 공기가 오염되어 있는 곳은 부식이 현저함
(2) 보수 및 교체
① 물리적인 힘에 의한 손상
가. 나무망치를 사용하여 원상복구하며, 심하게 형상이 변화된 부분을 절단하고 새로운 재료
를 사용하여 절단부분을 용접하여 원상태로 복구한다.
나. 용접할 때에는 브러시나 솔 등을 이용하여 페인트자국 및 이물질을 제거하고 용접한다.
다. 강우나 강설 등으로 용접부위가 젖어 있을 때나 바람이 심하게 불 때, 기온이 0℃ 이하일
때는 용접을 피한다.
라. 용접부분이 식을 때까지 기다렸다가 그라인더로 용접잔해를 갈아내고 도장한다.
② 부식에 의한 손상
가. 약하게 부식되었을 경우 녹슨 부위를 브러시나 샌드페이퍼 등으로 닦아낸 후 도장한다.
나. 부식의 상태가 심한 경우에는 부식된 부분을 절단하고 새로운 재료를 이용하여 용접한
후 원상태로 복구한다.
3.2.4 석재
(1) 파손부분의 보수
① 접착시킬 양면을 에틸알콜로 깨끗이 세척한 후 접착제(에폭시계, 아크릴계 등)로 접착한
다.
② 접착이 끝난 후에는 접착제가 완전 경화될 때까지 (약 24시간) 고무로프를 사용하여 견고
하게 잡아매어야 한다.
③ 석재의 접착은 접착시키는 양면에 요철 된 것을 감안하여 수지의 두께를 약 2 mm 이상
으로 한다.
④ 접착이 완료된 후 외부로 노출된 접착제는 메틸 에틸 케톤(M.E.K-세척제)으로 닦아내고
면다듬질을 한다.
⑤ 접착제의 사용은 반드시 대기 상온(7 ℃ 이상)에서 하여야 한다.
70 시설물 유지관리
(2) 균열부위의 보수
① 균열폭이 작은 경우는 표면실링공법을 적용한다.
② 균열폭이 큰 경우는 고무압식 주입공법을 적용한다.
(3) 백화현상 보수
① 석재 바닥 표면에 백화현상이 발생한 경우 염산 또는 발수제를 표면에 바르고 그라인더
로 표면을 갈아서 표면의 백화부분을 제거한 다음 물로 청소해야 한다.
3.2.5 합성수지재, 도기재
(1) 합성수지재는 강한 힘이나 열 등의 영향을 받으면 변형, 파손되고 도기제품은 돌이나 여
타 기구로 충격을 가하면 파손된다.
(2) 파손된 제품은 부분보수로 곤란하므로 교체한다.
3.3 완성품 관리
3.3.1 포장시설
(1) 친환경흙포장
① 점검 및 파손원인
가. 너무 건조하거나 심한 바람이 일면 먼지가 난다.
나. 강우 후 배수불량이거나 지하수에 의해 흙이 물을 흡수함으로써 연약화 된다.
다. 노면에 침투한 수분이 기온의 강하로 동결되었거나 서리가 내려 얼은 상태에서 기온 상
승으로 해동되면 지반이 질퍽해지거나 약해진다.
라. 자동차 통행량의 증가 및 중량화로 노면의 약화 또는 지지력이 부족하게 된다.
② 보수 및 시공방법
가. 개량
(가) 지반 치환공법: 지반토질이 점토나 이토인 경우 지지력이 약하고 동결융해로 파괴되므
로 동결심도 하부까지 모래질이나 자갈모래로 환토한다.
(나) 노면 치환공법: 노면자갈의 두께가 적거나 비산으로 적어지면 지지력이 약하게 되므로
노면 자갈을 보충하여 지지력을 보완한다.
(다) 배수처리 공법: 물의 침투를 방지하기 위하여 횡단구배유지, 측구 배수, 맹암거로 지하수
낮추기 등의 조치를 취한다.
나. 보수
(가) 흙먼지 방지: 일시적 방법으로는 살수를 하여 먼지를 억제한다. 또한 약품살포법과 역청
재료, 즉 아스팔트류의 혼합법이 있으나, 모두 일시적이다. 약품살포법에서는 고체 또는 액체
의 염화칼슘, 염화마그네슘, 식염 등을 사용한다.(0.4~0.5 kg/㎡ 살포)
(나) 노면요철부: 비가 온 뒤 차량통행으로 생긴 요철부는 배수가 잘되는 모래⋅자갈로 채워
잘 다지되 노면이 건조할 때는 물을 약간 살포 후 채운다. 노면의 요철이 심하거나 파도형 노
면일 때에는 근본적으로 정비해야 하며 노면자갈 포설 시는 그레이더로 시공한다.
(다) 노면 안정성 유지 : 노면 횡단경사를 3~5%로 유지하고 노면의 지표수가 고여 있을 때는
신속히 배제하여 노면의 안정을 기한다. 호박돌 등이 노면에 노출 시는 이를 제거하고 보토
71 시설물 유지관리
하며, 일정한 노면 두께를 유지토록 한다.
(라) 동상 및 진창흙 방지 : 흙을 비 동상성 재료(점토나 흙질이 적은 모래, 자갈)로 바꾸어 주
거나 배수시설을 하여 지하수위를 저하시킨다. 표면수가 흙속으로 스며들지 않도록 하고 필
요시 개거나 암거 등 배수시설을 설치한다,
(마) 도로배수 : 논이나 매립지 등의 도로나 극히 배수불량지역의 도로는 도로 양측에 폭 1
m, 깊이 1 m의 측구를 굴착하고 자갈, 호박돌, 모래 등의 재료로 치환하거나 노상층위에 30
cm이상의 모래층을 설치한다.
(2) 친환경블록 포장
① 점검 및 파손원인
가. 점 검
(가) 제품 자체 파손 : 블록모서리 파손, 블록 표면 시멘트 페이스트(paste)의 유실, 블록 자체
부서지기
(나) 시공불량 파손 : 블록포장 요철(평판의 부등침하), 블록과의 높낮이 차(±2 mm 이상), 포
장표면의 만곡
나. 파손 원인
(가) 블록 모서리 파손: 제품 자체의 소요강도(재료배합비 및 양생방법 기준)의 부족이나 무
거운 하중의 물건운반으로 발생한다. 또한 블록의 부등침하로 취약부분인 블록 모서리가 파
손되는 경우도 있다.
(나) 블록 자체 파손은 대부분 제품 생산과정의 불량으로 나타나는데 재료 배합비나 후기 양
생방법 및 기간의 부족이 주원인이다
(다) 블록 포장 요철, 블록과의 단차, 포장 표면의 만곡 : 이 경우는 지반 자체가 연약지반이거
나 노반의 쇄석 및 안전 모래층의 시공 잘못으로 부등침하 되어 일어난다. 특히 이로 인한 보
도의 요철은 보행자 통행에 위험을 주기 때문에 즉시 보수하여야 한다.
② 보수 및 시공방법
가. 보수할 위치 및 걷어낼 영향권을 결정한다(영향권은 보수공사 지점의 대소에 따라 상이
함).
나. 파손된 블록이나 침하된 지점의 블록은 걷어낸 다음 재 사용할 것은 분리한다.
다. 안정 모래층의 유실에 의한 침하 때는 시방에 맞는 높이의 모래를 보충 부설하고, 현저한
침하로 노반층까지 영향이 있을 때는 모래층을 걷어내고 노반층의 재료(쇄석 등)를 보충하여
두께 10 ~ 15 cm의 노반이 되도록 한다. 그 위에 모래를 3~5 cm 정도 균일하게 부설한다(수
평 및 설치기준선을 만들기 위해 실줄을 사용하며, 모래고르기 판자로 수평 고르기를 함).
라. 노반층이나 모래층은 부설후 반드시 기계전압(compacter)한다.
마. 모래층을 수평고르기한 다음(이 때 여유 모래량의 두께는 5 mm 정도가 좋다) 블록을 기
존형태 대로 깔아 나간다. (블록 수평을 잡기 위해 2~4 pound hammer를 밑에 나무 각재를
대고 때리면서 깐다)
바. 블록의 설치가 다 끝난 다음 새로운 모래 또는 규사를 평판블록 위에 뿌려서 이음새에 들
어가도록 빗자루로 쓸어 넣는다.
72 시설물 유지관리
사. 마지막 콤팩트 다짐을 한다.
(3) 조경일체형포장
① 주기적으로 고압분사기를 이용하여 물청소하여 흙, 먼지 등을 제거해야 하며 청소 후 표
면이 완전히 건조된 상태에서 탑코팅하여 포장의 수명을 연장시킨다.
3.3.2 배수시설
(1) 배수시설의 점검 및 파손원인
① 관리담당자는 배수시설의 상태를 정기적으로 점검하여 파손 및 결함이 있는 곳은 그 원인
을 조기에 발견하여 적절한 조치를 취해야 한다. 따라서 배수계통, 시설의 위치, 배치 및 구
조 등을 기록해 놓거나 이것을 도표로 작성해 두고, 점검 시에 이 시설대장을 휴대하고 각 배
수시설의 상태를 파악하여야 한다.
② 점검은 정기적으로 하는 것이 필요하지만 특히 많은 강우가 내리는 중에 또는 강우 직후
에 배수상황을 살펴보는 것은 배수기능의 결함을 발견하는데 효과적이다. 또한 태풍이나 이
른 봄비에 의해 잔설이 녹을 무렵 등에도 특히 염두에 두고 점검하도록 해야 한다.
③ 배수시설의 점검에 있어서 다음 사항에 주의하여야 한다.
가. 부지 배수시설의 배수상황 및 측구, 집수구, 맨홀 등의 토사 퇴적상태
나. 노면 및 갓길부 배수시설의 상황
다. 배수시설의 내부 및 유수구의 토사, 먼지, 오니, 잡석 등의 퇴적상태
라. 지하 배수시설, 유출구의 물 빠지는 상태
마. 비탈면 배수시설의 파손 및 결함상태
④ 배수시설의 점검은 파손 개소나 시설노후 및 불량개소를 찾는데 노력해야 한다. 지하 배
수관과 같이 직접보기 곤란한 배수관은 정기적으로 CCTV 촬영, 물을 흘려 넣어 보는 것과
같은 방법으로 토사의 퇴적상황 및 불량지점을 조사하면 좋다. 한 지역의 배수관이나 집수구
등에 쌓이는 오니 퇴적속도는 주변 환경조건 및 노면 청소횟수, 도로통행량 등에 의해 일정
하므로 상세한 퇴적량 조사 및 오니처리를 위해서는 특별한 환경변화가 없는 한 연간 청소계
획을 세워두는 것이 필요하다.
(2) 보수 및 시공방법
① 표면 배수시설
가. 측구
(가) 측구는 항상 그 기능을 충분히 발휘할 수 있도록 정기적인 점검과 청소를 해야 한다. 특
히 산림지역에서는 낙엽, 유출토사, 주거지역에서는 먼지, 오니 등에 막혀서 배수에 지장을
주는 일이 많기 때문에 주의해야 한다.
(나) 토사측구는 끊임없이 점검하여 잡초가 무성한 지역은 정기적으로 예초 및 제초 작업을
해야 한다. 또한 단면 및 저면 구배를 일정하게 유지하도록 노력함과 동시에 유수에 의한 토
사측구의 침식이나 퇴적이 현저한 지점을 필요에 따라 콘크리트 측구로 개조하는 것이 필요
하다.
(다) 콘크리트 측구는 그 측벽주위의 토압에 의해 눌려 넘어지거나 파손되는 일이 많다. 이런
73 시설물 유지관리
때는 측벽배면의 토사를 물이 잘 빠지는 것으로 치환하거나 구거통수 단면적에 여유가 있을
때는 측벽사이를 작은 들보로 지지해 주는 것이 좋다. 또한 제품으로 된 콘크트리트 U형 측
구는 가끔 국부적으로 침하되어 배수 시에 지장을 주는 경우가 있다. 이것은 콘크리트제품
측구사이의 연결이음새가 파손되어 누수가 됨으로써 기초지반의 세굴로 일어나는 경우가 많
다. 이때에는 파손부분 측구를 떼어 내어서 지반을 다진 후 교체 설치한다. 일반적으로 제품
(concrete precast)으로 된 측구는 연결이음새의 결함이 많기 때문에 주의해야 한다.
나. 집수구, 맨홀(manhole)
(가)집수구나 맨홀은 배수에 의해 흐른 물을 배수관으로 연결시키는 역할은 동일하지만, 집
수구는 어떤 형태에 의해 배수되는 물을 한 곳에 모아서 다시 배수계통으로 보내는 배수시설
이고, 맨홀은 지하배수관거를 점검하고 청소를 하거나 또는 전력, 통신케이블 관로의 접속과
수리 등을 위해 사람이 출입할 수 있는 통로라고 말할 수 있다. 따라서 집수구나 맨홀은 지하
배수시설을 유지 관리하는데 중요한 시설이다.
(나) 토사나 낙엽 등 찌꺼기가 쌓여서 물 빠짐이 방해되어 지표로 물이 유출되는 일이 있으므
로 정기적인 청소가 필요하다. 특히 태풍철, 해빙기 전에는 반드시 청소를 하는 것이 중요하
다.
(다) 지표면이 토사지나 황폐한 구릉의 경사면, 나지 및 자갈밭 등은 청소횟수를 늘리고, 집
수구 주변의 토사 또는 콩자갈 등이 유출되거나 지반이 침하되어 집수구가 솟아올라서 물의
유입이 되지 않게 될 때에는 주위 지반을 토사로 높이거나 집수구를 절단하여 낮추어 준다.
(라) 노면상의 집수구나 맨홀 등이 주변 지반의 침하나 포장재료의 균열 등에 의해 집수구 및
맨홀이 솟아 올라있거나 계속적인 포장 덧씌우기(overlay)나 패칭 (patching) 등으로 움푹 들
어가 있을 때는 통행에 위험하므로 즉시 조정하여 조치하여야 한다.
(마) 뚜껑이 분실 또는 파손되었을 경우는 위험하므로 보수 전에 표지판 및 울타리를 설치하
고 즉시 교체 또는 보수한다.
다. 배수관 및 구거
(가) 먼지나 오니 등에 의해서 통수 단면이 좁아져 있는지 설계통수단면이 충분하였는지를
관측, 판단하여 필요에 따라 개량한다.
(나) 관거, 구거의 누수나 체수가 발견될 때는 원인을 조사하여 즉시 보수한다.
(다) 기초가 불량하여 침하되거나 일정구간에 경사가 급격히 달라질 때는 배수기능을 상실하
거나 이음새부분에 누수가 생겨서 지반이나 노체, 성토부, 옹벽 등에 악영향을 미치기 때문
에 재 설치 또는 개량하여야 한다.
(라) 관거, 구거의 유출구에 갑자기 토사의 퇴적이 있을 때에는 지반 내의 관⋅구거에 구멍이
뚫렸거나 이음새에 균열이 발생해서 생기는 현상이므로 잘 조사하여 보수한다.
② 지하 배수시설
지하 배수시설의 유지관리는 다음 착안사항에 유의할 필요가 있다.
가. 지하배수시설은 설치년월과 배치위치, 구조 등을 명시한 도면을 별도로 만들어 놓는다.
나. 배수의 유출구는 항상 그 기능을 다하도록 주의를 기울인다.
다. 지하배수시설은 유출구 이외는 육안으로 보이지 않기 때문에 이 유출구가 항상 점검의
74 시설물 유지관리
대상이 된다. 비 온 뒤 또는 큰 장마 뒤에는 배수기능이 원활한지 여부를 유출구를 통해서 조
사하는 것이 편리하다.
라. 배수기능이 현저하게 떨어지던가 전혀 역할을 못할 때는 재설치가 필요하며, 이 때 기존
의 위치보다 다른 위치에 설치하는 것이 더 효과적이고 경제적일 때가 있다.
③ 비탈면 배수시설
가. 비탈면 배수시설이 잘못 되었을 때는 비탈면이 붕괴되어 교통장애 및 인명사고로 이어지
는 일이 많기 때문에 이미 설치된 기존 시설의 점검⋅유지관리는 물론 항상 그 기능을 유지
하도록 주의해야 한다.
나. 높은 성토비탈면의 소단 배수구 및 절⋅성토비탈면 상단에 설치한 비탈면 어깨 배수구는
정기적으로 점검하고, 배수구의 무너진 흙, 낙석, 잡초 등의 제거를 수시로 하는 것이 중요하
다.
다. 비탈면 종배수구를 U형 콘크리트 제품(precast)으로 설치할 경우에 지반의 부등침하로
구거 이음새가 떨어져서 어긋나게 된 경우가 많다. 이 때 이것을 방치하면 U형 배수구 밑으
로 물이 새어들고 비탈면이 세굴 되어 붕괴되는 일이 있기 때문에 즉시 재 설치하지 않으면
안된다. 또한 비탈면 어깨 배수구는 종배수구와의 접속점이 취약점이 되기 쉬우므로 상태를
늘 관찰하여 파손부위가 있으면 즉시 보수하여야 한다.
3.3.3 의자류 관리
(1) 손상부분 점검
표 3.3-1 의자류 손상부분 점검항목
구분
목재
콘크리트재
합성수지재
철재
점검항목
⋅접합부분, 갈라진 부분, 부패된 부분, 파손된 부분
⋅파손된 부분, 갈라진 부분, 침하된 부분, 마감부분처리상태 등
⋅갈라진 부분, 파손된 부분, 변형된 부분 등
⋅도장이 벗겨진 부분, 퇴색된 부분 등
⋅용접 등의 접합부분, 충격에 의해 비틀리거나 파손된 부분, 부식된 부분
(2) 전반적인 관리
① 이용자수가 설계시의 추정치보다 많은 경우에는 이용 실태를 고려하여 개소를 증설하며,
이용자의 편의를 도모한다.
② 여름철의 그늘이 충분치 않은 곳, 겨울철의 햇빛이 잘 들지 않거나 찬바람이 부는 장소에
설치된 시설은 차광시설 및 녹음수 등을 식재하거나 이설하여 이용자의 편의를 도모한다.
③ 바닥의 지면에 물이 고인 경우에는 배수시설을 설치한 후 흙을 넣고 충분히 다지거나 지
면을 포장한다.
④ 이용자의 사용빈도가 높은 경우 접합부분의 볼트, 너트가 이완된 곳은 충분히 조이거나
되풀림방지 용접을 한다.
75 시설물 유지관리
3.3.4 유희시설
<해당사항없음>
3.3.5 수경시설
<해당사항없음>
76